Los Angeles department of building safty logo Permit and Inspection Report banner
1101 S FLOWER ST 90015
APPLICATION / PERMIT NUMBER: 14010-10000-02811
PLAN CHECK / JOB NUMBER: B14LA11828

Plan Check and Permit Information


GROUP: Building
TYPE: Bldg-New
SUB-TYPE: Commercial
PRIMARY USE: (5) Apartment
WORK DESCRIPTION: MIXED USE DEVELOPMENT WITH APARTMENT, HOTEL, RESTAURANT, RETAIL, HEALTH CLUB IN A 49 AND TWO 40-STORY TOWER OVER 8-STORY PODIUM BUILDING WITH 2 LEVELS OF SUBTERRANEAN PARKING AND 5 LEVELS ABOVE GRADE PARKING
PERMIT ISSUED: Yes PERMIT ISSUE DATE: 05/23/2016 ISSUING OFFICE: Metro
CURRENT STATUS: Permit Expired CURRENT STATUS DATE: 02/02/2024

Permit Application Status History
Submitted 10/28/2014 APPLICANT
Assigned to Plan Check Engineer 11/13/2014 SUEN LIEU
Corrections Issued 11/25/2014 SUEN LIEU
Quality Review Completed 12/01/2014 CHARLES CHANG
Building Plans Picked Up 12/02/2014 APPLICANT
Applicant returned to address corrections 12/19/2014 SUEN LIEU
Applicant returned to address corrections 01/06/2015 SUEN LIEU
Applicant returned to address corrections 01/09/2015 SUEN LIEU
Applicant returned to address corrections 01/22/2015 SUEN LIEU
Applicant returned to address corrections 01/27/2015 SUEN LIEU
Applicant returned to address corrections 01/30/2015 SUEN LIEU
Applicant returned to address corrections 02/02/2015 SUEN LIEU
Applicant returned to address corrections 02/12/2015 SUEN LIEU
Applicant returned to address corrections 02/13/2015 SUEN LIEU
Applicant returned to address corrections 03/03/2015 SUEN LIEU
Applicant returned to address corrections 05/13/2015 SUEN LIEU
Applicant returned to address corrections 06/05/2015 SUEN LIEU
Applicant returned to address corrections 06/18/2015 SUEN LIEU
Applicant returned to address corrections 06/30/2015 SUEN LIEU
Applicant returned to address corrections 07/17/2015 SUEN LIEU
Applicant returned to address corrections 07/23/2015 SUEN LIEU
Applicant returned to address corrections 08/12/2015 SUEN LIEU
Applicant returned to address corrections 08/13/2015 SUEN LIEU
Applicant returned to address corrections 08/26/2015 SUEN LIEU
Applicant returned to address corrections 08/27/2015 SUEN LIEU
Applicant returned to address corrections 09/03/2015 SUEN LIEU
Applicant returned to address corrections 09/10/2015 SUEN LIEU
Applicant returned to address corrections 09/11/2015 SUEN LIEU
Applicant returned to address corrections 10/08/2015 SUEN LIEU
Applicant returned to address corrections 10/20/2015 SUEN LIEU
Applicant returned to address corrections 11/23/2015 SUEN LIEU
Applicant returned to address corrections 12/03/2015 SUEN LIEU
Applicant returned to address corrections 12/09/2015 SUEN LIEU
Applicant returned to address corrections 12/16/2015 SUEN LIEU
Applicant returned to address corrections 12/21/2015 SUEN LIEU
Applicant returned to address corrections 12/30/2015 SUEN LIEU
Applicant returned to address corrections 01/05/2016 SUEN LIEU
Applicant returned to address corrections 01/14/2016 SUEN LIEU
Applicant returned to address corrections 02/18/2016 SUEN LIEU
Applicant returned to address corrections 03/09/2016 SUEN LIEU
Applicant returned to address corrections 03/16/2016 SUEN LIEU
Applicant returned to address corrections 03/23/2016 SUEN LIEU
Applicant returned to address corrections 03/25/2016 SUEN LIEU
Applicant returned to address corrections 03/31/2016 SUEN LIEU
Applicant returned to address corrections 04/01/2016 SUEN LIEU
Applicant returned to address corrections 04/05/2016 SUEN LIEU
Applicant returned to address corrections 04/12/2016 SUEN LIEU
Applicant returned to address corrections 04/29/2016 SUEN LIEU
Applicant returned to address corrections 05/11/2016 SUEN LIEU
Plan Check Approved 05/23/2016 SAI KWAN KHUM
Issued 05/23/2016 LADBS
Permit Expired 02/02/2024 DENVER HARGIS

Permit Application Clearance Information
Low Impact Development Cleared 07/14/2015 AMMAR ELTAWIL
Stormwater Pollution Mitigatn Cleared 07/14/2015 AMMAR ELTAWIL
Address approval Cleared 08/04/2015 ARMENIA HERNANDEZ
Eng Process Fee Ord 176,300 Cleared 08/04/2015 ARMENIA HERNANDEZ
Work Adjacent to Public Way Cleared 08/04/2015 ARMENIA HERNANDEZ
Sewer availability Cleared 08/25/2015 ARMENIA HERNANDEZ
Bicycle Parking Cleared 12/07/2015 ARMENIA HERNANDEZ
Highway dedication Cleared 12/07/2015 ARMENIA HERNANDEZ
Permit Cleared 12/07/2015 ARMENIA HERNANDEZ
Roof/Waste drainage to street Cleared 12/07/2015 ARMENIA HERNANDEZ
Driveway location Cleared 03/30/2016 WESTON PRINGLE
Internal circulation Cleared 03/30/2016 WESTON PRINGLE
Specific Plan Cleared 03/30/2016 WESTON PRINGLE
Transportation Demand Ord. Cleared 03/30/2016 WESTON PRINGLE
Food Service Establishment Cleared 04/01/2016 RAMESHBHAIR PATEL
Fire Marshall Fire Life Safety Cleared 04/07/2016 ANDREW KO
CPC Cleared 04/08/2016 MARITZA PRZEKOP
Frnt yard landscape/Water mgmt Cleared 04/08/2016 MARITZA PRZEKOP
Green Code Cleared 04/08/2016 MICKEY YAMASHITA
Hydrant and Access approval Cleared 04/08/2016 JOHN CONNEALLY
Miscellaneous Cleared 04/08/2016 MARITZA PRZEKOP
Opn space landscape/Water mgmt Cleared 04/08/2016 MARITZA PRZEKOP
Prkng lot landscape/Water mgmt Cleared 04/08/2016 MARITZA PRZEKOP
Site Plan review Cleared 04/08/2016 MARITZA PRZEKOP
Specific Plan Cleared 04/08/2016 MARITZA PRZEKOP
Tract Map conditions Cleared 04/08/2016 MARITZA PRZEKOP
ZA Case Cleared 04/08/2016 MARITZA PRZEKOP
DAS Clearance Cleared 04/12/2016 WAI LAU
Metro Rail approval Cleared 04/12/2016 THAN WIN
Building over 3-story or 36-ft Cleared 05/05/2016 CALOSHA APPROVED
Excavation more than 5-ft deep Cleared 05/05/2016 CALOSHA APPROVED
Project located in CRA area Cleared 05/10/2016 JIM URQUHART
Encroachment in public way Cleared 05/23/2016 JAMES KHO
Hold Cleared 06/09/2016 PRECY SANCHEZ

Licensed Professional/Contractor Information
Architect Information
St, Amand Daun Paul; Lic. No.: C13000
333 S HOPE STREET
RTKL ASSOCIATES INC
LOS ANGELES, CA  90071
Contractor Information
Lend Lease (Us) Construction Inc; Lic. No.: 483550-B
200 PARK AVENUE 9TH FLOOR
ATTN GENERAL COUNSEL
NEW YORK, NY  10166
Contractor Information
Owner-Builder
  
Engineer Information
Conaway, Johnny Ray; Lic. No.: C19689
PO BOX 155
OAK VIEW, CA  93022
Engineer Information
Ghodsi, Afshin; Lic. No.: S3248
3621 HARBOR BL 125
SANTA ANA, CA  92704
Engineer Information
Tang, Stanley Siu Kei; Lic. No.: C56178
1105 N AVON STREET
BURBANK, CA  91505
Landscape Architect Information
Hung, Ying-Yu; Lic. No.: LA4374
811 WEST 7TH ST STE 430
LOS ANGELES, CA  90017

Inspection Activity Information

Inspector Information
NICK DANERI, (213) 202-5615
Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspection Request(s)
  No data available

Inspection Request History
  METHANE-Rough   07/25/2016   Not Ready for Inspection   LESLIE TRUJILLO
  Reinforced Concrete Frame   07/25/2016   Partial Inspection   LESLIE TRUJILLO
  Verify Sprinkler Sign Off   07/25/2016   Not Ready for Inspection   LESLIE TRUJILLO
  Footing/Foundation/Slab   07/28/2016   Partial Approval   LESLIE TRUJILLO
  METHANE-Barrier   07/28/2016   Partial Inspection   LESLIE TRUJILLO
  METHANE-Subgrade   07/28/2016   Partial Inspection   LESLIE TRUJILLO
  Green Building Rough   08/02/2016   Partial Inspection   DONALD CRICHLOW
  METHANE-Rough   08/04/2016   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   08/04/2016   Partial Approval   JAMES POWERS
  Verify Sprinkler Sign Off   08/04/2016   Not Ready for Inspection   JAMES POWERS
  METHANE-Rough   08/08/2016   Not Ready for Inspection   JAMES POWERS
  Verify Sprinkler Sign Off   08/08/2016   Not Ready for Inspection   JAMES POWERS
  METHANE-Barrier   08/10/2016   Not Ready for Inspection   JAMES POWERS
  METHANE-Subgrade   08/10/2016   Not Ready for Inspection   JAMES POWERS
  Reinforced Concrete Frame   08/10/2016   Partial Approval   JAMES POWERS
  METHANE-Rough   08/11/2016   Not Ready for Inspection   JAMES POWERS
  Reinforced Concrete Frame   08/11/2016   Partial Approval   JAMES POWERS
  Verify Sprinkler Sign Off   08/11/2016   Not Ready for Inspection   JAMES POWERS
  Footing/Foundation/Slab   08/12/2016   Partial Approval   JAMES POWERS
  METHANE-Barrier   08/12/2016   Not Ready for Inspection   JAMES POWERS
  METHANE-Subgrade   08/12/2016   Not Ready for Inspection   JAMES POWERS
  Deputy Reinf. Concrete   08/15/2016   Conditional Approval   NICK DANERI
  Excavation/Setback/Form/Re-Bar   08/15/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   08/16/2016   Partial Approval   JAMES POWERS
  METHANE-Rough   08/16/2016   Not Ready for Inspection   JAMES POWERS
  Reinforced Concrete Frame   08/16/2016   Partial Approval   JAMES POWERS
  Verify Sprinkler Sign Off   08/16/2016   Not Ready for Inspection   JAMES POWERS
  Deputy Reinf. Concrete   08/17/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   08/18/2016   Partial Approval   JAMES POWERS
  Footing/Foundation/Slab   08/18/2016   Partial Approval   JAMES POWERS
  METHANE-Barrier   08/18/2016   Partial Approval   JAMES POWERS
  METHANE-Subgrade   08/18/2016   Not Ready for Inspection   JAMES POWERS
  Deputy Reinf. Concrete   08/19/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   08/22/2016   Conditional Approval   LESLIE TRUJILLO
  Footing/Foundation/Slab   08/22/2016   Partial Approval   LESLIE TRUJILLO
  METHANE-Barrier   08/22/2016   Partial Inspection   LESLIE TRUJILLO
  METHANE-Subgrade   08/22/2016   Partial Inspection   LESLIE TRUJILLO
  Deputy Reinf. Concrete   08/23/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   08/24/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   08/25/2016   Conditional Approval   LESLIE TRUJILLO
  Footing/Foundation/Slab   08/25/2016   Partial Approval   LESLIE TRUJILLO
  METHANE-Barrier   08/25/2016   Partial Inspection   LESLIE TRUJILLO
  METHANE-Subgrade   08/25/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   08/26/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   08/26/2016   Partial Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   08/29/2016   Conditional Approval   LESLIE TRUJILLO
  Footing/Foundation/Slab   08/29/2016   Partial Approval   LESLIE TRUJILLO
  METHANE-Barrier   08/29/2016   Conditional Approval   LESLIE TRUJILLO
  METHANE-Subgrade   08/29/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   08/30/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   08/30/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   08/31/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   08/31/2016   Conditional Approval   LESLIE TRUJILLO
  METHANE-Rough   08/31/2016   Not Ready for Inspection   LESLIE TRUJILLO
  Reinforced Concrete Frame   08/31/2016   Not Ready for Inspection   LESLIE TRUJILLO
  Verify Sprinkler Sign Off   08/31/2016   Not Ready for Inspection   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   09/01/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Methane Barrier   09/01/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   09/01/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   09/02/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Methane Barrier   09/02/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   09/02/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   09/06/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   09/06/2016   Conditional Approval   LESLIE TRUJILLO
  Reinforced Concrete Frame   09/06/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   09/07/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   09/08/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   09/09/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   09/12/2016   Conditional Approval   LESLIE TRUJILLO
  METHANE-Rough   09/12/2016   Conditional Approval   LESLIE TRUJILLO
  Reinforced Concrete Frame   09/12/2016   Partial Approval   LESLIE TRUJILLO
  Verify Sprinkler Sign Off   09/12/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   09/13/2016   Conditional Approval   LESLIE TRUJILLO
  METHANE-Barrier   09/13/2016   Conditional Approval   LESLIE TRUJILLO
  METHANE-Subgrade   09/13/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   09/14/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   09/15/2016   Conditional Approval   LESLIE TRUJILLO
  METHANE-Rough   09/15/2016   Partial Approval   LESLIE TRUJILLO
  Reinforced Concrete Frame   09/15/2016   Partial Approval   LESLIE TRUJILLO
  Verify Sprinkler Sign Off   09/15/2016   Not Ready for Inspection   LESLIE TRUJILLO
  Deputy Reinf. Concrete   09/16/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   09/19/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   09/20/2016   Conditional Approval   LESLIE TRUJILLO
  METHANE-Rough   09/20/2016   Not Ready for Inspection   LESLIE TRUJILLO
  Reinforced Concrete Frame   09/20/2016   Not Ready for Inspection   LESLIE TRUJILLO
  Verify Sprinkler Sign Off   09/20/2016   Not Ready for Inspection   LESLIE TRUJILLO
  Deputy Reinf. Concrete   09/21/2016   Conditional Approval   LESLIE TRUJILLO
  Footing/Foundation/Slab   09/21/2016   Partial Approval   LESLIE TRUJILLO
  METHANE-Barrier   09/21/2016   Partial Approval   LESLIE TRUJILLO
  METHANE-Subgrade   09/21/2016   Approved   LESLIE TRUJILLO
  Deputy Reinf. Concrete   09/22/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   09/23/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   09/26/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   09/26/2016   Conditional Approval   LESLIE TRUJILLO
  METHANE-Rough   09/26/2016   Approved   LESLIE TRUJILLO
  Reinforced Concrete Frame   09/26/2016   Partial Approval   LESLIE TRUJILLO
  Verify Sprinkler Sign Off   09/26/2016   Approved   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   09/27/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   09/27/2016   Conditional Approval   LESLIE TRUJILLO
  Footing/Foundation/Slab   09/27/2016   Partial Approval   LESLIE TRUJILLO
  METHANE-Barrier   09/27/2016   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   09/28/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   09/28/2016   Conditional Approval   LESLIE TRUJILLO
  Reinforced Masonry Frame   09/28/2016   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   09/29/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   09/29/2016   Conditional Approval   LESLIE TRUJILLO
  Reinforced Concrete Frame   09/29/2016   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   09/30/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   09/30/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   10/03/2016   Conditional Approval   LESLIE TRUJILLO
  Footing/Foundation/Slab   10/03/2016   Partial Approval   LESLIE TRUJILLO
  METHANE-Barrier   10/03/2016   Partial Inspection   LESLIE TRUJILLO
  Deputy Reinf. Concrete   10/04/2016   Conditional Approval   LESLIE TRUJILLO
  Reinforced Concrete Frame   10/04/2016   Partial Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   10/05/2016   Conditional Approval   LESLIE TRUJILLO
  Reinforced Masonry Frame   10/05/2016   Partial Inspection   LESLIE TRUJILLO
  Deputy Reinf. Concrete   10/06/2016   Conditional Approval   LESLIE TRUJILLO
  Footing/Foundation/Slab   10/06/2016   Partial Approval   LESLIE TRUJILLO
  METHANE-Barrier   10/06/2016   Not Ready for Inspection   LESLIE TRUJILLO
  Deputy Reinf. Concrete   10/07/2016   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   10/08/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   10/11/2016   Conditional Approval   LESLIE TRUJILLO
  Reinforced Masonry Frame   10/11/2016   Partial Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   10/12/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   10/13/2016   Conditional Approval   LESLIE TRUJILLO
  Footing/Foundation/Slab   10/13/2016   Partial Approval   LESLIE TRUJILLO
  METHANE-Barrier   10/13/2016   Not Ready for Inspection   LESLIE TRUJILLO
  Deputy Reinf. Concrete   10/14/2016   Conditional Approval   LESLIE TRUJILLO
  Reinforced Concrete Frame   10/14/2016   Partial Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   10/17/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   10/18/2016   Conditional Approval   LESLIE TRUJILLO
  Reinforced Masonry Frame   10/18/2016   Partial Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   10/19/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   10/20/2016   Conditional Approval   LESLIE TRUJILLO
  Reinforced Concrete Frame   10/20/2016   Partial Approval   LESLIE TRUJILLO
  Deputy Other (see comments)   10/21/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   10/21/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   10/24/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   10/25/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   10/26/2016   Conditional Approval   LESLIE TRUJILLO
  Reinforced Concrete Frame   10/26/2016   Partial Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   10/27/2016   Conditional Approval   LESLIE TRUJILLO
  METHANE-Barrier   10/27/2016   Partial Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   10/28/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   10/31/2016   Conditional Approval   LESLIE TRUJILLO
  Reinforced Concrete Frame   10/31/2016   Partial Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   11/01/2016   Conditional Approval   LESLIE TRUJILLO
  Footing/Foundation/Slab   11/01/2016   Partial Approval   LESLIE TRUJILLO
  METHANE-Barrier   11/01/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   11/02/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   11/03/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   11/04/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   11/07/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   11/07/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   11/07/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   11/08/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   11/08/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   11/08/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   11/09/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   11/09/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   11/09/2016   Conditional Approval   LESLIE TRUJILLO
  Footing/Foundation/Slab   11/09/2016   Not Ready for Inspection   LESLIE TRUJILLO
  METHANE-Barrier   11/09/2016   Partial Inspection   LESLIE TRUJILLO
  Reinforced Concrete Frame   11/09/2016   Partial Inspection   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   11/10/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   11/10/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   11/10/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   11/14/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   11/14/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   11/14/2016   Conditional Approval   LESLIE TRUJILLO
  Pre-Inspection   11/14/2016   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   11/15/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   11/15/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   11/15/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   11/15/2016   Conditional Approval   LESLIE TRUJILLO
  Reinforced Concrete Frame   11/15/2016   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   11/16/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   11/16/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   11/16/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   11/16/2016   Conditional Approval   LESLIE TRUJILLO
  Footing/Foundation/Slab   11/16/2016   Partial Approval   LESLIE TRUJILLO
  METHANE-Barrier   11/16/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   11/17/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   11/17/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   11/17/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   11/17/2016   Conditional Approval   LESLIE TRUJILLO
  Reinforced Concrete Frame   11/17/2016   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   11/18/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   11/18/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   11/18/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   11/18/2016   Conditional Approval   LESLIE TRUJILLO
  Footing/Foundation/Slab   11/18/2016   Partial Approval   LESLIE TRUJILLO
  METHANE-Barrier   11/18/2016   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   11/21/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   11/21/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   11/21/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   11/21/2016   Conditional Approval   LESLIE TRUJILLO
  Reinforced Concrete Frame   11/21/2016   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   11/22/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   11/22/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   11/22/2016   Conditional Approval   LESLIE TRUJILLO
  Footing/Foundation/Slab   11/22/2016   Partial Approval   LESLIE TRUJILLO
  METHANE-Barrier   11/22/2016   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   11/23/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   11/23/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   11/23/2016   Conditional Approval   LESLIE TRUJILLO
  Pre-Inspection   11/23/2016   Partial Inspection   LESLIE TRUJILLO
  Deputy Reinf. Concrete   11/28/2016   Conditional Approval   LESLIE TRUJILLO
  Pre-Inspection   11/28/2016   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   11/29/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   11/29/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   11/29/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   11/29/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   11/30/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   11/30/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   11/30/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   11/30/2016   Conditional Approval   LESLIE TRUJILLO
  Reinforced Concrete Frame   11/30/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   12/01/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   12/01/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   12/01/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   12/01/2016   Conditional Approval   LESLIE TRUJILLO
  Footing/Foundation/Slab   12/01/2016   Partial Approval   LESLIE TRUJILLO
  METHANE-Barrier   12/01/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   12/02/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   12/02/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   12/02/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   12/02/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   12/05/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   12/05/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   12/05/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   12/05/2016   Conditional Approval   LESLIE TRUJILLO
  Reinforced Concrete Frame   12/05/2016   Partial Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   12/06/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   12/06/2016   Conditional Approval   LESLIE TRUJILLO
  Footing/Foundation/Slab   12/06/2016   Partial Approval   LESLIE TRUJILLO
  METHANE-Barrier   12/06/2016   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   12/07/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   12/07/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   12/07/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   12/07/2016   Conditional Approval   LESLIE TRUJILLO
  Pre-Inspection   12/07/2016   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   12/08/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   12/08/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   12/08/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   12/08/2016   Conditional Approval   LESLIE TRUJILLO
  Reinforced Concrete Frame   12/08/2016   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   12/09/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   12/09/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   12/09/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   12/09/2016   Conditional Approval   LESLIE TRUJILLO
  Footing/Foundation/Slab   12/09/2016   Partial Approval   LESLIE TRUJILLO
  METHANE-Barrier   12/09/2016   Partial Approval   LESLIE TRUJILLO
  Pre-Inspection   12/10/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   12/12/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   12/12/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   12/12/2016   Order to Comply Issued   JAMES POWERS
  Deputy Reinf. Concrete   12/12/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   12/12/2016   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   12/13/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   12/13/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   12/13/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   12/13/2016   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   12/14/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   12/14/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   12/14/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   12/14/2016   Conditional Approval   LESLIE TRUJILLO
  Footing/Foundation/Slab   12/14/2016   Partial Approval   LESLIE TRUJILLO
  METHANE-Barrier   12/14/2016   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   12/15/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   12/15/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   12/15/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   12/15/2016   Conditional Approval   LESLIE TRUJILLO
  Reinforced Concrete Frame   12/15/2016   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   12/16/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   12/16/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   12/16/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   12/16/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   12/19/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   12/19/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   12/19/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   12/19/2016   Conditional Approval   LESLIE TRUJILLO
  Footing/Foundation/Slab   12/19/2016   Partial Inspection   LESLIE TRUJILLO
  METHANE-Barrier   12/19/2016   Not Ready for Inspection   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   12/20/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   12/20/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   12/20/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   12/20/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   12/21/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   12/21/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   12/21/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   12/21/2016   Partial Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   12/21/2016   Conditional Approval   LESLIE TRUJILLO
  Reinforced Concrete Frame   12/21/2016   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   12/22/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   12/22/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   12/22/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   12/22/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   12/23/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   12/23/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   12/23/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   12/23/2016   Conditional Approval   LESLIE TRUJILLO
  Reinforced Concrete Frame   12/23/2016   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   12/27/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   12/27/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   12/27/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   12/27/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   12/28/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   12/28/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   12/28/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   12/28/2016   Conditional Approval   LESLIE TRUJILLO
  Reinforced Concrete Frame   12/28/2016   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   12/29/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   12/29/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   12/29/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   12/29/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   12/30/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   12/30/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   12/30/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   12/30/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   01/03/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   01/03/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   01/03/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   01/03/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   01/04/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   01/04/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   01/04/2017   Partial Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   01/04/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   01/04/2017   Conditional Approval   LESLIE TRUJILLO
  Reinforced Concrete Frame   01/04/2017   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   01/05/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   01/05/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   01/05/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   01/05/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   01/05/2017   Conditional Approval   LESLIE TRUJILLO
  Footing/Foundation/Slab   01/05/2017   Partial Approval   LESLIE TRUJILLO
  METHANE-Barrier   01/05/2017   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   01/06/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   01/06/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   01/06/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   01/06/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   01/06/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   01/09/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   01/09/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   01/09/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   01/09/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   01/09/2017   Conditional Approval   LESLIE TRUJILLO
  Reinforced Concrete Frame   01/09/2017   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   01/10/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Other (see comments)   01/10/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   01/10/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   01/10/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   01/10/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   01/10/2017   Conditional Approval   LESLIE TRUJILLO
  Footing/Foundation/Slab   01/10/2017   Partial Approval   LESLIE TRUJILLO
  METHANE-Barrier   01/10/2017   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   01/11/2017   Partial Approval   JAMES POWERS
  Deputy Other (see comments)   01/11/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   01/11/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   01/11/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   01/11/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   01/11/2017   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   01/11/2017   Not Ready for Inspection   JAMES POWERS
  Deputy Drilled-In Anchors   01/12/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Other (see comments)   01/12/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   01/12/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   01/12/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   01/12/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   01/12/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   01/13/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Other (see comments)   01/13/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   01/13/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   01/13/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   01/13/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   01/13/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   01/17/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Other (see comments)   01/17/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   01/17/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   01/17/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   01/17/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   01/17/2017   Conditional Approval   LESLIE TRUJILLO
  Reinforced Concrete Frame   01/17/2017   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   01/18/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   01/18/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   01/18/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   01/18/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Shotcrete   01/18/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   01/18/2017   Conditional Approval   LESLIE TRUJILLO
  Footing/Foundation/Slab   01/18/2017   Partial Approval   LESLIE TRUJILLO
  METHANE-Barrier   01/18/2017   Partial Inspection   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   01/19/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   01/19/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   01/19/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   01/19/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Shotcrete   01/19/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   01/19/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   01/20/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   01/20/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   01/20/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   01/20/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Shotcrete   01/20/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   01/20/2017   Conditional Approval   LESLIE TRUJILLO
  Reinforced Concrete Frame   01/20/2017   No Access for Inspection   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   01/23/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   01/23/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   01/23/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   01/23/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Shotcrete   01/23/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   01/23/2017   Conditional Approval   LESLIE TRUJILLO
  Footing/Foundation/Slab   01/23/2017   Not Ready for Inspection   LESLIE TRUJILLO
  METHANE-Barrier   01/23/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   01/24/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   01/24/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   01/24/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   01/24/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Shotcrete   01/24/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   01/24/2017   Conditional Approval   LESLIE TRUJILLO
  Reinforced Concrete Frame   01/24/2017   Partial Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   01/25/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   01/25/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   01/26/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   01/26/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   01/26/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   01/26/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   01/26/2017   Conditional Approval   LESLIE TRUJILLO
  Footing/Foundation/Slab   01/26/2017   Partial Approval   LESLIE TRUJILLO
  METHANE-Barrier   01/26/2017   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   01/27/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   01/27/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   01/27/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   01/27/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   01/27/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   01/30/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   01/30/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   01/30/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   01/30/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   01/30/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   01/31/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   01/31/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   01/31/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   01/31/2017   Conditional Approval   LESLIE TRUJILLO
  Footing/Foundation/Slab   01/31/2017   Not Ready for Inspection   LESLIE TRUJILLO
  METHANE-Barrier   01/31/2017   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   02/01/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   02/01/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   02/01/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   02/01/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   02/01/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   02/02/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   02/02/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   02/02/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   02/02/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   02/02/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   02/03/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   02/03/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   02/03/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   02/03/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   02/03/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   02/06/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   02/06/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   02/06/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   02/06/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   02/06/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   02/07/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   02/07/2017   Conditional Approval   LESLIE TRUJILLO
  Footing/Foundation/Slab   02/07/2017   Partial Approval   LESLIE TRUJILLO
  METHANE-Barrier   02/07/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   02/08/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   02/08/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   02/09/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   02/09/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   02/09/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   02/09/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   02/09/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   02/10/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   02/10/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   02/10/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   02/10/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   02/10/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   02/13/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   02/13/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   02/13/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   02/13/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   02/13/2017   Conditional Approval   LESLIE TRUJILLO
  Footing/Foundation/Slab   02/13/2017   Partial Approval   LESLIE TRUJILLO
  METHANE-Barrier   02/13/2017   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   02/14/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   02/14/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   02/14/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   02/14/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   02/14/2017   Conditional Approval   LESLIE TRUJILLO
  Reinforced Concrete Frame   02/14/2017   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   02/15/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   02/15/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   02/15/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   02/15/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   02/15/2017   Conditional Approval   LESLIE TRUJILLO
  Footing/Foundation/Slab   02/15/2017   Partial Approval   LESLIE TRUJILLO
  METHANE-Barrier   02/15/2017   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   02/16/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   02/16/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   02/16/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   02/16/2017   Conditional Approval   LESLIE TRUJILLO
  Pre-Inspection   02/16/2017   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   02/17/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   02/17/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   02/17/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   02/17/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   02/21/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   02/21/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   02/21/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   02/21/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   02/22/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   02/22/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   02/22/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   02/22/2017   Conditional Approval   LESLIE TRUJILLO
  Reinforced Concrete Frame   02/22/2017   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   02/23/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   02/23/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   02/23/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   02/23/2017   Conditional Approval   LESLIE TRUJILLO
  Footing/Foundation/Slab   02/23/2017   Partial Approval   LESLIE TRUJILLO
  METHANE-Barrier   02/23/2017   Partial Inspection   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   02/24/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   02/24/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   02/24/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   02/24/2017   Conditional Approval   LESLIE TRUJILLO
  Reinforced Concrete Frame   02/24/2017   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   02/27/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   02/27/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   02/27/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   02/27/2017   Conditional Approval   LESLIE TRUJILLO
  Footing/Foundation/Slab   02/27/2017   Partial Approval   LESLIE TRUJILLO
  METHANE-Barrier   02/27/2017   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   02/28/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   02/28/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   02/28/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   02/28/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   03/01/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   03/01/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   03/01/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   03/01/2017   Conditional Approval   LESLIE TRUJILLO
  Footing/Foundation/Slab   03/01/2017   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   03/02/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   03/02/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   03/02/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   03/02/2017   Conditional Approval   LESLIE TRUJILLO
  Reinforced Concrete Frame   03/02/2017   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   03/03/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   03/03/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   03/03/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   03/03/2017   Partial Approval   JAMES POWERS
  METHANE-Barrier   03/03/2017   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   03/03/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   03/06/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   03/06/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   03/06/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   03/06/2017   Conditional Approval   LESLIE TRUJILLO
  Excavation/Setback/Form/Re-Bar   03/06/2017   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   03/07/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   03/07/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   03/07/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   03/07/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   03/08/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   03/08/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   03/08/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   03/08/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   03/09/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   03/09/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   03/09/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   03/09/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   03/09/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   03/09/2017   Partial Approval   JAMES POWERS
  Deputy Shotcrete   03/09/2017   Partial Approval   JAMES POWERS
  Footing/Foundation/Slab   03/09/2017   Partial Approval   JAMES POWERS
  METHANE-Barrier   03/09/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   03/10/2017   Conditional Approval   KATY RAMIREZ
  Deputy Drilled-In Anchors   03/10/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   03/10/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   03/10/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   03/10/2017   Partial Approval   JAMES POWERS
  Deputy Shotcrete   03/10/2017   Partial Approval   JAMES POWERS
  Green Building Rough   03/10/2017   Not Ready for Inspection   DONALD CRICHLOW
  Reinforced Concrete Frame   03/10/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   03/13/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   03/13/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   03/13/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   03/13/2017   Conditional Approval   KATY RAMIREZ
  Deputy Shotcrete   03/13/2017   Partial Approval   JAMES POWERS
  Footing/Foundation/Slab   03/13/2017   Partial Approval   JAMES POWERS
  METHANE-Barrier   03/13/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   03/14/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   03/14/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   03/14/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   03/14/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Shotcrete   03/14/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   03/15/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   03/15/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   03/15/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   03/15/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Shotcrete   03/15/2017   Conditional Approval   LESLIE TRUJILLO
  Green Building Rough   03/15/2017   Not Ready for Inspection   DONALD CRICHLOW
  Reinforced Concrete Frame   03/15/2017   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   03/16/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   03/16/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   03/16/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   03/16/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Shotcrete   03/16/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   03/17/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   03/17/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   03/17/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   03/17/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   03/20/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   03/20/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   03/20/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   03/20/2017   Conditional Approval   LESLIE TRUJILLO
  Reinforced Masonry Frame   03/20/2017   Partial Inspection   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   03/21/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   03/21/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   03/21/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   03/21/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   03/22/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   03/22/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   03/22/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   03/22/2017   Conditional Approval   LESLIE TRUJILLO
  Footing/Foundation/Slab   03/22/2017   Partial Approval   LESLIE TRUJILLO
  METHANE-Barrier   03/22/2017   Partial Approval   LESLIE TRUJILLO
  Reinforced Concrete Frame   03/22/2017   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   03/23/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   03/23/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   03/23/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   03/23/2017   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   03/23/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   03/24/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   03/24/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   03/24/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   03/24/2017   Partial Approval   JAMES POWERS
  Footing/Foundation/Slab   03/24/2017   Partial Approval   JAMES POWERS
  Pre-Inspection   03/25/2017   Off-Hour Fees Due   
  Pre-Inspection   03/27/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   03/28/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   03/28/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   03/28/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   03/28/2017   Conditional Approval   LESLIE TRUJILLO
  Pre-Inspection   03/28/2017   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   03/29/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   03/29/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   03/29/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   03/29/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   03/30/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   03/30/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   03/30/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   03/30/2017   Conditional Approval   LESLIE TRUJILLO
  Reinforced Concrete Frame   03/30/2017   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   03/31/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   03/31/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   03/31/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   03/31/2017   Partial Approval   JAMES POWERS
  Footing/Foundation/Slab   04/01/2017   Partial Approval   JAMES POWERS
  METHANE-Barrier   04/01/2017   Not Ready for Inspection   JAMES POWERS
  Deputy Drilled-In Anchors   04/03/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   04/03/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   04/03/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   04/03/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   04/04/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   04/04/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   04/04/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   04/04/2017   Conditional Approval   LESLIE TRUJILLO
  Footing/Foundation/Slab   04/04/2017   Partial Inspection   LESLIE TRUJILLO
  METHANE-Barrier   04/04/2017   Not Ready for Inspection   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   04/05/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   04/05/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   04/05/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   04/05/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   04/06/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   04/06/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   04/06/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   04/06/2017   Conditional Approval   LESLIE TRUJILLO
  Footing/Foundation/Slab   04/06/2017   Partial Approval   LESLIE TRUJILLO
  METHANE-Barrier   04/06/2017   Not Ready for Inspection   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   04/07/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   04/07/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   04/07/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   04/07/2017   Conditional Approval   LESLIE TRUJILLO
  Reinforced Concrete Frame   04/07/2017   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   04/10/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   04/10/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   04/10/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   04/10/2017   Conditional Approval   LESLIE TRUJILLO
  Footing/Foundation/Slab   04/10/2017   Partial Approval   LESLIE TRUJILLO
  METHANE-Barrier   04/10/2017   Partial Inspection   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   04/11/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   04/11/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   04/11/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   04/11/2017   Conditional Approval   LESLIE TRUJILLO
  Reinforced Concrete Frame   04/11/2017   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   04/12/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   04/12/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   04/12/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   04/12/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   04/13/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   04/13/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   04/13/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   04/13/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   04/14/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   04/14/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   04/14/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   04/14/2017   Conditional Approval   LESLIE TRUJILLO
  Footing/Foundation/Slab   04/14/2017   Partial Approval   LESLIE TRUJILLO
  METHANE-Barrier   04/14/2017   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   04/17/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   04/17/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   04/17/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Shotcrete   04/17/2017   Conditional Approval   LESLIE TRUJILLO
  Reinforced Concrete Frame   04/17/2017   Partial Approval   LESLIE TRUJILLO
  Reinforced Masonry Frame   04/17/2017   Not Ready for Inspection   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   04/18/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   04/18/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   04/18/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   04/18/2017   Conditional Approval   LESLIE TRUJILLO
  Pre-Inspection   04/18/2017   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   04/19/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   04/19/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   04/19/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   04/19/2017   Conditional Approval   LESLIE TRUJILLO
  Footing/Foundation/Slab   04/19/2017   Partial Approval   LESLIE TRUJILLO
  METHANE-Barrier   04/19/2017   Partial Inspection   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   04/20/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   04/20/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   04/20/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   04/20/2017   Conditional Approval   LESLIE TRUJILLO
  Green Building Rough   04/20/2017   Not Ready for Inspection   RICHARD DOCKUS
  Reinforced Concrete Frame   04/20/2017   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   04/21/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   04/21/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   04/21/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   04/21/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   04/24/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   04/24/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   04/24/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   04/24/2017   Conditional Approval   LESLIE TRUJILLO
  Reinforced Concrete Frame   04/24/2017   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   04/25/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   04/25/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   04/25/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   04/25/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   04/26/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   04/26/2017   Conditional Approval   LESLIE TRUJILLO
  Reinforced Concrete Frame   04/26/2017   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   04/27/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   04/27/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   04/27/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   04/27/2017   Conditional Approval   LESLIE TRUJILLO
  Footing/Foundation/Slab   04/27/2017   Partial Approval   LESLIE TRUJILLO
  METHANE-Barrier   04/27/2017   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   04/28/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   04/28/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   04/28/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   04/28/2017   Conditional Approval   LESLIE TRUJILLO
  Reinforced Masonry Frame   04/28/2017   Partial Inspection   LESLIE TRUJILLO
  Reinforced Concrete Frame   04/29/2017   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   05/01/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   05/01/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   05/01/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   05/01/2017   Conditional Approval   LESLIE TRUJILLO
  Reinforced Concrete Frame   05/01/2017   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   05/02/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   05/02/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   05/02/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   05/02/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   05/03/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   05/03/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   05/03/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   05/03/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   05/04/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   05/04/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   05/04/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   05/04/2017   Conditional Approval   LESLIE TRUJILLO
  Reinforced Masonry Frame   05/04/2017   Partial Inspection   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   05/05/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   05/05/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   05/05/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   05/05/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   05/08/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   05/08/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   05/08/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   05/08/2017   Conditional Approval   LESLIE TRUJILLO
  Footing/Foundation/Slab   05/08/2017   Partial Approval   LESLIE TRUJILLO
  METHANE-Barrier   05/08/2017   Partial Inspection   LESLIE TRUJILLO
  Reinforced Concrete Frame   05/08/2017   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   05/09/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   05/09/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   05/09/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   05/09/2017   Conditional Approval   LESLIE TRUJILLO
  Reinforced Concrete Frame   05/09/2017   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   05/10/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   05/10/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   05/10/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   05/10/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   05/11/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   05/11/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   05/11/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   05/11/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   05/12/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   05/12/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   05/12/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   05/12/2017   Conditional Approval   LESLIE TRUJILLO
  Reinforced Concrete Frame   05/12/2017   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   05/15/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   05/15/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   05/15/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   05/15/2017   Partial Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   05/15/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   05/16/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   05/16/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   05/16/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   05/16/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   05/17/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   05/17/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   05/17/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   05/17/2017   Conditional Approval   LESLIE TRUJILLO
  Footing/Foundation/Slab   05/17/2017   Partial Approval   LESLIE TRUJILLO
  METHANE-Barrier   05/17/2017   Partial Inspection   LESLIE TRUJILLO
  Reinforced Concrete Frame   05/17/2017   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   05/18/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   05/18/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   05/18/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   05/18/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   05/18/2017   Conditional Approval   LESLIE TRUJILLO
  Reinforced Masonry Frame   05/18/2017   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   05/19/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   05/19/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   05/19/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   05/19/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   05/19/2017   Conditional Approval   LESLIE TRUJILLO
  Reinforced Concrete Frame   05/19/2017   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   05/22/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   05/22/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   05/22/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   05/22/2017   Conditional Approval   LESLIE TRUJILLO
  Footing/Foundation/Slab   05/22/2017   Conditional Approval   LESLIE TRUJILLO
  METHANE-Barrier   05/22/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   05/23/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   05/23/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   05/23/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   05/23/2017   Conditional Approval   LESLIE TRUJILLO
  Reinforced Concrete Frame   05/23/2017   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   05/24/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   05/24/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   05/24/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   05/24/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Shotcrete   05/24/2017   Conditional Approval   LESLIE TRUJILLO
  Reinforced Concrete Frame   05/24/2017   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   05/25/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   05/25/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   05/25/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   05/25/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Shotcrete   05/25/2017   Conditional Approval   LESLIE TRUJILLO
  Footing/Foundation/Slab   05/25/2017   Partial Approval   LESLIE TRUJILLO
  METHANE-Barrier   05/25/2017   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   05/26/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   05/26/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   05/26/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   05/26/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Shotcrete   05/26/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   05/30/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   05/30/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   05/30/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Shotcrete   05/30/2017   Conditional Approval   LESLIE TRUJILLO
  Reinforced Concrete Frame   05/30/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   05/31/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   05/31/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   05/31/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   05/31/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Shotcrete   05/31/2017   Conditional Approval   LESLIE TRUJILLO
  Footing/Foundation/Slab   05/31/2017   Not Ready for Inspection   JAMES POWERS
  METHANE-Barrier   05/31/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   06/01/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   06/01/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   06/01/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   06/01/2017   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   06/01/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   06/02/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   06/02/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   06/02/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   06/02/2017   Partial Approval   JAMES POWERS
  METHANE-Barrier   06/02/2017   Not Ready for Inspection   JAMES POWERS
  Reinforced Concrete Frame   06/02/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   06/05/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   06/05/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   06/05/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   06/05/2017   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   06/05/2017   Not Ready for Inspection   JAMES POWERS
  Deputy Drilled-In Anchors   06/06/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   06/06/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   06/06/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   06/06/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   06/06/2017   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   06/06/2017   Partial Approval   JAMES POWERS
  Reinforced Masonry Frame   06/06/2017   Not Ready for Inspection   JAMES POWERS
  Deputy Drilled-In Anchors   06/07/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   06/07/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   06/07/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   06/07/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   06/07/2017   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   06/07/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   06/08/2017   Conditional Approval   ERNESTO CORRAL
  Deputy Pre-Stress Concrete   06/08/2017   Conditional Approval   ERNESTO CORRAL
  Deputy Reinf. Concrete   06/08/2017   Conditional Approval   ERNESTO CORRAL
  Deputy Reinf. Masonry   06/08/2017   Conditional Approval   ERNESTO CORRAL
  Deputy Steel/Welding   06/08/2017   Conditional Approval   ERNESTO CORRAL
  Footing/Foundation/Slab   06/08/2017   Partial Approval   NICK DANERI
  METHANE-Barrier   06/08/2017   Partial Inspection   NICK DANERI
  Deputy Drilled-In Anchors   06/09/2017   Conditional Approval   NICK DANERI
  Deputy Pre-Stress Concrete   06/09/2017   Conditional Approval   NICK DANERI
  Deputy Reinf. Concrete   06/09/2017   Conditional Approval   NICK DANERI
  Deputy Reinf. Masonry   06/09/2017   Conditional Approval   NICK DANERI
  Deputy Steel/Welding   06/09/2017   Conditional Approval   NICK DANERI
  Floor/Roof Diaphrgm/Shear Wall   06/09/2017   Partial Approval   NICK DANERI
  Masonry Wall/Backfill   06/09/2017   Partial Approval   NICK DANERI
  Deputy Drilled-In Anchors   06/12/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   06/12/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   06/12/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   06/12/2017   Partial Approval   JAMES POWERS
  METHANE-Barrier   06/12/2017   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   06/12/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   06/13/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   06/13/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   06/13/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   06/13/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   06/14/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   06/14/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   06/14/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   06/14/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   06/14/2017   Conditional Approval   LESLIE TRUJILLO
  Reinforced Concrete Frame   06/14/2017   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   06/15/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   06/15/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   06/15/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   06/15/2017   Partial Approval   JAMES POWERS
  METHANE-Barrier   06/15/2017   Not Ready for Inspection   JAMES POWERS
  Reinforced Concrete Frame   06/15/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   06/16/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   06/16/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   06/16/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   06/16/2017   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   06/16/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   06/19/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   06/19/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   06/19/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   06/19/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   06/19/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   06/20/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   06/20/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   06/20/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   06/20/2017   Partial Approval   JAMES POWERS
  Footing/Foundation/Slab   06/20/2017   Not Ready for Inspection   JAMES POWERS
  METHANE-Barrier   06/20/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   06/21/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   06/21/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   06/21/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   06/21/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   06/22/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   06/22/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   06/22/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   06/22/2017   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   06/22/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   06/23/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   06/23/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   06/23/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   06/23/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   06/23/2017   Partial Approval   JAMES POWERS
  METHANE-Barrier   06/23/2017   Not Ready for Inspection   JAMES POWERS
  Reinforced Concrete Frame   06/23/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   06/26/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   06/26/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   06/26/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   06/26/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   06/26/2017   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   06/26/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   06/27/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   06/27/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   06/27/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   06/27/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   06/27/2017   Partial Approval   JAMES POWERS
  METHANE-Barrier   06/27/2017   Not Ready for Inspection   JAMES POWERS
  Reinforced Concrete Frame   06/27/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   06/28/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   06/28/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   06/28/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   06/28/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   06/28/2017   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   06/28/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   06/29/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   06/29/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   06/29/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   06/29/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   06/29/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   06/30/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   06/30/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   06/30/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   06/30/2017   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   06/30/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   07/03/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   07/03/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   07/03/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   07/03/2017   Partial Approval   JAMES POWERS
  Reinforced Masonry Frame   07/03/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   07/05/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   07/05/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   07/05/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   07/05/2017   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   07/05/2017   Not Ready for Inspection   JAMES POWERS
  Deputy Drilled-In Anchors   07/06/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   07/06/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   07/06/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   07/06/2017   Partial Approval   JAMES POWERS
  Footing/Foundation/Slab   07/06/2017   Partial Approval   JAMES POWERS
  METHANE-Barrier   07/06/2017   Not Ready for Inspection   JAMES POWERS
  Deputy Drilled-In Anchors   07/07/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   07/07/2017   Order to Comply Issued   JAMES POWERS
  Deputy Pre-Stress Concrete   07/07/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   07/07/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   07/07/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   07/07/2017   Partial Approval   JAMES POWERS
  Green Building Rough   07/08/2017   No Result Entered   LESLIE TRUJILLO
  Reinforced Concrete Frame   07/08/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   07/10/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   07/10/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   07/10/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   07/10/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   07/10/2017   Partial Approval   JAMES POWERS
  Footing/Foundation/Slab   07/10/2017   Partial Approval   JAMES POWERS
  METHANE-Barrier   07/10/2017   Not Ready for Inspection   JAMES POWERS
  Deputy Drilled-In Anchors   07/11/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   07/11/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   07/11/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   07/11/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   07/11/2017   Conditional Approval   LESLIE TRUJILLO
  Reinforced Concrete Frame   07/11/2017   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   07/12/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   07/12/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   07/12/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   07/12/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   07/12/2017   Partial Approval   JAMES POWERS
  Footing/Foundation/Slab   07/12/2017   Partial Approval   JAMES POWERS
  METHANE-Barrier   07/12/2017   Not Ready for Inspection   JAMES POWERS
  Deputy Drilled-In Anchors   07/13/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   07/13/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   07/13/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   07/13/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   07/13/2017   Conditional Approval   LESLIE TRUJILLO
  Reinforced Concrete Frame   07/13/2017   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   07/14/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   07/14/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   07/14/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   07/14/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   07/14/2017   Conditional Approval   LESLIE TRUJILLO
  Reinforced Masonry Frame   07/14/2017   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   07/17/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   07/17/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   07/17/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   07/17/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   07/17/2017   Conditional Approval   LESLIE TRUJILLO
  Footing/Foundation/Slab   07/17/2017   Not Ready for Inspection   LESLIE TRUJILLO
  METHANE-Barrier   07/17/2017   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   07/18/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   07/18/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   07/18/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   07/18/2017   Conditional Approval   LESLIE TRUJILLO
  Light Gage Steel Frame   07/18/2017   Partial Inspection   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   07/19/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   07/19/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   07/19/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   07/19/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   07/19/2017   Conditional Approval   LESLIE TRUJILLO
  Green Building Rough   07/19/2017   Partial Inspection   RICHARD DOCKUS
  Deputy Drilled-In Anchors   07/20/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   07/20/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   07/20/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   07/20/2017   Conditional Approval   LESLIE TRUJILLO
  Reinforced Masonry Frame   07/20/2017   Not Ready for Inspection   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   07/21/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   07/21/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   07/21/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   07/21/2017   Conditional Approval   LESLIE TRUJILLO
  Reinforced Concrete Frame   07/21/2017   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   07/24/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   07/24/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   07/24/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   07/24/2017   Conditional Approval   LESLIE TRUJILLO
  Footing/Foundation/Slab   07/24/2017   Partial Approval   LESLIE TRUJILLO
  METHANE-Barrier   07/24/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   07/25/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   07/25/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   07/25/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   07/25/2017   Conditional Approval   LESLIE TRUJILLO
  Reinforced Concrete Frame   07/25/2017   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   07/26/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   07/26/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   07/26/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   07/26/2017   Conditional Approval   LESLIE TRUJILLO
  Footing/Foundation/Slab   07/26/2017   Partial Approval   LESLIE TRUJILLO
  METHANE-Barrier   07/26/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   07/27/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   07/27/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   07/27/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   07/27/2017   Conditional Approval   LESLIE TRUJILLO
  Reinforced Masonry Frame   07/27/2017   Not Ready for Inspection   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   07/28/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   07/28/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   07/28/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   07/28/2017   Conditional Approval   LESLIE TRUJILLO
  Reinforced Concrete Frame   07/28/2017   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   07/31/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   07/31/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   07/31/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   07/31/2017   Conditional Approval   LESLIE TRUJILLO
  METHANE-Barrier   07/31/2017   Conditional Approval   LESLIE TRUJILLO
  Reinforced Masonry Frame   07/31/2017   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   08/01/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   08/01/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   08/01/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   08/01/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   08/02/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   08/02/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   08/02/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   08/02/2017   Conditional Approval   LESLIE TRUJILLO
  Reinforced Concrete Frame   08/02/2017   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   08/03/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   08/03/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   08/03/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   08/03/2017   Conditional Approval   LESLIE TRUJILLO
  Drywall Nailing   08/03/2017   Partial Approval   LESLIE TRUJILLO
  Footing/Foundation/Slab   08/03/2017   Partial Approval   LESLIE TRUJILLO
  Light Gage Steel Frame   08/03/2017   Partial Approval   LESLIE TRUJILLO
  METHANE-Barrier   08/03/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   08/04/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   08/04/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   08/04/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   08/04/2017   Conditional Approval   LESLIE TRUJILLO
  Reinforced Concrete Frame   08/04/2017   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   08/07/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   08/07/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   08/07/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   08/07/2017   Conditional Approval   LESLIE TRUJILLO
  Reinforced Concrete Frame   08/07/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   08/08/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   08/08/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   08/08/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   08/08/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   08/08/2017   Conditional Approval   LESLIE TRUJILLO
  Footing/Foundation/Slab   08/08/2017   Not Ready for Inspection   LESLIE TRUJILLO
  METHANE-Barrier   08/08/2017   Conditional Approval   LESLIE TRUJILLO
  Pre-Inspection   08/08/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   08/09/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   08/09/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   08/09/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   08/09/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   08/09/2017   Conditional Approval   LESLIE TRUJILLO
  Insulation   08/09/2017   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   08/10/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   08/10/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   08/10/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   08/10/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   08/10/2017   Conditional Approval   LESLIE TRUJILLO
  Drywall Nailing   08/10/2017   Partial Approval   LESLIE TRUJILLO
  Light Gage Steel Frame   08/10/2017   Partial Approval   LESLIE TRUJILLO
  Structural Steel Frame   08/10/2017   Not Ready for Inspection   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   08/11/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   08/11/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   08/11/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   08/11/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   08/11/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   08/14/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   08/14/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   08/14/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   08/14/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   08/14/2017   Partial Approval   JAMES POWERS
  Footing/Foundation/Slab   08/14/2017   Not Ready for Inspection   JAMES POWERS
  METHANE-Barrier   08/14/2017   Partial Inspection   JAMES POWERS
  Deputy Drilled-In Anchors   08/15/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   08/15/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   08/15/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   08/15/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   08/16/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   08/16/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   08/16/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   08/16/2017   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   08/16/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   08/17/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   08/17/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   08/17/2017   Partial Approval   JAMES POWERS
  Drywall Nailing   08/17/2017   Partial Approval   JAMES POWERS
  Light Gage Steel Frame   08/17/2017   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   08/17/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   08/18/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   08/18/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   08/18/2017   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   08/18/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   08/21/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   08/21/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   08/21/2017   Partial Approval   JAMES POWERS
  METHANE-Barrier   08/21/2017   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   08/21/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   08/22/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   08/22/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   08/22/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   08/22/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   08/23/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   08/23/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   08/23/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   08/23/2017   Partial Approval   JAMES POWERS
  Drywall Nailing   08/23/2017   Not Ready for Inspection   JAMES POWERS
  Light Gage Steel Frame   08/23/2017   Not Ready for Inspection   JAMES POWERS
  Reinforced Concrete Frame   08/23/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   08/24/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   08/24/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   08/24/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   08/24/2017   Partial Approval   JAMES POWERS
  Drywall Nailing   08/24/2017   Partial Approval   JAMES POWERS
  Footing/Foundation/Slab   08/24/2017   Partial Approval   JAMES POWERS
  Light Gage Steel Frame   08/24/2017   Not Ready for Inspection   JAMES POWERS
  METHANE-Barrier   08/24/2017   Not Ready for Inspection   JAMES POWERS
  Deputy Drilled-In Anchors   08/25/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   08/25/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   08/25/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   08/25/2017   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   08/25/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   08/28/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   08/28/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   08/28/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   08/28/2017   Conditional Approval   LESLIE TRUJILLO
  Footing/Foundation/Slab   08/28/2017   Partial Approval   LESLIE TRUJILLO
  METHANE-Barrier   08/28/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   08/29/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   08/29/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   08/29/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   08/29/2017   Conditional Approval   LESLIE TRUJILLO
  Light Gage Steel Frame   08/29/2017   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   08/30/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   08/30/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   08/30/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   08/30/2017   Conditional Approval   LESLIE TRUJILLO
  Reinforced Concrete Frame   08/30/2017   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   08/31/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   08/31/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   08/31/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   08/31/2017   Conditional Approval   LESLIE TRUJILLO
  Insulation   08/31/2017   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   09/01/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   09/01/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   09/01/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   09/01/2017   Conditional Approval   LESLIE TRUJILLO
  Footing/Foundation/Slab   09/01/2017   Partial Approval   LESLIE TRUJILLO
  METHANE-Barrier   09/01/2017   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   09/05/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   09/05/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   09/05/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   09/05/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   09/06/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   09/06/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   09/06/2017   Partial Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   09/06/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   09/06/2017   Conditional Approval   LESLIE TRUJILLO
  Light Gage Steel Frame   09/06/2017   Partial Approval   LESLIE TRUJILLO
  Reinforced Concrete Frame   09/06/2017   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   09/07/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   09/07/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   09/07/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   09/07/2017   Partial Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   09/07/2017   Conditional Approval   LESLIE TRUJILLO
  Reinforced Masonry Frame   09/07/2017   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   09/08/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   09/08/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   09/08/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   09/08/2017   Conditional Approval   LESLIE TRUJILLO
  Footing/Foundation/Slab   09/08/2017   Not Ready for Inspection   LESLIE TRUJILLO
  METHANE-Barrier   09/08/2017   Partial Approval   LESLIE TRUJILLO
  Pre-Inspection   09/08/2017   Corrections Issued   LESLIE TRUJILLO
  Reinforced Concrete Frame   09/09/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   09/11/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   09/11/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   09/11/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   09/11/2017   Conditional Approval   LESLIE TRUJILLO
  Reinforced Masonry Frame   09/11/2017   Not Ready for Inspection   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   09/12/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   09/12/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   09/12/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   09/12/2017   Conditional Approval   LESLIE TRUJILLO
  Drywall Nailing   09/12/2017   Partial Approval   LESLIE TRUJILLO
  Light Gage Steel Frame   09/12/2017   Partial Approval   LESLIE TRUJILLO
  Reinforced Concrete Frame   09/12/2017   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   09/13/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   09/13/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   09/13/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   09/13/2017   Conditional Approval   LESLIE TRUJILLO
  Footing/Foundation/Slab   09/13/2017   Partial Approval   LESLIE TRUJILLO
  METHANE-Barrier   09/13/2017   Partial Inspection   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   09/14/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   09/14/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   09/14/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   09/14/2017   Conditional Approval   LESLIE TRUJILLO
  Reinforced Masonry Frame   09/14/2017   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   09/15/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   09/15/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   09/15/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   09/15/2017   Partial Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   09/15/2017   Conditional Approval   LESLIE TRUJILLO
  Light Gage Steel Frame   09/15/2017   Partial Approval   LESLIE TRUJILLO
  Reinforced Concrete Frame   09/15/2017   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   09/18/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   09/18/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   09/18/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   09/18/2017   Conditional Approval   LESLIE TRUJILLO
  Footing/Foundation/Slab   09/18/2017   Partial Approval   LESLIE TRUJILLO
  METHANE-Barrier   09/18/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   09/19/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   09/19/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   09/19/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   09/19/2017   Conditional Approval   LESLIE TRUJILLO
  Reinforced Concrete Frame   09/19/2017   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   09/20/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   09/20/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   09/20/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   09/20/2017   Conditional Approval   LESLIE TRUJILLO
  Drywall Nailing   09/20/2017   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   09/21/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   09/21/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   09/21/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   09/21/2017   Conditional Approval   LESLIE TRUJILLO
  Footing/Foundation/Slab   09/21/2017   Partial Approval   LESLIE TRUJILLO
  METHANE-Barrier   09/21/2017   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   09/22/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   09/22/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   09/22/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   09/22/2017   Conditional Approval   LESLIE TRUJILLO
  Reinforced Concrete Frame   09/22/2017   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   09/25/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   09/25/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   09/25/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   09/26/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   09/26/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   09/26/2017   Conditional Approval   LESLIE TRUJILLO
  Reinforced Masonry Frame   09/26/2017   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   09/27/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   09/27/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   09/27/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   09/27/2017   Conditional Approval   LESLIE TRUJILLO
  Drywall Nailing   09/27/2017   Partial Approval   LESLIE TRUJILLO
  Light Gage Steel Frame   09/27/2017   Partial Approval   LESLIE TRUJILLO
  Reinforced Concrete Frame   09/27/2017   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   09/28/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   09/28/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   09/28/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   09/28/2017   Conditional Approval   LESLIE TRUJILLO
  Footing/Foundation/Slab   09/28/2017   Partial Approval   LESLIE TRUJILLO
  METHANE-Barrier   09/28/2017   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   09/29/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   09/29/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   09/29/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   09/29/2017   Conditional Approval   LESLIE TRUJILLO
  Reinforced Masonry Frame   09/29/2017   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   10/02/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   10/02/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   10/02/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   10/02/2017   Conditional Approval   LESLIE TRUJILLO
  Footing/Foundation/Slab   10/02/2017   Partial Approval   LESLIE TRUJILLO
  METHANE-Barrier   10/02/2017   Approved   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   10/03/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   10/03/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   10/03/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   10/03/2017   Conditional Approval   LESLIE TRUJILLO
  Footing/Foundation/Slab   10/03/2017   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   10/04/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   10/04/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   10/04/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   10/05/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   10/05/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   10/05/2017   Conditional Approval   LESLIE TRUJILLO
  Reinforced Concrete Frame   10/05/2017   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   10/06/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   10/06/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   10/06/2017   Conditional Approval   LESLIE TRUJILLO
  Footing/Foundation/Slab   10/06/2017   Partial Approval   LESLIE TRUJILLO
  Insulation   10/06/2017   Partial Approval   LESLIE TRUJILLO
  Light Gage Steel Frame   10/06/2017   Partial Approval   LESLIE TRUJILLO
  Pre-Inspection   10/09/2017   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   10/10/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   10/10/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   10/10/2017   Conditional Approval   LESLIE TRUJILLO
  Reinforced Concrete Frame   10/10/2017   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   10/11/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   10/11/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   10/11/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   10/11/2017   Conditional Approval   LESLIE TRUJILLO
  Drywall Nailing   10/11/2017   Partial Approval   LESLIE TRUJILLO
  Pre-Inspection   10/11/2017   Off-Hour Fees Due   
  Deputy Drilled-In Anchors   10/12/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   10/12/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   10/12/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   10/12/2017   Conditional Approval   LESLIE TRUJILLO
  Footing/Foundation/Slab   10/12/2017   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   10/13/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   10/13/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   10/13/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   10/13/2017   Conditional Approval   LESLIE TRUJILLO
  Reinforced Concrete Frame   10/13/2017   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   10/16/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   10/16/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   10/16/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   10/16/2017   Conditional Approval   LESLIE TRUJILLO
  Light Gage Steel Frame   10/16/2017   Partial Approval   LESLIE TRUJILLO
  Reinforced Masonry Frame   10/16/2017   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   10/17/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   10/17/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   10/17/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   10/17/2017   Conditional Approval   LESLIE TRUJILLO
  Reinforced Concrete Frame   10/17/2017   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   10/18/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   10/18/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   10/18/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   10/18/2017   Conditional Approval   LESLIE TRUJILLO
  Light Gage Steel Frame   10/18/2017   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   10/19/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   10/19/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   10/19/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   10/19/2017   Conditional Approval   LESLIE TRUJILLO
  Drywall Nailing   10/19/2017   Partial Approval   LESLIE TRUJILLO
  Footing/Foundation/Slab   10/19/2017   Partial Approval   LESLIE TRUJILLO
  Light Gage Steel Frame   10/19/2017   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   10/20/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   10/20/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   10/20/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   10/20/2017   Conditional Approval   LESLIE TRUJILLO
  Reinforced Masonry Frame   10/20/2017   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   10/23/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   10/23/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   10/23/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   10/23/2017   Partial Approval   JAMES POWERS
  Light Gage Steel Frame   10/23/2017   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   10/23/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   10/24/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   10/24/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   10/24/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   10/24/2017   Conditional Approval   LESLIE TRUJILLO
  Light Gage Steel Frame   10/24/2017   Partial Inspection   LESLIE TRUJILLO
  Reinforced Masonry Frame   10/24/2017   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   10/25/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   10/25/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   10/25/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   10/25/2017   Conditional Approval   LESLIE TRUJILLO
  Reinforced Concrete Frame   10/25/2017   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   10/26/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   10/26/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   10/26/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   10/26/2017   Conditional Approval   LESLIE TRUJILLO
  Footing/Foundation/Slab   10/26/2017   Partial Approval   LESLIE TRUJILLO
  Light Gage Steel Frame   10/26/2017   Partial Inspection   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   10/27/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   10/27/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   10/27/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   10/27/2017   Conditional Approval   LESLIE TRUJILLO
  Drywall Nailing   10/27/2017   Partial Approval   LESLIE TRUJILLO
  Light Gage Steel Frame   10/27/2017   Partial Approval   LESLIE TRUJILLO
  Reinforced Masonry Frame   10/27/2017   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   10/30/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   10/30/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   10/30/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   10/30/2017   Conditional Approval   LESLIE TRUJILLO
  Light Gage Steel Frame   10/30/2017   Partial Inspection   LESLIE TRUJILLO
  Pre-Inspection   10/30/2017   Partial Inspection   LESLIE TRUJILLO
  Reinforced Concrete Frame   10/30/2017   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   10/31/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Other (see comments)   10/31/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   10/31/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   10/31/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   10/31/2017   Conditional Approval   LESLIE TRUJILLO
  Reinforced Masonry Frame   10/31/2017   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   11/01/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Other (see comments)   11/01/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   11/01/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   11/01/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   11/01/2017   Conditional Approval   LESLIE TRUJILLO
  Light Gage Steel Frame   11/01/2017   Partial Inspection   LESLIE TRUJILLO
  Reinforced Concrete Frame   11/01/2017   Partial Inspection   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   11/02/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Other (see comments)   11/02/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   11/02/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   11/02/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   11/02/2017   Conditional Approval   LESLIE TRUJILLO
  Footing/Foundation/Slab   11/02/2017   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   11/03/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Other (see comments)   11/03/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   11/03/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   11/03/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   11/03/2017   Conditional Approval   LESLIE TRUJILLO
  Reinforced Masonry Frame   11/03/2017   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   11/06/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Other (see comments)   11/06/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   11/06/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   11/06/2017   Conditional Approval   LESLIE TRUJILLO
  Light Gage Steel Frame   11/06/2017   Partial Approval   LESLIE TRUJILLO
  Reinforced Masonry Frame   11/06/2017   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   11/07/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   11/07/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   11/07/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   11/07/2017   Conditional Approval   LESLIE TRUJILLO
  Footing/Foundation/Slab   11/07/2017   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   11/08/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   11/08/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   11/08/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   11/08/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   11/09/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   11/09/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   11/09/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   11/09/2017   Partial Approval   JAMES POWERS
  Light Gage Steel Frame   11/09/2017   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   11/09/2017   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   11/10/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   11/13/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   11/13/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   11/13/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   11/13/2017   Partial Approval   JAMES POWERS
  Footing/Foundation/Slab   11/13/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   11/14/2017   Partial Approval   JAMES POWERS
  Deputy Other (see comments)   11/14/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   11/14/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   11/14/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   11/14/2017   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   11/14/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   11/15/2017   Partial Approval   JAMES POWERS
  Deputy Other (see comments)   11/15/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   11/15/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   11/15/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   11/15/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   11/16/2017   Partial Approval   JAMES POWERS
  Deputy Other (see comments)   11/16/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   11/16/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   11/16/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   11/16/2017   Partial Approval   JAMES POWERS
  Drywall Nailing   11/16/2017   Partial Approval   JAMES POWERS
  Light Gage Steel Frame   11/16/2017   Not Ready for Inspection   JAMES POWERS
  Reinforced Concrete Frame   11/16/2017   Partial Inspection   JAMES POWERS
  Deputy Drilled-In Anchors   11/17/2017   Partial Approval   JAMES POWERS
  Deputy Other (see comments)   11/17/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   11/17/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   11/17/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   11/17/2017   Partial Approval   JAMES POWERS
  Footing/Foundation/Slab   11/17/2017   Partial Approval   JAMES POWERS
  Light Gage Steel Frame   11/17/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   11/20/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Other (see comments)   11/20/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   11/20/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   11/20/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   11/20/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   11/21/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   11/21/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   11/21/2017   Conditional Approval   LESLIE TRUJILLO
  Reinforced Concrete Frame   11/21/2017   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   11/22/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   11/22/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   11/22/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   11/22/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   11/27/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   11/27/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   11/27/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   11/27/2017   Conditional Approval   LESLIE TRUJILLO
  Footing/Foundation/Slab   11/27/2017   Partial Approval   LESLIE TRUJILLO
  Light Gage Steel Frame   11/27/2017   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   11/28/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   11/28/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   11/28/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   11/28/2017   Conditional Approval   LESLIE TRUJILLO
  Reinforced Masonry Frame   11/28/2017   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   11/29/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   11/29/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   11/29/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   11/29/2017   Conditional Approval   LESLIE TRUJILLO
  Reinforced Concrete Frame   11/29/2017   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   11/30/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   11/30/2017   Partial Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   11/30/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   11/30/2017   Partial Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   11/30/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   11/30/2017   Partial Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   11/30/2017   Conditional Approval   LESLIE TRUJILLO
  Drywall Nailing   11/30/2017   Conditional Approval   LESLIE TRUJILLO
  Footing/Foundation/Slab   11/30/2017   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   12/01/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   12/01/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   12/01/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   12/01/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   12/04/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   12/04/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   12/04/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   12/04/2017   Conditional Approval   LESLIE TRUJILLO
  Reinforced Masonry Frame   12/04/2017   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   12/05/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Other (see comments)   12/05/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   12/05/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   12/05/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   12/05/2017   Conditional Approval   LESLIE TRUJILLO
  Drywall Nailing   12/05/2017   Partial Approval   LESLIE TRUJILLO
  Footing/Foundation/Slab   12/05/2017   Partial Approval   LESLIE TRUJILLO
  Wall Anchors   12/05/2017   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   12/06/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Other (see comments)   12/06/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   12/06/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   12/06/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   12/06/2017   Conditional Approval   LESLIE TRUJILLO
  Light Gage Steel Frame   12/06/2017   Partial Inspection   LESLIE TRUJILLO
  Reinforced Concrete Frame   12/06/2017   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   12/07/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Other (see comments)   12/07/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   12/07/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   12/07/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   12/07/2017   Conditional Approval   LESLIE TRUJILLO
  Drywall Nailing   12/07/2017   Partial Approval   LESLIE TRUJILLO
  Light Gage Steel Frame   12/07/2017   Partial Approval   LESLIE TRUJILLO
  Reinforced Masonry Frame   12/07/2017   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   12/08/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Other (see comments)   12/08/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   12/08/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   12/08/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   12/08/2017   Conditional Approval   LESLIE TRUJILLO
  Footing/Foundation/Slab   12/08/2017   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   12/11/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Other (see comments)   12/11/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   12/11/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   12/11/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   12/11/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   12/12/2017   Corrections Issued   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   12/12/2017   Corrections Issued   LESLIE TRUJILLO
  Deputy Reinf. Concrete   12/12/2017   Corrections Issued   LESLIE TRUJILLO
  Deputy Reinf. Masonry   12/12/2017   Corrections Issued   LESLIE TRUJILLO
  Footing/Foundation/Slab   12/12/2017   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   12/13/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   12/13/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   12/13/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   12/13/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   12/14/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   12/14/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   12/14/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   12/14/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   12/14/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   12/15/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   12/15/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   12/15/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   12/15/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   12/15/2017   Conditional Approval   LESLIE TRUJILLO
  Drywall Nailing   12/15/2017   Partial Approval   LESLIE TRUJILLO
  Light Gage Steel Frame   12/15/2017   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   12/18/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   12/18/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   12/18/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   12/18/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   12/18/2017   Conditional Approval   LESLIE TRUJILLO
  Reinforced Concrete Frame   12/18/2017   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   12/19/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   12/19/2017   Corrections Issued   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   12/19/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   12/19/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   12/19/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   12/19/2017   Conditional Approval   LESLIE TRUJILLO
  Reinforced Masonry Frame   12/19/2017   Partial Inspection   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   12/20/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   12/20/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   12/20/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   12/20/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   12/20/2017   Conditional Approval   LESLIE TRUJILLO
  Footing/Foundation/Slab   12/20/2017   Partial Approval   LESLIE TRUJILLO
  Light Gage Steel Frame   12/20/2017   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   12/21/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   12/21/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   12/21/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   12/21/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   12/21/2017   Conditional Approval   LESLIE TRUJILLO
  Drywall Nailing   12/21/2017   Partial Approval   LESLIE TRUJILLO
  Insulation   12/21/2017   Partial Approval   LESLIE TRUJILLO
  Wall Anchors   12/21/2017   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   12/22/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   12/22/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   12/22/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   12/22/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   12/22/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   12/26/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   12/26/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   12/26/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   12/26/2017   Partial Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   12/26/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   12/26/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   12/27/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   12/27/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   12/27/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   12/27/2017   Conditional Approval   LESLIE TRUJILLO
  Footing/Foundation/Slab   12/27/2017   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   12/28/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   12/28/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   12/28/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   12/28/2017   Partial Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   12/28/2017   Conditional Approval   LESLIE TRUJILLO
  Reinforced Masonry Frame   12/28/2017   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   12/29/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   12/29/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   12/29/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   12/29/2017   Conditional Approval   LESLIE TRUJILLO
  Reinforced Concrete Frame   12/29/2017   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   01/02/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   01/02/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   01/02/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   01/02/2018   Conditional Approval   LESLIE TRUJILLO
  Footing/Foundation/Slab   01/02/2018   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   01/03/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   01/03/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   01/03/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   01/03/2018   Conditional Approval   LESLIE TRUJILLO
  Reinforced Concrete Frame   01/03/2018   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   01/04/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   01/04/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   01/04/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   01/04/2018   Conditional Approval   LESLIE TRUJILLO
  Reinforced Masonry Frame   01/04/2018   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   01/05/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   01/05/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   01/05/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   01/05/2018   Conditional Approval   LESLIE TRUJILLO
  Reinforced Concrete Frame   01/05/2018   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   01/08/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   01/08/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   01/08/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   01/08/2018   Partial Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   01/08/2018   Conditional Approval   LESLIE TRUJILLO
  Footing/Foundation/Slab   01/08/2018   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   01/09/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   01/09/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   01/09/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   01/09/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   01/09/2018   Conditional Approval   LESLIE TRUJILLO
  Reinforced Concrete Frame   01/09/2018   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   01/10/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   01/10/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   01/10/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   01/10/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   01/10/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   01/11/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   01/11/2018   Order to Comply Issued   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   01/11/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   01/11/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   01/11/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   01/11/2018   Conditional Approval   LESLIE TRUJILLO
  Reinforced Masonry Frame   01/11/2018   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   01/12/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   01/12/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   01/12/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   01/12/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   01/12/2018   Conditional Approval   LESLIE TRUJILLO
  Reinforced Concrete Frame   01/12/2018   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   01/16/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   01/16/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   01/16/2018   Conditional Approval   LESLIE TRUJILLO
  Light Gage Steel Frame   01/16/2018   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   01/17/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   01/17/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   01/17/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   01/17/2018   Conditional Approval   LESLIE TRUJILLO
  Footing/Foundation/Slab   01/17/2018   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   01/18/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   01/18/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   01/18/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   01/18/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   01/19/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   01/19/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   01/19/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   01/19/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   01/22/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   01/22/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   01/22/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   01/22/2018   Conditional Approval   LESLIE TRUJILLO
  Reinforced Concrete Frame   01/22/2018   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   01/23/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   01/23/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   01/23/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   01/23/2018   Conditional Approval   LESLIE TRUJILLO
  Footing/Foundation/Slab   01/23/2018   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   01/24/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   01/24/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   01/24/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   01/24/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   01/24/2018   Conditional Approval   LESLIE TRUJILLO
  Insulation   01/24/2018   Partial Inspection   LESLIE TRUJILLO
  Reinforced Masonry Frame   01/24/2018   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   01/25/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   01/25/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   01/25/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   01/25/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   01/26/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   01/26/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   01/26/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   01/26/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   01/29/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   01/29/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   01/29/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   01/29/2018   Conditional Approval   LESLIE TRUJILLO
  Reinforced Concrete Frame   01/29/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   01/30/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   01/30/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   01/30/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   01/30/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   01/30/2018   Conditional Approval   LESLIE TRUJILLO
  Footing/Foundation/Slab   01/30/2018   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   01/31/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   01/31/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   01/31/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   01/31/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   01/31/2018   Conditional Approval   LESLIE TRUJILLO
  Reinforced Masonry Frame   01/31/2018   Partial Inspection   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   02/01/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   02/01/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   02/01/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   02/01/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   02/01/2018   Conditional Approval   LESLIE TRUJILLO
  Reinforced Concrete Frame   02/01/2018   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   02/02/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   02/02/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   02/02/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   02/02/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   02/02/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   02/05/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Other (see comments)   02/05/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   02/05/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   02/05/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   02/05/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   02/05/2018   Conditional Approval   LESLIE TRUJILLO
  Footing/Foundation/Slab   02/05/2018   Partial Inspection   LESLIE TRUJILLO
  Light Gage Steel Frame   02/05/2018   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   02/06/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Other (see comments)   02/06/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   02/06/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   02/06/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   02/06/2018   Conditional Approval   LESLIE TRUJILLO
  Reinforced Masonry Frame   02/06/2018   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   02/07/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Other (see comments)   02/07/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   02/07/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   02/07/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   02/07/2018   Partial Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   02/07/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   02/07/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   02/08/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Other (see comments)   02/08/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   02/08/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   02/08/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   02/08/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   02/08/2018   Conditional Approval   LESLIE TRUJILLO
  Reinforced Concrete Frame   02/08/2018   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   02/09/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Other (see comments)   02/09/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   02/09/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   02/09/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   02/09/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   02/09/2018   Conditional Approval   LESLIE TRUJILLO
  Footing/Foundation/Slab   02/09/2018   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   02/12/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   02/12/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   02/12/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   02/12/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   02/13/2018   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   02/13/2018   Conditional Approval   ERNESTO CORRAL
  Deputy Reinf. Concrete   02/13/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   02/13/2018   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   02/13/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   02/14/2018   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   02/14/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   02/14/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   02/14/2018   Partial Approval   JAMES POWERS
  Insulation   02/14/2018   Partial Approval   JAMES POWERS
  Light Gage Steel Frame   02/14/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   02/15/2018   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   02/15/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   02/15/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   02/16/2018   Conditional Approval   ERNESTO CORRAL
  Deputy Pre-Stress Concrete   02/16/2018   Conditional Approval   ERNESTO CORRAL
  Deputy Reinf. Concrete   02/16/2018   Conditional Approval   ERNESTO CORRAL
  Footing/Foundation/Slab   02/16/2018   Partial Inspection   ERNESTO CORRAL
  Deputy Drilled-In Anchors   02/20/2018   Conditional Approval   ERNESTO CORRAL
  Deputy Pre-Stress Concrete   02/20/2018   Conditional Approval   ERNESTO CORRAL
  Deputy Reinf. Concrete   02/20/2018   Conditional Approval   ERNESTO CORRAL
  Deputy Drilled-In Anchors   02/21/2018   Conditional Approval   ERNESTO CORRAL
  Deputy Pre-Stress Concrete   02/21/2018   Conditional Approval   ERNESTO CORRAL
  Deputy Reinf. Concrete   02/21/2018   Conditional Approval   ERNESTO CORRAL
  Reinforced Concrete Frame   02/21/2018   Partial Inspection   ERNESTO CORRAL
  Deputy Drilled-In Anchors   02/22/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   02/22/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   02/22/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   02/23/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   02/23/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   02/23/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   02/23/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   02/26/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   02/26/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   02/26/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   02/26/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   02/26/2018   Conditional Approval   LESLIE TRUJILLO
  Reinforced Concrete Frame   02/26/2018   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   02/27/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   02/27/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   02/27/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   02/27/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   02/27/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   02/28/2018   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   02/28/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   02/28/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   02/28/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   02/28/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   03/01/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   03/01/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   03/01/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   03/01/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   03/01/2018   Conditional Approval   LESLIE TRUJILLO
  Footing/Foundation/Slab   03/01/2018   Partial Approval   LESLIE TRUJILLO
  Light Gage Steel Frame   03/01/2018   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   03/02/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   03/02/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   03/02/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   03/02/2018   Conditional Approval   LESLIE TRUJILLO
  Reinforced Concrete Frame   03/02/2018   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   03/05/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   03/05/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   03/05/2018   Conditional Approval   LESLIE TRUJILLO
  Pre-Inspection   03/05/2018   Partial Inspection   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   03/06/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   03/06/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   03/06/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   03/07/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   03/07/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   03/07/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   03/07/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   03/08/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   03/08/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   03/08/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Shotcrete   03/08/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   03/08/2018   Conditional Approval   LESLIE TRUJILLO
  Light Gage Steel Frame   03/08/2018   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   03/09/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   03/09/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   03/09/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Shotcrete   03/09/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   03/09/2018   Conditional Approval   LESLIE TRUJILLO
  Drywall Nailing   03/09/2018   Partial Approval   LESLIE TRUJILLO
  Reinforced Concrete Frame   03/09/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   03/12/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   03/12/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   03/12/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Shotcrete   03/12/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   03/12/2018   Conditional Approval   LESLIE TRUJILLO
  Footing/Foundation/Slab   03/12/2018   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   03/13/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   03/13/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   03/13/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Shotcrete   03/13/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   03/13/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   03/14/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Shotcrete   03/14/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Shotcrete   03/15/2018   Conditional Approval   LESLIE TRUJILLO
  Light Gage Steel Frame   03/15/2018   Partial Approval   LESLIE TRUJILLO
  Deputy Shotcrete   03/16/2018   Conditional Approval   LESLIE TRUJILLO
  Reinforced Concrete Frame   03/16/2018   Partial Approval   LESLIE TRUJILLO
  Deputy Shotcrete   03/19/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   03/20/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Fireproofing   03/20/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   03/20/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   03/20/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   03/20/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   03/21/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Fireproofing   03/21/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   03/21/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   03/21/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   03/21/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   03/22/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Fireproofing   03/22/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   03/22/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   03/22/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   03/22/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   03/23/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Fireproofing   03/23/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   03/23/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   03/23/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   03/23/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   03/27/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Fireproofing   03/27/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   03/27/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   03/27/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   03/27/2018   Conditional Approval   LESLIE TRUJILLO
  Light Gage Steel Frame   03/27/2018   Partial Inspection   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   03/28/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   03/28/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   03/29/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   03/29/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   03/30/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   03/30/2018   Conditional Approval   LESLIE TRUJILLO
  Footing/Foundation/Slab   03/30/2018   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   04/02/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   04/02/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   04/02/2018   Corrections Issued   LESLIE TRUJILLO
  Wood Frame   04/02/2018   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   04/03/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   04/03/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   04/04/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   04/04/2018   Conditional Approval   LESLIE TRUJILLO
  Reinforced Concrete Frame   04/04/2018   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   04/05/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   04/05/2018   Conditional Approval   LESLIE TRUJILLO
  Footing/Foundation/Slab   04/05/2018   Partial Approval   LESLIE TRUJILLO
  Light Gage Steel Frame   04/05/2018   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   04/06/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   04/06/2018   Conditional Approval   LESLIE TRUJILLO
  Reinforced Concrete Frame   04/06/2018   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   04/09/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   04/09/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   04/10/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   04/10/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   04/10/2018   Conditional Approval   LESLIE TRUJILLO
  Light Gage Steel Frame   04/10/2018   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   04/11/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   04/11/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   04/11/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   04/12/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   04/12/2018   Order to Comply Issued   LESLIE TRUJILLO
  Deputy Reinf. Concrete   04/12/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   04/12/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   04/13/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   04/13/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   04/13/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   04/16/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Fireproofing   04/16/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   04/16/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   04/16/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   04/16/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   04/16/2018   Conditional Approval   LESLIE TRUJILLO
  Footing/Foundation/Slab   04/16/2018   Partial Approval   LESLIE TRUJILLO
  Reinforced Concrete Frame   04/16/2018   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   04/17/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Fireproofing   04/17/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   04/17/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   04/17/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   04/17/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Shotcrete   04/17/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   04/17/2018   Conditional Approval   LESLIE TRUJILLO
  Insulation   04/17/2018   Partial Approval   LESLIE TRUJILLO
  Light Gage Steel Frame   04/17/2018   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   04/18/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Fireproofing   04/18/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   04/18/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   04/18/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   04/18/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Shotcrete   04/18/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   04/18/2018   Conditional Approval   LESLIE TRUJILLO
  Light Gage Steel Frame   04/18/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   04/19/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Fireproofing   04/19/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   04/19/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   04/19/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   04/19/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Shotcrete   04/19/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   04/19/2018   Conditional Approval   LESLIE TRUJILLO
  Floor/Roof Diaphrgm/Shear Wall   04/19/2018   Partial Approval   LESLIE TRUJILLO
  Insulation   04/19/2018   Partial Approval   LESLIE TRUJILLO
  Light Gage Steel Frame   04/19/2018   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   04/20/2018   Conditional Approval   ERNESTO CORRAL
  Deputy Fireproofing   04/20/2018   Conditional Approval   ERNESTO CORRAL
  Deputy Pre-Stress Concrete   04/20/2018   Conditional Approval   ERNESTO CORRAL
  Deputy Reinf. Concrete   04/20/2018   Conditional Approval   ERNESTO CORRAL
  Deputy Reinf. Masonry   04/20/2018   Conditional Approval   ERNESTO CORRAL
  Deputy Shotcrete   04/20/2018   Conditional Approval   ERNESTO CORRAL
  Deputy Steel/Welding   04/20/2018   Conditional Approval   ERNESTO CORRAL
  Deputy Drilled-In Anchors   04/23/2018   Conditional Approval   ERNESTO CORRAL
  Deputy Pre-Stress Concrete   04/23/2018   Conditional Approval   ERNESTO CORRAL
  Deputy Reinf. Concrete   04/23/2018   Conditional Approval   ERNESTO CORRAL
  Deputy Reinf. Masonry   04/23/2018   Conditional Approval   ERNESTO CORRAL
  Deputy Shotcrete   04/23/2018   Conditional Approval   ERNESTO CORRAL
  Floor/Roof Diaphrgm/Shear Wall   04/23/2018   Partial Inspection   ERNESTO CORRAL
  Footing/Foundation/Slab   04/23/2018   Partial Inspection   ERNESTO CORRAL
  Light Gage Steel Frame   04/23/2018   Partial Inspection   ERNESTO CORRAL
  Deputy Drilled-In Anchors   04/24/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   04/24/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   04/24/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   04/24/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Shotcrete   04/24/2018   Conditional Approval   LESLIE TRUJILLO
  Light Gage Steel Frame   04/24/2018   Partial Approval   LESLIE TRUJILLO
  Reinforced Concrete Frame   04/24/2018   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   04/25/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   04/25/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   04/25/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   04/25/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Shotcrete   04/25/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   04/26/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   04/26/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   04/26/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   04/26/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Shotcrete   04/26/2018   Conditional Approval   LESLIE TRUJILLO
  Floor/Roof Diaphrgm/Shear Wall   04/26/2018   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   04/27/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   04/27/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   04/27/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   04/27/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Shotcrete   04/27/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   04/30/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   04/30/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   04/30/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   04/30/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Shotcrete   04/30/2018   Conditional Approval   LESLIE TRUJILLO
  Floor/Roof Diaphrgm/Shear Wall   04/30/2018   Partial Approval   LESLIE TRUJILLO
  Insulation   04/30/2018   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   05/01/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   05/01/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   05/02/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Fireproofing   05/02/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   05/02/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   05/02/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   05/02/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Shotcrete   05/02/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   05/02/2018   Conditional Approval   LESLIE TRUJILLO
  Floor/Roof Diaphrgm/Shear Wall   05/02/2018   Partial Approval   LESLIE TRUJILLO
  Insulation   05/02/2018   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   05/03/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Fireproofing   05/03/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   05/03/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   05/03/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   05/03/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Shotcrete   05/03/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   05/03/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   05/04/2018   Conditional Approval   ERNESTO CORRAL
  Deputy Fireproofing   05/04/2018   Conditional Approval   ERNESTO CORRAL
  Deputy Pre-Stress Concrete   05/04/2018   Conditional Approval   ERNESTO CORRAL
  Deputy Reinf. Concrete   05/04/2018   Conditional Approval   ERNESTO CORRAL
  Deputy Reinf. Masonry   05/04/2018   Conditional Approval   ERNESTO CORRAL
  Deputy Shotcrete   05/04/2018   Conditional Approval   ERNESTO CORRAL
  Deputy Steel/Welding   05/04/2018   Conditional Approval   ERNESTO CORRAL
  Insulation   05/04/2018   Partial Inspection   ERNESTO CORRAL
  Interior/Exterior Lathing   05/04/2018   Partial Inspection   ERNESTO CORRAL
  Deputy Drilled-In Anchors   05/07/2018   Conditional Approval   ERNESTO CORRAL
  Deputy Fireproofing   05/07/2018   Conditional Approval   ERNESTO CORRAL
  Deputy Pre-Stress Concrete   05/07/2018   Conditional Approval   ERNESTO CORRAL
  Deputy Reinf. Concrete   05/07/2018   Conditional Approval   ERNESTO CORRAL
  Deputy Reinf. Masonry   05/07/2018   Conditional Approval   ERNESTO CORRAL
  Deputy Shotcrete   05/07/2018   Conditional Approval   ERNESTO CORRAL
  Deputy Steel/Welding   05/07/2018   Conditional Approval   ERNESTO CORRAL
  Insulation   05/07/2018   Partial Inspection   ERNESTO CORRAL
  Deputy Drilled-In Anchors   05/08/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Fireproofing   05/08/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   05/08/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   05/08/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   05/08/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Shotcrete   05/08/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   05/08/2018   Conditional Approval   LESLIE TRUJILLO
  Floor/Roof Diaphrgm/Shear Wall   05/08/2018   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   05/09/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Fireproofing   05/09/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   05/09/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   05/09/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   05/09/2018   Conditional Approval   LESLIE TRUJILLO
  Interior/Exterior Lathing   05/09/2018   Partial Approval   LESLIE TRUJILLO
  Light Gage Steel Frame   05/09/2018   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   05/10/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Fireproofing   05/10/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   05/10/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   05/10/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   05/10/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   05/11/2018   Partial Approval   JAMES POWERS
  Deputy Fireproofing   05/11/2018   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   05/11/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   05/11/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   05/11/2018   Partial Approval   JAMES POWERS
  Insulation   05/11/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   05/14/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Fireproofing   05/14/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   05/14/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   05/14/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   05/14/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Fireproofing   05/15/2018   Conditional Approval   LESLIE TRUJILLO
  Floor/Roof Diaphrgm/Shear Wall   05/15/2018   Partial Approval   LESLIE TRUJILLO
  Light Gage Steel Frame   05/15/2018   Partial Approval   LESLIE TRUJILLO
  Reinforced Concrete Frame   05/15/2018   Partial Approval   LESLIE TRUJILLO
  Deputy Fireproofing   05/16/2018   Conditional Approval   LESLIE TRUJILLO
  Drywall Nailing   05/16/2018   Partial Approval   LESLIE TRUJILLO
  Deputy Fireproofing   05/17/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   05/18/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Fireproofing   05/18/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   05/18/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   05/18/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   05/18/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   05/21/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Fireproofing   05/21/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   05/21/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   05/21/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   05/21/2018   Conditional Approval   LESLIE TRUJILLO
  Floor/Roof Diaphrgm/Shear Wall   05/21/2018   Partial Approval   LESLIE TRUJILLO
  Insulation   05/21/2018   Partial Approval   LESLIE TRUJILLO
  Light Gage Steel Frame   05/21/2018   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   05/22/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Fireproofing   05/22/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   05/22/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   05/22/2018   Approved   LESLIE TRUJILLO
  Deputy Steel/Welding   05/22/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   05/23/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Fireproofing   05/23/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   05/23/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   05/23/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   05/23/2018   Conditional Approval   LESLIE TRUJILLO
  Floor/Roof Diaphrgm/Shear Wall   05/23/2018   Partial Approval   LESLIE TRUJILLO
  Light Gage Steel Frame   05/23/2018   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   05/24/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   05/25/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Fireproofing   05/25/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   05/25/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   05/25/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   05/25/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   05/25/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   05/29/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Fireproofing   05/29/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   05/29/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   05/29/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   05/29/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   05/29/2018   Conditional Approval   LESLIE TRUJILLO
  Interior/Exterior Lathing   05/29/2018   Partial Approval   LESLIE TRUJILLO
  Light Gage Steel Frame   05/29/2018   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   05/30/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Fireproofing   05/30/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   05/30/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   05/30/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   05/30/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   05/30/2018   Conditional Approval   LESLIE TRUJILLO
  Light Gage Steel Frame   05/30/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   05/31/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Fireproofing   05/31/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   05/31/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   05/31/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   05/31/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   05/31/2018   Conditional Approval   LESLIE TRUJILLO
  Insulation   05/31/2018   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   06/01/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Fireproofing   06/01/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   06/01/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   06/01/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   06/01/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   06/01/2018   Conditional Approval   LESLIE TRUJILLO
  Insulation   06/01/2018   Partial Inspection   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   06/04/2018   Conditional Approval   ERNESTO CORRAL
  Deputy Fireproofing   06/04/2018   Conditional Approval   ERNESTO CORRAL
  Deputy Pre-Stress Concrete   06/04/2018   Conditional Approval   ERNESTO CORRAL
  Deputy Reinf. Concrete   06/04/2018   Conditional Approval   ERNESTO CORRAL
  Deputy Steel/Welding   06/04/2018   Conditional Approval   ERNESTO CORRAL
  Light Gage Steel Frame   06/04/2018   Partial Inspection   ERNESTO CORRAL
  Reinforced Concrete Frame   06/04/2018   Partial Inspection   ERNESTO CORRAL
  Deputy Drilled-In Anchors   06/05/2018   Conditional Approval   NICK DANERI
  Deputy Fireproofing   06/05/2018   Conditional Approval   NICK DANERI
  Deputy Pre-Stress Concrete   06/05/2018   Conditional Approval   NICK DANERI
  Deputy Reinf. Concrete   06/05/2018   Conditional Approval   NICK DANERI
  Deputy Steel/Welding   06/05/2018   Conditional Approval   NICK DANERI
  Insulation   06/05/2018   Partial Approval   NICK DANERI
  Deputy Drilled-In Anchors   06/06/2018   Partial Approval   JAMES POWERS
  Deputy Fireproofing   06/06/2018   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   06/06/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   06/06/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   06/06/2018   Partial Approval   JAMES POWERS
  Drywall Nailing   06/06/2018   Partial Approval   JAMES POWERS
  Insulation   06/06/2018   Partial Approval   JAMES POWERS
  Light Gage Steel Frame   06/06/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   06/07/2018   Conditional Approval   ERNESTO CORRAL
  Deputy Fireproofing   06/07/2018   Conditional Approval   ERNESTO CORRAL
  Deputy Pre-Stress Concrete   06/07/2018   Conditional Approval   ERNESTO CORRAL
  Deputy Reinf. Concrete   06/07/2018   Conditional Approval   ERNESTO CORRAL
  Deputy Steel/Welding   06/07/2018   Conditional Approval   ERNESTO CORRAL
  Deputy Drilled-In Anchors   06/08/2018   Conditional Approval   ERNESTO CORRAL
  Deputy Fireproofing   06/08/2018   Conditional Approval   ERNESTO CORRAL
  Deputy Pre-Stress Concrete   06/08/2018   Conditional Approval   ERNESTO CORRAL
  Deputy Reinf. Concrete   06/08/2018   Conditional Approval   ERNESTO CORRAL
  Deputy Steel/Welding   06/08/2018   Conditional Approval   ERNESTO CORRAL
  Floor/Roof Diaphrgm/Shear Wall   06/08/2018   Partial Inspection   ERNESTO CORRAL
  Deputy Drilled-In Anchors   06/11/2018   Partial Approval   JAMES POWERS
  Deputy Fireproofing   06/11/2018   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   06/11/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   06/11/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   06/11/2018   Partial Approval   JAMES POWERS
  Drywall Nailing   06/12/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   06/13/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   06/13/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   06/14/2018   Conditional Approval   NICK DANERI
  Deputy Reinf. Masonry   06/14/2018   Conditional Approval   NICK DANERI
  Deputy Drilled-In Anchors   06/15/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   06/15/2018   Partial Approval   JAMES POWERS
  Pre-Inspection   06/15/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   06/18/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Fireproofing   06/18/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   06/18/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   06/18/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   06/18/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   06/18/2018   Conditional Approval   LESLIE TRUJILLO
  Light Gage Steel Frame   06/18/2018   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   06/19/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Fireproofing   06/19/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   06/19/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   06/19/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   06/19/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   06/19/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   06/20/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Fireproofing   06/20/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   06/20/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   06/20/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   06/20/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   06/21/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Fireproofing   06/21/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   06/21/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   06/21/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   06/21/2018   Conditional Approval   LESLIE TRUJILLO
  Floor/Roof Diaphrgm/Shear Wall   06/21/2018   Partial Inspection   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   06/22/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Fireproofing   06/22/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   06/22/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   06/22/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   06/22/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   06/25/2018   Conditional Approval   LESLIE TRUJILLO
  Floor/Roof Diaphrgm/Shear Wall   06/25/2018   Partial Approval   LESLIE TRUJILLO
  Pre-Inspection   06/25/2018   Partial Inspection   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   06/26/2018   Conditional Approval   LESLIE TRUJILLO
  Floor/Roof Diaphrgm/Shear Wall   06/26/2018   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   06/27/2018   Conditional Approval   LESLIE TRUJILLO
  Light Gage Steel Frame   06/27/2018   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   06/28/2018   Conditional Approval   LESLIE TRUJILLO
  Light Gage Steel Frame   06/28/2018   Partial Approval   LESLIE TRUJILLO
  Reinforced Concrete Frame   06/28/2018   Partial Approval   LESLIE TRUJILLO
  Structural Steel Frame   06/28/2018   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   06/29/2018   Conditional Approval   LESLIE TRUJILLO
  Light Gage Steel Frame   06/29/2018   Partial Approval   LESLIE TRUJILLO
  Pre-Inspection   06/29/2018   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   07/02/2018   Partial Approval   LESLIE TRUJILLO
  Deputy Fireproofing   07/02/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   07/02/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   07/02/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   07/02/2018   Conditional Approval   LESLIE TRUJILLO
  Insulation   07/02/2018   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   07/03/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Fireproofing   07/03/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   07/03/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   07/03/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   07/03/2018   Conditional Approval   LESLIE TRUJILLO
  Floor/Roof Diaphrgm/Shear Wall   07/03/2018   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   07/05/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Fireproofing   07/05/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   07/05/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   07/05/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   07/05/2018   Conditional Approval   LESLIE TRUJILLO
  Light Gage Steel Frame   07/05/2018   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   07/06/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Fireproofing   07/06/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   07/06/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   07/06/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   07/06/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   07/09/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Fireproofing   07/09/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   07/09/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   07/09/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   07/09/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   07/10/2018   Corrections Issued   LESLIE TRUJILLO
  Floor/Roof Diaphrgm/Shear Wall   07/10/2018   Partial Inspection   LESLIE TRUJILLO
  Light Gage Steel Frame   07/10/2018   Partial Inspection   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   07/11/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   07/12/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   07/13/2018   Conditional Approval   LESLIE TRUJILLO
  Drywall Nailing   07/13/2018   Partial Approval   LESLIE TRUJILLO
  Light Gage Steel Frame   07/13/2018   Partial Approval   LESLIE TRUJILLO
  Pre-Inspection   07/16/2018   Partial Inspection   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   07/17/2018   Conditional Approval   LESLIE TRUJILLO
  Insulation   07/17/2018   Partial Approval   LESLIE TRUJILLO
  Light Gage Steel Frame   07/17/2018   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   07/18/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   07/19/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   07/20/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   07/23/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   07/24/2018   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   07/25/2018   Conditional Approval   LESLIE TRUJILLO
  Light Gage Steel Frame   07/25/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   07/26/2018   Conditional Approval   LESLIE TRUJILLO
  Light Gage Steel Frame   07/26/2018   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   07/27/2018   Conditional Approval   LESLIE TRUJILLO
  Light Gage Steel Frame   07/27/2018   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   07/30/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   07/31/2018   Conditional Approval   LESLIE TRUJILLO
  Light Gage Steel Frame   07/31/2018   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   08/01/2018   Conditional Approval   LESLIE TRUJILLO
  Drywall Nailing   08/01/2018   Partial Inspection   LESLIE TRUJILLO
  Light Gage Steel Frame   08/01/2018   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   08/02/2018   Conditional Approval   LESLIE TRUJILLO
  Light Gage Steel Frame   08/02/2018   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   08/03/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   08/06/2018   Conditional Approval   LESLIE TRUJILLO
  Light Gage Steel Frame   08/07/2018   Partial Approval   LESLIE TRUJILLO
  Light Gage Steel Frame   08/08/2018   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   08/09/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Fireproofing   08/09/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   08/09/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   08/09/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   08/09/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   08/10/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Fireproofing   08/10/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   08/10/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   08/10/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   08/10/2018   Conditional Approval   LESLIE TRUJILLO
  Light Gage Steel Frame   08/10/2018   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   08/13/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Fireproofing   08/13/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   08/13/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   08/13/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   08/13/2018   Conditional Approval   LESLIE TRUJILLO
  Light Gage Steel Frame   08/13/2018   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   08/14/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Fireproofing   08/14/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   08/14/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   08/14/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   08/14/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   08/15/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Fireproofing   08/15/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   08/15/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   08/15/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   08/15/2018   Conditional Approval   LESLIE TRUJILLO
  Light Gage Steel Frame   08/17/2018   Partial Approval   LESLIE TRUJILLO
  Light Gage Steel Frame   08/21/2018   Conditional Approval   LESLIE TRUJILLO
  Floor/Roof Diaphrgm/Shear Wall   08/23/2018   Partial Approval   LESLIE TRUJILLO
  Light Gage Steel Frame   08/23/2018   Partial Approval   LESLIE TRUJILLO
  Light Gage Steel Frame   08/24/2018   Partial Approval   LESLIE TRUJILLO
  Light Gage Steel Frame   08/27/2018   Partial Approval   JAMES POWERS
  Light Gage Steel Frame   08/28/2018   Partial Approval   LESLIE TRUJILLO
  Floor/Roof Diaphrgm/Shear Wall   08/30/2018   Partial Approval   LESLIE TRUJILLO
  Light Gage Steel Frame   08/30/2018   Partial Approval   LESLIE TRUJILLO
  Light Gage Steel Frame   08/31/2018   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   09/05/2018   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   09/05/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   09/05/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   09/05/2018   Partial Approval   JAMES POWERS
  Light Gage Steel Frame   09/05/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   09/06/2018   Conditional Approval   NICK DANERI
  Deputy Pre-Stress Concrete   09/06/2018   Conditional Approval   NICK DANERI
  Deputy Reinf. Concrete   09/06/2018   Conditional Approval   NICK DANERI
  Deputy Steel/Welding   09/06/2018   Conditional Approval   NICK DANERI
  Insulation   09/06/2018   Partial Approval   NICK DANERI
  Light Gage Steel Frame   09/06/2018   Partial Approval   NICK DANERI
  Deputy Drilled-In Anchors   09/07/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   09/07/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   09/07/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   09/07/2018   Conditional Approval   LESLIE TRUJILLO
  Light Gage Steel Frame   09/07/2018   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   09/10/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   09/10/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   09/10/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   09/10/2018   Conditional Approval   LESLIE TRUJILLO
  Light Gage Steel Frame   09/10/2018   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   09/11/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   09/11/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   09/11/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   09/11/2018   Conditional Approval   LESLIE TRUJILLO
  Floor/Roof Diaphrgm/Shear Wall   09/12/2018   Partial Inspection   LESLIE TRUJILLO
  Light Gage Steel Frame   09/12/2018   Partial Approval   LESLIE TRUJILLO
  Floor/Roof Diaphrgm/Shear Wall   09/13/2018   Partial Approval   LESLIE TRUJILLO
  Light Gage Steel Frame   09/13/2018   Partial Approval   LESLIE TRUJILLO
  Insulation   09/14/2018   Partial Approval   LESLIE TRUJILLO
  Interior/Exterior Lathing   09/14/2018   Partial Approval   LESLIE TRUJILLO
  Light Gage Steel Frame   09/14/2018   Partial Approval   LESLIE TRUJILLO
  Insulation   09/17/2018   Partial Approval   LESLIE TRUJILLO
  Light Gage Steel Frame   09/17/2018   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   09/18/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   09/18/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   09/19/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   09/19/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   09/20/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   09/20/2018   Conditional Approval   LESLIE TRUJILLO
  Light Gage Steel Frame   09/20/2018   Partial Approval   LESLIE TRUJILLO
  Structural Steel Frame   09/20/2018   Partial Approval   LESLIE TRUJILLO
  Wall Anchors   09/20/2018   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   09/21/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   09/21/2018   Partial Approval   JAMES POWERS
  Insulation   09/21/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   09/24/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   09/24/2018   Partial Approval   JAMES POWERS
  Floor/Roof Diaphrgm/Shear Wall   09/24/2018   Partial Approval   JAMES POWERS
  Light Gage Steel Frame   09/24/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   09/25/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   09/25/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   09/25/2018   Conditional Approval   LESLIE TRUJILLO
  Drywall Nailing   09/25/2018   Partial Approval   LESLIE TRUJILLO
  Light Gage Steel Frame   09/25/2018   Corrections Issued   LESLIE TRUJILLO
  Reinforced Concrete Frame   09/25/2018   Partial Inspection   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   09/26/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   09/26/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   09/26/2018   Conditional Approval   LESLIE TRUJILLO
  Light Gage Steel Frame   09/26/2018   Partial Inspection   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   09/27/2018   Conditional Approval   NICK DANERI
  Deputy Reinf. Concrete   09/27/2018   Conditional Approval   NICK DANERI
  Deputy Steel/Welding   09/27/2018   Conditional Approval   NICK DANERI
  Deputy Drilled-In Anchors   09/28/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   09/28/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   09/28/2018   Conditional Approval   LESLIE TRUJILLO
  Insulation   09/28/2018   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   10/01/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Fireproofing   10/01/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   10/01/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   10/01/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   10/01/2018   Conditional Approval   LESLIE TRUJILLO
  Light Gage Steel Frame   10/01/2018   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   10/02/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Fireproofing   10/02/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   10/02/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   10/02/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   10/02/2018   Conditional Approval   LESLIE TRUJILLO
  Floor/Roof Diaphrgm/Shear Wall   10/02/2018   Partial Approval   LESLIE TRUJILLO
  Light Gage Steel Frame   10/02/2018   Partial Approval   LESLIE TRUJILLO
  Reinforced Concrete Frame   10/02/2018   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   10/03/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Fireproofing   10/03/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   10/03/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   10/03/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   10/03/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   10/04/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Fireproofing   10/04/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   10/04/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   10/04/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   10/04/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   10/05/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Fireproofing   10/05/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   10/05/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   10/05/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   10/05/2018   Conditional Approval   LESLIE TRUJILLO
  Insulation   10/05/2018   Partial Approval   LESLIE TRUJILLO
  Light Gage Steel Frame   10/05/2018   Partial Approval   LESLIE TRUJILLO
  Structural Steel Frame   10/05/2018   Partial Approval   LESLIE TRUJILLO
  Drywall Nailing   10/09/2018   Partial Approval   LESLIE TRUJILLO
  Light Gage Steel Frame   10/09/2018   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   10/10/2018   Conditional Approval   LESLIE TRUJILLO
  Insulation   10/10/2018   Partial Approval   LESLIE TRUJILLO
  Light Gage Steel Frame   10/10/2018   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   10/11/2018   Conditional Approval   LESLIE TRUJILLO
  Light Gage Steel Frame   10/11/2018   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   10/12/2018   Partial Approval   LESLIE TRUJILLO
  Floor/Roof Diaphrgm/Shear Wall   10/12/2018   Partial Approval   LESLIE TRUJILLO
  Insulation   10/12/2018   Partial Approval   LESLIE TRUJILLO
  Light Gage Steel Frame   10/12/2018   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   10/15/2018   Conditional Approval   LESLIE TRUJILLO
  Light Gage Steel Frame   10/15/2018   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   10/16/2018   Conditional Approval   LESLIE TRUJILLO
  Light Gage Steel Frame   10/16/2018   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   10/17/2018   Conditional Approval   LESLIE TRUJILLO
  Drywall Nailing   10/17/2018   Partial Approval   LESLIE TRUJILLO
  Floor/Roof Diaphrgm/Shear Wall   10/17/2018   Partial Approval   LESLIE TRUJILLO
  Light Gage Steel Frame   10/17/2018   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   10/18/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   10/19/2018   Conditional Approval   LESLIE TRUJILLO
  Insulation   10/19/2018   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   10/22/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   10/22/2018   Partial Approval   LESLIE TRUJILLO
  Light Gage Steel Frame   10/22/2018   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   10/23/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   10/23/2018   Conditional Approval   LESLIE TRUJILLO
  Floor/Roof Diaphrgm/Shear Wall   10/23/2018   Partial Approval   LESLIE TRUJILLO
  Light Gage Steel Frame   10/23/2018   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   10/24/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   10/24/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   10/25/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   10/25/2018   Conditional Approval   LESLIE TRUJILLO
  Drywall Nailing   10/25/2018   Partial Approval   LESLIE TRUJILLO
  Insulation   10/25/2018   Partial Approval   LESLIE TRUJILLO
  Light Gage Steel Frame   10/25/2018   Partial Approval   LESLIE TRUJILLO
  Reinforced Concrete Frame   10/25/2018   Partial Approval   LESLIE TRUJILLO
  Structural Steel Frame   10/25/2018   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   10/26/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   10/26/2018   Conditional Approval   LESLIE TRUJILLO
  Insulation   10/26/2018   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   10/29/2018   Conditional Approval   LESLIE TRUJILLO
  Floor/Roof Diaphrgm/Shear Wall   10/29/2018   Partial Approval   LESLIE TRUJILLO
  Insulation   10/29/2018   Partial Approval   LESLIE TRUJILLO
  Interior/Exterior Lathing   10/29/2018   Partial Approval   LESLIE TRUJILLO
  Light Gage Steel Frame   10/29/2018   Partial Approval   LESLIE TRUJILLO
  Reinforced Masonry Frame   10/29/2018   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   10/30/2018   Conditional Approval   LESLIE TRUJILLO
  Light Gage Steel Frame   10/30/2018   Partial Approval   LESLIE TRUJILLO
  Reinforced Concrete Frame   10/30/2018   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   10/31/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   11/01/2018   Conditional Approval   LESLIE TRUJILLO
  Drywall Nailing   11/01/2018   Partial Approval   LESLIE TRUJILLO
  Floor/Roof Diaphrgm/Shear Wall   11/01/2018   Partial Approval   LESLIE TRUJILLO
  Light Gage Steel Frame   11/01/2018   Partial Approval   LESLIE TRUJILLO
  Floor/Roof Diaphrgm/Shear Wall   11/02/2018   Partial Approval   LESLIE TRUJILLO
  Insulation   11/02/2018   Partial Approval   LESLIE TRUJILLO
  Light Gage Steel Frame   11/02/2018   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   11/05/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   11/05/2018   Conditional Approval   LESLIE TRUJILLO
  Drywall Nailing   11/05/2018   Partial Approval   LESLIE TRUJILLO
  Interior/Exterior Lathing   11/05/2018   Partial Approval   LESLIE TRUJILLO
  Light Gage Steel Frame   11/05/2018   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   11/06/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   11/06/2018   Conditional Approval   LESLIE TRUJILLO
  Drywall Nailing   11/06/2018   Partial Approval   LESLIE TRUJILLO
  Light Gage Steel Frame   11/06/2018   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   11/07/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   11/07/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   11/08/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   11/08/2018   Conditional Approval   LESLIE TRUJILLO
  Light Gage Steel Frame   11/08/2018   Partial Approval   LESLIE TRUJILLO
  Pre-Inspection   11/08/2018   Partial Inspection   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   11/09/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   11/09/2018   Conditional Approval   LESLIE TRUJILLO
  Drywall Nailing   11/09/2018   Partial Approval   LESLIE TRUJILLO
  Floor/Roof Diaphrgm/Shear Wall   11/09/2018   Partial Approval   LESLIE TRUJILLO
  Insulation   11/09/2018   Partial Approval   LESLIE TRUJILLO
  Interior/Exterior Lathing   11/09/2018   Partial Approval   LESLIE TRUJILLO
  Wall Anchors   11/09/2018   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   11/13/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   11/13/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   11/14/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   11/14/2018   Conditional Approval   LESLIE TRUJILLO
  Insulation   11/14/2018   Partial Approval   LESLIE TRUJILLO
  Light Gage Steel Frame   11/14/2018   Partial Approval   LESLIE TRUJILLO
  Wall Anchors   11/14/2018   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   11/15/2018   Conditional Approval   LESLIE TRUJILLO
  Drywall Nailing   11/15/2018   Partial Approval   LESLIE TRUJILLO
  Light Gage Steel Frame   11/15/2018   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   11/16/2018   Conditional Approval   LESLIE TRUJILLO
  Floor/Roof Diaphrgm/Shear Wall   11/16/2018   Partial Approval   LESLIE TRUJILLO
  Insulation   11/16/2018   Partial Approval   LESLIE TRUJILLO
  Light Gage Steel Frame   11/16/2018   Partial Approval   LESLIE TRUJILLO
  Pre-Inspection   11/16/2018   Partial Approval   LESLIE TRUJILLO
  Reinforced Concrete Frame   11/16/2018   Partial Inspection   LESLIE TRUJILLO
  Structural Steel Frame   11/16/2018   Not Ready for Inspection   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   11/19/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   11/20/2018   Conditional Approval   LESLIE TRUJILLO
  Light Gage Steel Frame   11/20/2018   Partial Approval   LESLIE TRUJILLO
  Reinforced Masonry Frame   11/20/2018   Partial Approval   LESLIE TRUJILLO
  Drywall Nailing   11/21/2018   Partial Approval   LESLIE TRUJILLO
  Insulation   11/27/2018   Partial Approval   LESLIE TRUJILLO
  Floor/Roof Diaphrgm/Shear Wall   11/28/2018   Partial Approval   LESLIE TRUJILLO
  Insulation   11/28/2018   Partial Approval   LESLIE TRUJILLO
  Light Gage Steel Frame   11/29/2018   Partial Inspection   LESLIE TRUJILLO
  Drywall Nailing   11/30/2018   Partial Approval   LESLIE TRUJILLO
  Light Gage Steel Frame   11/30/2018   Partial Approval   LESLIE TRUJILLO
  Interior/Exterior Lathing   12/03/2018   Partial Approval   LESLIE TRUJILLO
  Light Gage Steel Frame   12/03/2018   Partial Approval   LESLIE TRUJILLO
  Reinforced Concrete Frame   12/04/2018   Partial Approval   LESLIE TRUJILLO
  Wall Anchors   12/04/2018   Partial Approval   LESLIE TRUJILLO
  Floor/Roof Diaphrgm/Shear Wall   12/05/2018   Partial Approval   LESLIE TRUJILLO
  Light Gage Steel Frame   12/07/2018   Partial Approval   LESLIE TRUJILLO
  Drywall Nailing   12/10/2018   Partial Approval   LESLIE TRUJILLO
  Light Gage Steel Frame   12/10/2018   Partial Approval   LESLIE TRUJILLO
  Floor/Roof Diaphrgm/Shear Wall   12/13/2018   Partial Approval   LESLIE TRUJILLO
  Insulation   12/13/2018   Partial Approval   LESLIE TRUJILLO
  Pre-Inspection   12/13/2018   Partial Inspection   LESLIE TRUJILLO
  Light Gage Steel Frame   12/14/2018   Partial Approval   LESLIE TRUJILLO
  Drywall Nailing   12/18/2018   Partial Approval   LESLIE TRUJILLO
  Floor/Roof Diaphrgm/Shear Wall   12/19/2018   Partial Inspection   LESLIE TRUJILLO
  Insulation   12/19/2018   Partial Approval   LESLIE TRUJILLO
  Floor/Roof Diaphrgm/Shear Wall   12/20/2018   Partial Approval   LESLIE TRUJILLO
  Drywall Nailing   12/21/2018   Conditional Approval   LESLIE TRUJILLO
  Floor/Roof Diaphrgm/Shear Wall   12/21/2018   Conditional Approval   LESLIE TRUJILLO
  Light Gage Steel Frame   12/21/2018   Conditional Approval   LESLIE TRUJILLO
  Reinforced Concrete Frame   12/21/2018   Conditional Approval   LESLIE TRUJILLO
  Wall Anchors   12/24/2018   No Access for Inspection   LESLIE TRUJILLO
  Floor/Roof Diaphrgm/Shear Wall   12/26/2018   Partial Approval   LESLIE TRUJILLO
  Light Gage Steel Frame   12/26/2018   Partial Approval   LESLIE TRUJILLO
  Floor/Roof Diaphrgm/Shear Wall   12/27/2018   Partial Approval   LESLIE TRUJILLO
  Insulation   12/27/2018   Partial Approval   LESLIE TRUJILLO
  Pre-Inspection   12/27/2018   Partial Inspection   LESLIE TRUJILLO
  Interior/Exterior Lathing   12/28/2018   Partial Approval   LESLIE TRUJILLO
  Light Gage Steel Frame   12/28/2018   Partial Approval   LESLIE TRUJILLO
  Reinforced Concrete Frame   01/02/2019   Partial Approval   LESLIE TRUJILLO
  Light Gage Steel Frame   01/03/2019   Partial Approval   LESLIE TRUJILLO
  Light Gage Steel Frame   01/04/2019   Partial Approval   LESLIE TRUJILLO
  Drywall Nailing   01/07/2019   Partial Approval   LESLIE TRUJILLO
  Floor/Roof Diaphrgm/Shear Wall   01/08/2019   Partial Approval   LESLIE TRUJILLO
  Insulation   01/08/2019   Partial Approval   LESLIE TRUJILLO
  Interior/Exterior Lathing   01/08/2019   Partial Approval   LESLIE TRUJILLO
  Light Gage Steel Frame   01/08/2019   Partial Approval   LESLIE TRUJILLO
  Light Gage Steel Frame   01/09/2019   Partial Inspection   LESLIE TRUJILLO
  Light Gage Steel Frame   01/11/2019   Partial Approval   LESLIE TRUJILLO
  Light Gage Steel Frame   01/14/2019   Partial Approval   LESLIE TRUJILLO
  Floor/Roof Diaphrgm/Shear Wall   01/16/2019   Partial Inspection   LESLIE TRUJILLO
  Light Gage Steel Frame   01/16/2019   Partial Approval   LESLIE TRUJILLO
  Reinforced Concrete Frame   01/16/2019   Partial Approval   LESLIE TRUJILLO
  Insulation   01/17/2019   Partial Approval   LESLIE TRUJILLO
  Light Gage Steel Frame   01/17/2019   Partial Approval   LESLIE TRUJILLO
  Drywall Nailing   01/18/2019   Partial Approval   LESLIE TRUJILLO
  Light Gage Steel Frame   01/18/2019   Partial Approval   LESLIE TRUJILLO
  Light Gage Steel Frame   03/18/2019   Partial Approval   LESLIE TRUJILLO
  Light Gage Steel Frame   03/22/2019   Partial Approval   LESLIE TRUJILLO
  Pre-Inspection   10/22/2019   Partial Inspection   LESLIE TRUJILLO
  Structural Steel Frame   03/19/2020   Partial Inspection   LESLIE TRUJILLO
  Pre-Inspection   03/20/2020   Partial Inspection   LESLIE TRUJILLO
  Pre-Inspection   06/29/2020   Conditional Approval   NICK DANERI
  Pre-Inspection   06/30/2020   Conditional Approval   NICK DANERI
  Special/Order Compliance   03/22/2021   Partial Approval   NICK DANERI