Los Angeles department of building safty logo Permit and Inspection Report banner
1200 S FIGUEROA ST 90015
APPLICATION / PERMIT NUMBER: 13010-10000-04232
PLAN CHECK / JOB NUMBER: B13LA15983

Plan Check and Permit Information


GROUP: Building
TYPE: Bldg-New
SUB-TYPE: Apartment
PRIMARY USE: (5) Apartment
WORK DESCRIPTION: New two 34-story mixed use building (Apartment, core and shell only retail and garage)
PERMIT ISSUED: Yes PERMIT ISSUE DATE: 11/09/2015 ISSUING OFFICE: Metro
CURRENT STATUS: CofO Issued CURRENT STATUS DATE: 03/09/2020

Permit Application Status History
Submitted 12/20/2013 APPLICANT
Assigned to Plan Check Engineer 01/17/2014 SAI KHUM
Corrections Issued 01/23/2014 SAI KHUM
Building Plans Picked Up 01/30/2014 APPLICANT
Quality Review Completed 02/04/2014 CHARLES CHANG
Applicant returned to address corrections 04/23/2014 CHARLES CHANG
Applicant returned to address corrections 04/29/2014 ALLEN MANALANSAN
Applicant returned to address corrections 06/12/2014 ALLEN MANALANSAN
Applicant returned to address corrections 07/23/2014 SAI KHUM
Applicant returned to address corrections 07/23/2014 ALLEN MANALANSAN
Applicant returned to address corrections 07/23/2014 CHARLES CHANG
Applicant returned to address corrections 08/13/2014 ALLEN MANALANSAN
Applicant returned to address corrections 08/14/2014 ALLEN MANALANSAN
Applicant returned to address corrections 08/14/2014 SAI KHUM
Applicant returned to address corrections 09/19/2014 ALLEN MANALANSAN
Applicant returned to address corrections 10/09/2014 ALLEN MANALANSAN
Applicant returned to address corrections 10/09/2014 SAI KHUM
Applicant returned to address corrections 10/21/2014 ALLEN MANALANSAN
Applicant returned to address corrections 10/30/2014 SAI KHUM
Applicant returned to address corrections 12/18/2014 ALLEN MANALANSAN
Applicant returned to address corrections 04/02/2015 SAI KHUM
Applicant returned to address corrections 07/09/2015 ALLEN MANALANSAN
Applicant returned to address corrections 08/19/2015 ALLEN MANALANSAN
Applicant returned to address corrections 09/01/2015 ALLEN MANALANSAN
Applicant returned to address corrections 09/09/2015 SAI KHUM
Plan Check Approved 10/06/2015 ALLEN MANALANSAN
Issued 11/09/2015 LADBS
CofO in Progress 03/06/2020 JAMES POWERS
Permit Finaled 03/09/2020 TERRY HERR
CofO Issued 03/09/2020 TERRY HERR
Permit Finaled 03/09/2020 TERRY HERR

Permit Application Clearance Information
Address approval Cleared 10/21/2014 JAMES KHO
Eng Process Fee Ord 176,300 Cleared 10/21/2014 JAMES KHO
Sewer availability Cleared 10/21/2014 JAMES KHO
Building over 3-story or 36-ft Cleared 10/30/2014 CALOSHA APPROVED
Work Adjacent to Public Way Cleared 03/26/2015 TERRY PHAN
Methane Ordinance Cleared 05/06/2015 DAVE MYERS
Driveway location Cleared 07/31/2015 WESTON PRINGLE
Encroachment in public way Cleared 07/31/2015 JAMES KHO
Highway dedication Cleared 07/31/2015 JAMES KHO
Internal circulation Cleared 07/31/2015 WESTON PRINGLE
Permit Cleared 07/31/2015 JAMES KHO
Specific Plan Cleared 07/31/2015 WESTON PRINGLE
Low Impact Development Cleared 08/28/2015 AMMAR ELTAWIL
Roof/Waste drainage to street Cleared 08/28/2015 JAMES KHO
Stormwater Pollution Mitigatn Cleared 08/28/2015 AMMAR ELTAWIL
Hydrant and Access approval Cleared 08/31/2015 JOHN CONNEALLY
Green Code Cleared 09/01/2015 ALDO UBAU
Title 19 building approval Cleared 09/01/2015 ANDREW KO
DAS Clearance Cleared 09/04/2015 SAI KWAN KHUM
APC Cleared 09/08/2015 MARITZA PRZEKOP
CPC Cleared 09/08/2015 MARITZA PRZEKOP
Frnt yard landscape/Water mgmt Cleared 09/08/2015 MARITZA PRZEKOP
Miscellaneous Cleared 09/08/2015 MARITZA PRZEKOP
Opn space landscape/Water mgmt Cleared 09/08/2015 MARITZA PRZEKOP
Prkng lot landscape/Water mgmt Cleared 09/08/2015 MARITZA PRZEKOP
Site Plan review Cleared 09/08/2015 MARITZA PRZEKOP
Specific Plan Cleared 09/08/2015 MARITZA PRZEKOP
Tract Map conditions Cleared 09/08/2015 MARITZA PRZEKOP
ZA Case Cleared 09/08/2015 MARITZA PRZEKOP
Excavation more than 5-ft deep Cleared 09/09/2015 CALOSHA APPROVED
Metro Rail approval Cleared 09/09/2015 THAN WIN
Project located in CRA area Cleared 09/30/2015 JIM URQUHART

Licensed Professional/Contractor Information
Architect Information
Sawano, Albert Harumi; Lic. No.: C22918
1481 INDIANA AVE
SOUTH PASADENA, CA  91030
Contractor Information
Lend Lease (Us) Construction Inc; Lic. No.: 483550-B
200 PARK AVENUE 9TH FLOOR
ATTN GENERAL COUNSEL
NEW YORK, NY  10166
Engineer Information
Whiteley, Mark Lynn; Lic. No.: S5204
15312 451ST AVE SE
NORTH BEND, WA  98045
Engineer Information
Zadoorian, Christopher John; Lic. No.: GE2493
2121 S TOWNE CENTRE PLACE SUITE 130
ANAHEIM, CA  92806
Landscape Architect Information
Larkins, David Kenneth; Lic. No.: LA4226
10335 JEFFERSON BLVD
CULVER CITY, CA  90232

Inspection Activity Information

Inspector Information
NICK DANERI, (213) 202-5615
Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspection Request(s)
  No data available

Inspection Request History
  Deputy Reinf. Concrete   11/30/2015   Partial Approval   JAMES POWERS
  Deputy Shotcrete   11/30/2015   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   12/01/2015   Partial Approval   JAMES POWERS
  Deputy Shotcrete   12/01/2015   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   12/02/2015   Partial Approval   JAMES POWERS
  Deputy Shotcrete   12/02/2015   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   12/03/2015   Partial Approval   JAMES POWERS
  Deputy Shotcrete   12/03/2015   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   12/04/2015   Partial Approval   JAMES POWERS
  Deputy Shotcrete   12/04/2015   Partial Approval   JAMES POWERS
  METHANE-Rough   12/04/2015   Not Ready for Inspection   JAMES POWERS
  Reinforced Concrete Frame   12/04/2015   Partial Approval   JAMES POWERS
  SWPPP-Const. Storm Water   12/04/2015   Completed   JAMES POWERS
  Verify Sprinkler Sign Off   12/04/2015   Not Ready for Inspection   JAMES POWERS
  Deputy Reinf. Concrete   12/07/2015   Partial Approval   JAMES POWERS
  Floor/Roof Diaphrgm/Shear Wall   12/07/2015   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   12/08/2015   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   12/09/2015   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   12/10/2015   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   12/11/2015   Partial Approval   JAMES POWERS
  METHANE-Rough   12/11/2015   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   12/11/2015   Partial Approval   JAMES POWERS
  Verify Sprinkler Sign Off   12/11/2015   Not Ready for Inspection   JAMES POWERS
  Deputy Reinf. Concrete   12/14/2015   Partial Approval   JAMES POWERS
  Deputy Shotcrete   12/14/2015   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   12/15/2015   Partial Approval   JAMES POWERS
  Deputy Shotcrete   12/15/2015   Partial Approval   JAMES POWERS
  METHANE-Rough   12/15/2015   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   12/15/2015   Partial Approval   JAMES POWERS
  Verify Sprinkler Sign Off   12/15/2015   Not Ready for Inspection   JAMES POWERS
  Deputy Reinf. Concrete   12/16/2015   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   12/17/2015   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   12/17/2015   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   12/18/2015   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   12/21/2015   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   12/22/2015   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   12/23/2015   Partial Approval   JAMES POWERS
  METHANE-Rough   12/24/2015   Not Ready for Inspection   JAMES POWERS
  Reinforced Concrete Frame   12/24/2015   Not Ready for Inspection   JAMES POWERS
  Verify Sprinkler Sign Off   12/24/2015   Not Ready for Inspection   JAMES POWERS
  Deputy Reinf. Concrete   12/28/2015   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   12/29/2015   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   12/30/2015   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   12/30/2015   Not Ready for Inspection   JAMES POWERS
  Deputy Reinf. Concrete   12/31/2015   Partial Approval   JAMES POWERS
  METHANE-Rough   12/31/2015   Not Ready for Inspection   JAMES POWERS
  Reinforced Concrete Frame   12/31/2015   Partial Approval   JAMES POWERS
  Verify Sprinkler Sign Off   12/31/2015   Not Ready for Inspection   JAMES POWERS
  Deputy Reinf. Concrete   01/04/2016   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   01/04/2016   Not Ready for Inspection   JAMES POWERS
  Deputy Pre-Stress Concrete   01/05/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   01/05/2016   Partial Approval   JAMES POWERS
  Floor/Roof Diaphrgm/Shear Wall   01/05/2016   Not Ready for Inspection   JAMES POWERS
  Deputy Pre-Stress Concrete   01/06/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   01/06/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   01/07/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   01/07/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   01/08/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   01/08/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   01/11/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   01/12/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   01/12/2016   Partial Approval   JAMES POWERS
  METHANE-Rough   01/12/2016   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   01/12/2016   Partial Approval   JAMES POWERS
  Verify Sprinkler Sign Off   01/12/2016   Not Ready for Inspection   JAMES POWERS
  Deputy Pre-Stress Concrete   01/13/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   01/13/2016   Partial Approval   JAMES POWERS
  Footing/Foundation/Slab   01/13/2016   Not Ready for Inspection   JAMES POWERS
  METHANE-Barrier   01/13/2016   Partial Approval   JAMES POWERS
  METHANE-Subgrade   01/13/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   01/14/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   01/14/2016   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   01/14/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   01/15/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   01/15/2016   Partial Approval   JAMES POWERS
  Excavation/Setback/Form/Re-Bar   01/15/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   01/19/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   01/19/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   01/20/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   01/20/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   01/21/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   01/21/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   01/22/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   01/22/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   01/25/2016   Conditional Approval   LESLIE TRUJILLO
  METHANE-Rough   01/25/2016   Not Ready for Inspection   LESLIE TRUJILLO
  Reinforced Concrete Frame   01/25/2016   Not Ready for Inspection   LESLIE TRUJILLO
  Verify Sprinkler Sign Off   01/25/2016   Not Ready for Inspection   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   01/26/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   01/26/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   01/27/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   01/27/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   01/28/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   01/28/2016   Partial Approval   JAMES POWERS
  Footing/Foundation/Slab   01/28/2016   Partial Approval   JAMES POWERS
  METHANE-Barrier   01/28/2016   Partial Approval   JAMES POWERS
  METHANE-Subgrade   01/28/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   01/29/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   01/29/2016   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   01/29/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   02/01/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   02/01/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   02/02/2016   Approved   MICHAEL KUHN
  Deputy Reinf. Concrete   02/02/2016   Approved   MICHAEL KUHN
  Deputy Pre-Stress Concrete   02/03/2016   Approved   MICHAEL KUHN
  Deputy Reinf. Concrete   02/03/2016   Approved   MICHAEL KUHN
  Deputy Pre-Stress Concrete   02/04/2016   Approved   MICHAEL KUHN
  Deputy Reinf. Concrete   02/04/2016   Approved   MICHAEL KUHN
  Deputy Pre-Stress Concrete   02/05/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   02/05/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   02/08/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   02/08/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   02/09/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   02/09/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   02/10/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   02/10/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   02/11/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   02/11/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   02/12/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   02/12/2016   Partial Approval   JAMES POWERS
  METHANE-Rough   02/12/2016   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   02/12/2016   Partial Approval   JAMES POWERS
  Verify Sprinkler Sign Off   02/12/2016   Not Ready for Inspection   JAMES POWERS
  Wood Frame   02/13/2016   Off-Hour Fees Due   
  Wood Frame   02/15/2016   Off-Hour Fees Due   
  Deputy Pre-Stress Concrete   02/16/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   02/16/2016   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   02/16/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   02/17/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   02/17/2016   Partial Approval   JAMES POWERS
  METHANE-Rough   02/17/2016   Not Ready for Inspection   JAMES POWERS
  Reinforced Concrete Frame   02/17/2016   Partial Approval   JAMES POWERS
  Verify Sprinkler Sign Off   02/17/2016   Not Ready for Inspection   JAMES POWERS
  Deputy Pre-Stress Concrete   02/18/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   02/18/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   02/19/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   02/19/2016   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   02/19/2016   Not Ready for Inspection   JAMES POWERS
  Deputy Reinf. Concrete   02/22/2016   Partial Approval   JAMES POWERS
  Excavation/Setback/Form/Re-Bar   02/22/2016   Not Ready for Inspection   JAMES POWERS
  METHANE-Barrier   02/22/2016   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   02/22/2016   Partial Approval   JAMES POWERS
  Verify Sprinkler Sign Off   02/22/2016   Not Ready for Inspection   JAMES POWERS
  Deputy Pre-Stress Concrete   02/23/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   02/23/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   02/24/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   02/24/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   02/25/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   02/25/2016   Partial Approval   JAMES POWERS
  METHANE-Barrier   02/25/2016   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   02/25/2016   Partial Approval   JAMES POWERS
  Verify Sprinkler Sign Off   02/25/2016   Not Ready for Inspection   JAMES POWERS
  Deputy Pre-Stress Concrete   02/26/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   02/26/2016   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   02/26/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   02/29/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   02/29/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   03/01/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   03/01/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   03/02/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   03/02/2016   Partial Approval   JAMES POWERS
  METHANE-Rough   03/02/2016   Not Ready for Inspection   JAMES POWERS
  Reinforced Concrete Frame   03/02/2016   Partial Approval   JAMES POWERS
  Verify Sprinkler Sign Off   03/02/2016   Not Ready for Inspection   JAMES POWERS
  Deputy Pre-Stress Concrete   03/03/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   03/03/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   03/04/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   03/04/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   03/07/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   03/07/2016   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   03/07/2016   Not Ready for Inspection   JAMES POWERS
  Deputy Pre-Stress Concrete   03/08/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   03/08/2016   Partial Approval   JAMES POWERS
  Floor/Roof Diaphrgm/Shear Wall   03/08/2016   Partial Approval   JAMES POWERS
  METHANE-Barrier   03/08/2016   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   03/08/2016   Partial Approval   JAMES POWERS
  Verify Sprinkler Sign Off   03/08/2016   Not Ready for Inspection   JAMES POWERS
  Deputy Pre-Stress Concrete   03/09/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   03/09/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   03/10/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   03/10/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   03/11/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   03/11/2016   Partial Approval   JAMES POWERS
  METHANE-Rough   03/11/2016   Not Ready for Inspection   JAMES POWERS
  Reinforced Concrete Frame   03/11/2016   Partial Approval   JAMES POWERS
  Verify Sprinkler Sign Off   03/11/2016   Not Ready for Inspection   JAMES POWERS
  Deputy Pre-Stress Concrete   03/14/2016   Conditional Approval   WINSTON DUNNING
  Deputy Reinf. Concrete   03/14/2016   Conditional Approval   WINSTON DUNNING
  Structural Steel Frame   03/14/2016   Not Ready for Inspection   WINSTON DUNNING
  Deputy Pre-Stress Concrete   03/15/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   03/15/2016   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   03/15/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   03/16/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   03/16/2016   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   03/16/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   03/17/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   03/17/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   03/18/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   03/18/2016   Approved   JAMES POWERS
  Deputy Reinf. Concrete   03/18/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   03/21/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   03/21/2016   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   03/21/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   03/22/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   03/22/2016   Partial Approval   JAMES POWERS
  METHANE-Rough   03/22/2016   Not Ready for Inspection   JAMES POWERS
  Reinforced Concrete Frame   03/22/2016   Partial Approval   JAMES POWERS
  Verify Sprinkler Sign Off   03/22/2016   Not Ready for Inspection   JAMES POWERS
  Deputy Pre-Stress Concrete   03/23/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   03/23/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   03/24/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   03/24/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   03/25/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   03/25/2016   Partial Approval   JAMES POWERS
  Green Building Rough   03/28/2016   Not Ready for Inspection   JAMES POWERS
  Green Building Rough   03/28/2016   Off-Hour Fees Due   
  METHANE-Rough   03/28/2016   Not Ready for Inspection   JAMES POWERS
  METHANE-Rough   03/28/2016   Off-Hour Fees Due   
  Reinforced Concrete Frame   03/28/2016   Off-Hour Fees Due   
  Reinforced Concrete Frame   03/28/2016   Partial Approval   JAMES POWERS
  Verify Sprinkler Sign Off   03/28/2016   Not Ready for Inspection   JAMES POWERS
  Verify Sprinkler Sign Off   03/28/2016   Off-Hour Fees Due   
  Deputy Pre-Stress Concrete   03/29/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   03/29/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   03/30/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   03/30/2016   Partial Approval   JAMES POWERS
  METHANE-Rough   03/30/2016   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   03/30/2016   Partial Approval   JAMES POWERS
  Verify Sprinkler Sign Off   03/30/2016   Not Ready for Inspection   JAMES POWERS
  Deputy Pre-Stress Concrete   03/31/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   03/31/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   04/01/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   04/01/2016   Partial Approval   JAMES POWERS
  METHANE-Barrier   04/01/2016   Not Ready for Inspection   JAMES POWERS
  METHANE-Subgrade   04/01/2016   Not Ready for Inspection   JAMES POWERS
  Reinforced Concrete Frame   04/01/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   04/04/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   04/04/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   04/05/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   04/05/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   04/06/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   04/06/2016   Partial Approval   JAMES POWERS
  Floor/Roof Diaphrgm/Shear Wall   04/06/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   04/07/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   04/07/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   04/08/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   04/08/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   04/12/2016   No Access for Inspection   JAMES POWERS
  Deputy Reinf. Concrete   04/12/2016   No Access for Inspection   JAMES POWERS
  Deputy Pre-Stress Concrete   04/13/2016   No Access for Inspection   JAMES POWERS
  Deputy Reinf. Concrete   04/13/2016   No Access for Inspection   JAMES POWERS
  Deputy Pre-Stress Concrete   04/14/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   04/14/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   04/15/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   04/15/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   04/19/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   04/19/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   04/20/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   04/20/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   04/21/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   04/21/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   04/22/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   04/22/2016   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   04/22/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   04/25/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   04/25/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   04/26/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   04/26/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   04/27/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   04/27/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   04/28/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   04/28/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   04/29/2016   Approved   MICHAEL KUHN
  Deputy Reinf. Concrete   04/29/2016   Approved   MICHAEL KUHN
  Floor/Roof Diaphrgm/Shear Wall   04/29/2016   Partial Approval   MICHAEL KUHN
  Footing/Foundation/Slab   04/29/2016   Partial Approval   MICHAEL KUHN
  METHANE-Barrier   04/29/2016   Partial Approval   MICHAEL KUHN
  METHANE-Subgrade   04/29/2016   Partial Approval   MICHAEL KUHN
  Deputy Pre-Stress Concrete   05/02/2016   Partial Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   05/02/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   05/02/2016   Partial Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   05/03/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   05/03/2016   Partial Approval   JAMES POWERS
  Deputy Shotcrete   05/03/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   05/04/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   05/04/2016   Partial Approval   JAMES POWERS
  Deputy Shotcrete   05/04/2016   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   05/04/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   05/05/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   05/05/2016   Partial Approval   JAMES POWERS
  Deputy Shotcrete   05/05/2016   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   05/05/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   05/06/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   05/06/2016   Partial Approval   JAMES POWERS
  Deputy Shotcrete   05/06/2016   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   05/06/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   05/09/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   05/09/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   05/10/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   05/10/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   05/11/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   05/11/2016   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   05/11/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   05/12/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   05/12/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   05/13/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   05/13/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   05/16/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   05/16/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   05/17/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   05/17/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   05/18/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   05/18/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   05/19/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   05/19/2016   Conditional Approval   LESLIE TRUJILLO
  Floor/Roof Diaphrgm/Shear Wall   05/19/2016   Partial Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   05/20/2016   Approved   MICHAEL KUHN
  Deputy Reinf. Concrete   05/20/2016   Approved   MICHAEL KUHN
  Deputy Pre-Stress Concrete   05/23/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   05/23/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   05/24/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   05/24/2016   Partial Approval   JAMES POWERS
  Footing/Foundation/Slab   05/24/2016   Not Ready for Inspection   JAMES POWERS
  METHANE-Barrier   05/24/2016   Partial Approval   JAMES POWERS
  METHANE-Subgrade   05/24/2016   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   05/24/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   05/25/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   05/25/2016   Partial Approval   JAMES POWERS
  Footing/Foundation/Slab   05/25/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   05/26/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   05/26/2016   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   05/26/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   05/27/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   05/27/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   05/31/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   05/31/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   06/01/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   06/01/2016   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   06/01/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   06/02/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   06/02/2016   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   06/02/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   06/03/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   06/03/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   06/06/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   06/06/2016   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   06/06/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   06/07/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   06/07/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   06/08/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   06/08/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   06/09/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   06/09/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   06/10/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   06/10/2016   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   06/10/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   06/13/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   06/13/2016   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   06/13/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   06/14/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   06/14/2016   Partial Approval   JAMES POWERS
  Floor/Roof Diaphrgm/Shear Wall   06/14/2016   Not Ready for Inspection   JAMES POWERS
  Deputy Pre-Stress Concrete   06/15/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   06/15/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   06/16/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   06/16/2016   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   06/16/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   06/17/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   06/17/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   06/20/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   06/20/2016   Partial Approval   JAMES POWERS
  Deputy Shotcrete   06/20/2016   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   06/20/2016   Not Ready for Inspection   JAMES POWERS
  Deputy Pre-Stress Concrete   06/21/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   06/21/2016   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   06/21/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   06/22/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   06/22/2016   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   06/22/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   06/23/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   06/23/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   06/24/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   06/24/2016   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   06/24/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   06/27/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   06/27/2016   Partial Approval   JAMES POWERS
  METHANE-Rough   06/27/2016   Not Ready for Inspection   JAMES POWERS
  Reinforced Concrete Frame   06/27/2016   Partial Approval   JAMES POWERS
  Verify Sprinkler Sign Off   06/27/2016   Not Ready for Inspection   JAMES POWERS
  Deputy Pre-Stress Concrete   06/28/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   06/28/2016   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   06/28/2016   Not Ready for Inspection   JAMES POWERS
  Deputy Pre-Stress Concrete   06/29/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   06/29/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   06/29/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   06/30/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   06/30/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   07/01/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   07/01/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   07/05/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   07/05/2016   Partial Approval   JAMES POWERS
  Deputy Shotcrete   07/05/2016   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   07/05/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   07/06/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   07/06/2016   Partial Approval   JAMES POWERS
  Deputy Shotcrete   07/06/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   07/07/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   07/07/2016   Partial Approval   JAMES POWERS
  Deputy Shotcrete   07/07/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   07/08/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   07/08/2016   Partial Approval   JAMES POWERS
  Deputy Shotcrete   07/08/2016   Partial Approval   JAMES POWERS
  Pre-Inspection   07/11/2016   Not Ready for Inspection   JAMES POWERS
  Deputy Pre-Stress Concrete   07/12/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   07/12/2016   Partial Approval   JAMES POWERS
  Deputy Shotcrete   07/12/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   07/13/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   07/13/2016   Partial Approval   JAMES POWERS
  Floor/Roof Diaphrgm/Shear Wall   07/13/2016   Not Ready for Inspection   JAMES POWERS
  Deputy Pre-Stress Concrete   07/14/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   07/14/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   07/15/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   07/15/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   07/18/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   07/18/2016   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   07/18/2016   Not Ready for Inspection   JAMES POWERS
  Deputy Pre-Stress Concrete   07/19/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   07/19/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   07/20/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   07/20/2016   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   07/20/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   07/21/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   07/21/2016   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   07/21/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   07/22/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   07/22/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   07/25/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   07/25/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   07/26/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   07/26/2016   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   07/26/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   07/27/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   07/27/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   07/28/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   07/28/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   07/29/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   07/29/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   08/01/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   08/01/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   08/02/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   08/02/2016   Partial Approval   JAMES POWERS
  Floor/Roof Diaphrgm/Shear Wall   08/02/2016   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   08/02/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   08/03/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   08/03/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   08/04/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   08/04/2016   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   08/04/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   08/05/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   08/05/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   08/08/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   08/08/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   08/09/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   08/09/2016   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   08/09/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   08/10/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   08/10/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   08/11/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   08/11/2016   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   08/11/2016   Not Ready for Inspection   JAMES POWERS
  Deputy Pre-Stress Concrete   08/12/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   08/12/2016   Partial Approval   JAMES POWERS
  Floor/Roof Diaphrgm/Shear Wall   08/12/2016   Not Ready for Inspection   JAMES POWERS
  Floor/Roof Diaphrgm/Shear Wall   08/12/2016   Off-Hour Fees Due   
  Deputy Pre-Stress Concrete   08/15/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   08/15/2016   Partial Approval   JAMES POWERS
  Floor/Roof Diaphrgm/Shear Wall   08/15/2016   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   08/15/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   08/16/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   08/16/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   08/17/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   08/17/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   08/18/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   08/18/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   08/19/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   08/19/2016   Partial Approval   JAMES POWERS
  Excavation/Setback/Form/Re-Bar   08/19/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   08/22/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   08/22/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   08/23/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   08/23/2016   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   08/23/2016   Not Ready for Inspection   JAMES POWERS
  Deputy Pre-Stress Concrete   08/24/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   08/24/2016   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   08/24/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   08/25/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   08/25/2016   Partial Approval   JAMES POWERS
  Floor/Roof Diaphrgm/Shear Wall   08/25/2016   Not Ready for Inspection   JAMES POWERS
  Floor/Roof Diaphrgm/Shear Wall   08/25/2016   Partial Approval   JAMES POWERS
  METHANE-Rough   08/25/2016   Not Ready for Inspection   JAMES POWERS
  Verify Sprinkler Sign Off   08/25/2016   Not Ready for Inspection   JAMES POWERS
  Deputy Pre-Stress Concrete   08/26/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   08/26/2016   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   08/26/2016   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   08/29/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   08/29/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   08/29/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   08/29/2016   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   08/30/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   08/30/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   08/30/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   08/30/2016   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   08/31/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   08/31/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   08/31/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   08/31/2016   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   09/01/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   09/01/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   09/01/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   09/01/2016   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   09/01/2016   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   09/02/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   09/02/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   09/02/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   09/02/2016   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   09/06/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   09/06/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   09/06/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   09/06/2016   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   09/07/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   09/07/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   09/07/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   09/07/2016   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   09/07/2016   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   09/08/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   09/08/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   09/08/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   09/08/2016   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   09/09/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   09/09/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   09/09/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   09/09/2016   Conditional Approval   LESLIE TRUJILLO
  Floor/Roof Diaphrgm/Shear Wall   09/09/2016   Not Ready for Inspection   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   09/12/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   09/12/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   09/12/2016   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   09/12/2016   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   09/13/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   09/13/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   09/13/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   09/13/2016   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   09/13/2016   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   09/14/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   09/14/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   09/14/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   09/14/2016   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   09/15/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   09/15/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   09/15/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   09/15/2016   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   09/16/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   09/16/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   09/16/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   09/16/2016   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   09/16/2016   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   09/19/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   09/19/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   09/19/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   09/19/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   09/19/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   09/19/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   09/19/2016   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   09/20/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   09/20/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   09/20/2016   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   09/21/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   09/21/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   09/21/2016   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   09/22/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   09/22/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   09/22/2016   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   09/23/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   09/23/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   09/23/2016   Partial Approval   JAMES POWERS
  Floor/Roof Diaphrgm/Shear Wall   09/23/2016   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   09/26/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   09/26/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   09/26/2016   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   09/27/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   09/27/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   09/27/2016   Partial Approval   JAMES POWERS
  Insulation   09/27/2016   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   09/27/2016   Not Ready for Inspection   JAMES POWERS
  Deputy Drilled-In Anchors   09/28/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   09/28/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   09/28/2016   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   09/28/2016   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   09/29/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   09/29/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   09/29/2016   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   09/29/2016   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   09/30/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   09/30/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   09/30/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   10/03/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   10/03/2016   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   10/04/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   10/04/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   10/04/2016   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   10/05/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   10/05/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   10/05/2016   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   10/06/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   10/06/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   10/06/2016   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   10/07/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   10/07/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   10/07/2016   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   10/11/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   10/11/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   10/11/2016   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   10/11/2016   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   10/12/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   10/12/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   10/12/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   10/12/2016   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   10/12/2016   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   10/13/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   10/13/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   10/13/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   10/13/2016   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   10/14/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   10/14/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   10/14/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   10/14/2016   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   10/14/2016   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   10/17/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   10/17/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   10/17/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   10/17/2016   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   10/17/2016   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   10/18/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   10/18/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   10/18/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   10/18/2016   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   10/19/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   10/19/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   10/19/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   10/19/2016   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   10/19/2016   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   10/20/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   10/20/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   10/20/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   10/20/2016   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   10/21/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   10/21/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   10/21/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   10/21/2016   Partial Approval   JAMES POWERS
  Floor/Roof Diaphrgm/Shear Wall   10/21/2016   Not Ready for Inspection   JAMES POWERS
  Deputy Drilled-In Anchors   10/24/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   10/24/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   10/24/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   10/24/2016   Partial Approval   JAMES POWERS
  Floor/Roof Diaphrgm/Shear Wall   10/24/2016   Off-Hour Fees Due   
  Piling/Pier/Caisson   10/24/2016   Not Ready for Inspection   JAMES POWERS
  Deputy Drilled-In Anchors   10/25/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   10/25/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   10/25/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   10/25/2016   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   10/25/2016   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   10/25/2016   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   10/26/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   10/26/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   10/26/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   10/26/2016   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   10/26/2016   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   10/27/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   10/27/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   10/27/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   10/27/2016   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   10/27/2016   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   10/28/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   10/28/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   10/28/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   10/28/2016   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   10/28/2016   Partial Approval   JAMES POWERS
  Floor/Roof Diaphrgm/Shear Wall   10/28/2016   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   10/31/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   10/31/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   10/31/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   10/31/2016   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   10/31/2016   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   10/31/2016   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   11/01/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   11/01/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   11/01/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   11/01/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   11/01/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   11/02/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   11/02/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   11/02/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   11/02/2016   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   11/02/2016   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   11/02/2016   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   11/03/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   11/03/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   11/03/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   11/03/2016   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   11/03/2016   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   11/04/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   11/04/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   11/04/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   11/04/2016   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   11/04/2016   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   11/07/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   11/07/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   11/07/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   11/07/2016   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   11/07/2016   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   11/07/2016   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   11/08/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   11/08/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   11/08/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   11/08/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   11/08/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   11/09/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   11/09/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   11/09/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   11/09/2016   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   11/09/2016   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   11/09/2016   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   11/10/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   11/10/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   11/10/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   11/10/2016   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   11/10/2016   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   11/10/2016   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   11/14/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   11/14/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   11/14/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   11/14/2016   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   11/14/2016   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   11/14/2016   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   11/15/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   11/15/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   11/15/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   11/15/2016   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   11/15/2016   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   11/16/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   11/16/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   11/16/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   11/16/2016   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   11/16/2016   Partial Approval   JAMES POWERS
  Floor/Roof Diaphrgm/Shear Wall   11/16/2016   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   11/17/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   11/17/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   11/17/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   11/17/2016   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   11/17/2016   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   11/18/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   11/18/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   11/18/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   11/18/2016   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   11/18/2016   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   11/21/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   11/21/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   11/21/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   11/21/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   11/21/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   11/22/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   11/22/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   11/22/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   11/22/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   11/22/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   11/23/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   11/23/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   11/23/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   11/23/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   11/23/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   11/28/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   11/28/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   11/28/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   11/28/2016   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   11/28/2016   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   11/28/2016   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   11/29/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   11/29/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   11/29/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   11/29/2016   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   11/29/2016   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   11/29/2016   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   11/30/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   11/30/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   11/30/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   11/30/2016   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   11/30/2016   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   12/01/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   12/01/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   12/01/2016   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   12/01/2016   Partial Approval   JAMES POWERS
  Structural Steel Frame   12/01/2016   Not Ready for Inspection   JAMES POWERS
  Deputy Drilled-In Anchors   12/02/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   12/02/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   12/02/2016   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   12/05/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   12/05/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   12/05/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   12/05/2016   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   12/05/2016   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   12/06/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   12/06/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   12/06/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   12/06/2016   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   12/06/2016   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   12/06/2016   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   12/07/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   12/07/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   12/07/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   12/07/2016   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   12/07/2016   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   12/08/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   12/08/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   12/08/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   12/08/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   12/08/2016   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   12/09/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   12/09/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   12/09/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   12/09/2016   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   12/09/2016   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   12/09/2016   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   12/12/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   12/12/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   12/12/2016   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   12/12/2016   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   12/13/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   12/13/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   12/13/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   12/13/2016   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   12/13/2016   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   12/14/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   12/14/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   12/14/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   12/14/2016   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   12/14/2016   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   12/14/2016   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   12/15/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   12/15/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   12/15/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   12/15/2016   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   12/15/2016   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   12/16/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   12/16/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   12/16/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   12/16/2016   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   12/16/2016   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   12/19/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   12/19/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   12/19/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   12/19/2016   Partial Approval   JAMES POWERS
  Deputy Shotcrete   12/19/2016   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   12/19/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   12/20/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   12/20/2016   Partial Approval   JAMES POWERS
  Deputy Shotcrete   12/20/2016   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   12/20/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   12/21/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   12/21/2016   Partial Approval   JAMES POWERS
  Deputy Shotcrete   12/21/2016   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   12/21/2016   Not Ready for Inspection   JAMES POWERS
  Deputy Pre-Stress Concrete   12/22/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   12/22/2016   Partial Approval   JAMES POWERS
  Deputy Shotcrete   12/22/2016   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   12/22/2016   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   12/23/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   12/23/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   12/23/2016   Partial Approval   JAMES POWERS
  Deputy Shotcrete   12/23/2016   Partial Approval   JAMES POWERS
  Floor/Roof Diaphrgm/Shear Wall   12/23/2016   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   12/27/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   12/27/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   12/27/2016   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   12/28/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   12/28/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   12/28/2016   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   12/28/2016   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   12/29/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   12/29/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   12/29/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   12/29/2016   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   12/29/2016   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   12/30/2016   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   12/30/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   12/30/2016   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   12/30/2016   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   12/30/2016   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   01/03/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   01/03/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   01/03/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   01/03/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   01/03/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   01/04/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   01/04/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   01/04/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   01/04/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   01/04/2017   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   01/04/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   01/05/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   01/05/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   01/05/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   01/05/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   01/05/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   01/06/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   01/06/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   01/06/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   01/09/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   01/09/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   01/09/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   01/10/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   01/10/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   01/10/2017   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   01/10/2017   Not Ready for Inspection   JAMES POWERS
  Deputy Drilled-In Anchors   01/11/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   01/11/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   01/11/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   01/11/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   01/11/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   01/12/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   01/12/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   01/12/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   01/12/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   01/12/2017   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   01/12/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   01/13/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   01/13/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   01/13/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   01/13/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   01/13/2017   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   01/13/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   01/17/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   01/17/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   01/17/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   01/17/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   01/17/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   01/18/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   01/18/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   01/18/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   01/18/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   01/18/2017   Partial Approval   JAMES POWERS
  Light Gage Steel Frame   01/18/2017   Partial Approval   JAMES POWERS
  Reinforced Masonry Frame   01/18/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   01/19/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   01/19/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   01/19/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   01/19/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   01/19/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   01/20/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   01/20/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   01/20/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   01/20/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   01/20/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   01/23/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   01/23/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   01/23/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   01/23/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   01/23/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   01/24/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   01/24/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   01/24/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   01/24/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   01/24/2017   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   01/24/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   01/25/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   01/25/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   01/25/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   01/25/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   01/25/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   01/26/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   01/26/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   01/26/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   01/26/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   01/26/2017   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   01/26/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   01/27/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   01/27/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   01/27/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   01/27/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   01/27/2017   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   01/27/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   01/30/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   01/30/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   01/30/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   01/30/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   01/31/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   01/31/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   01/31/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   02/01/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   02/01/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   02/01/2017   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   02/01/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   02/02/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   02/02/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   02/02/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   02/03/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   02/03/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   02/03/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   02/06/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   02/06/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   02/06/2017   Partial Approval   JAMES POWERS
  Insulation   02/06/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   02/07/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   02/07/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   02/07/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   02/07/2017   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   02/07/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   02/08/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   02/08/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   02/08/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   02/08/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   02/09/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   02/09/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   02/09/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   02/09/2017   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   02/09/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   02/10/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   02/10/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   02/10/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   02/10/2017   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   02/10/2017   Not Ready for Inspection   JAMES POWERS
  Deputy Drilled-In Anchors   02/13/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   02/13/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   02/13/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   02/13/2017   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   02/13/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   02/14/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   02/14/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   02/14/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   02/15/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   02/15/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   02/15/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   02/15/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   02/15/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   02/16/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   02/16/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   02/16/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   02/16/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   02/16/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   02/17/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   02/17/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   02/17/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   02/17/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   02/17/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   02/21/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   02/21/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   02/21/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   02/21/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   02/22/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   02/22/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   02/22/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   02/22/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   02/22/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   02/23/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   02/23/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   02/23/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   02/23/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   02/23/2017   Partial Approval   JAMES POWERS
  Drywall Nailing   02/23/2017   Partial Approval   JAMES POWERS
  Light Gage Steel Frame   02/23/2017   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   02/23/2017   Partial Approval   JAMES POWERS
  SWPPP-Const. Storm Water   02/23/2017   Completed   JAMES POWERS
  Deputy Drilled-In Anchors   02/24/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   02/24/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   02/24/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   02/24/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   02/24/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   02/27/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   02/27/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   02/27/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   02/27/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   02/27/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   02/28/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   02/28/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   02/28/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   02/28/2017   Conditional Approval   KATY RAMIREZ
  Deputy Steel/Welding   02/28/2017   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   02/28/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   03/01/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   03/01/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   03/01/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   03/01/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   03/02/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   03/02/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   03/02/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   03/02/2017   Partial Approval   JAMES POWERS
  Insulation   03/02/2017   Partial Approval   JAMES POWERS
  Light Gage Steel Frame   03/02/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   03/03/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   03/03/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   03/03/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   03/03/2017   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   03/03/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   03/06/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   03/06/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   03/06/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   03/06/2017   Partial Approval   JAMES POWERS
  Insulation   03/06/2017   Partial Approval   JAMES POWERS
  Light Gage Steel Frame   03/06/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   03/07/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   03/07/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   03/07/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   03/07/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   03/08/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   03/08/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   03/08/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   03/08/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   03/09/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   03/09/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   03/09/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   03/09/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   03/10/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   03/10/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   03/10/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   03/10/2017   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   03/10/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   03/13/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   03/13/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   03/13/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   03/13/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   03/13/2017   Partial Approval   JAMES POWERS
  Insulation   03/13/2017   Partial Approval   JAMES POWERS
  Light Gage Steel Frame   03/13/2017   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   03/13/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   03/14/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   03/14/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   03/14/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   03/14/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   03/14/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   03/15/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   03/15/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   03/15/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   03/15/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   03/15/2017   Partial Approval   JAMES POWERS
  Insulation   03/15/2017   Partial Approval   JAMES POWERS
  Light Gage Steel Frame   03/15/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   03/16/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   03/16/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   03/16/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   03/16/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   03/16/2017   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   03/16/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   03/17/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   03/17/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   03/17/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   03/17/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   03/17/2017   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   03/17/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   03/20/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   03/20/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   03/20/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   03/20/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   03/20/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   03/21/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   03/21/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   03/21/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   03/21/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   03/21/2017   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   03/21/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   03/22/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   03/22/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   03/22/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   03/22/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   03/22/2017   Partial Approval   JAMES POWERS
  Drywall Nailing   03/22/2017   Not Ready for Inspection   JAMES POWERS
  Insulation   03/22/2017   Partial Approval   JAMES POWERS
  Light Gage Steel Frame   03/22/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   03/23/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   03/23/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   03/23/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   03/23/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   03/23/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   03/24/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   03/24/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   03/24/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   03/24/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   03/24/2017   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   03/24/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   03/28/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   03/28/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   03/28/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   03/28/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   03/29/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   03/29/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   03/29/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   03/29/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   03/29/2017   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   03/29/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   03/30/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   03/30/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   03/30/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   03/30/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   03/30/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   03/31/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   03/31/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   03/31/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   03/31/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   03/31/2017   Partial Approval   JAMES POWERS
  Drywall Nailing   03/31/2017   Not Ready for Inspection   JAMES POWERS
  Green Building Rough   03/31/2017   Not Ready for Inspection   JOHN KLARIN
  Insulation   03/31/2017   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   03/31/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   04/03/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   04/03/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   04/03/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   04/03/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   04/03/2017   Partial Approval   JAMES POWERS
  Green Building Final   04/03/2017   Partial Inspection   JOHN KLARIN
  Reinforced Concrete Frame   04/03/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   04/04/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   04/04/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   04/04/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   04/04/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   04/04/2017   Partial Approval   JAMES POWERS
  Drywall Nailing   04/04/2017   Partial Approval   JAMES POWERS
  Insulation   04/04/2017   Partial Approval   JAMES POWERS
  Light Gage Steel Frame   04/04/2017   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   04/04/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   04/05/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   04/05/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   04/05/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   04/05/2017   Partial Approval   JAMES POWERS
  Green Building Rough   04/05/2017   Partial Inspection   JOHN KLARIN
  Reinforced Concrete Frame   04/05/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   04/06/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   04/06/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   04/06/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   04/06/2017   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   04/06/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   04/07/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   04/07/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   04/07/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   04/07/2017   Partial Approval   JAMES POWERS
  Light Gage Steel Frame   04/07/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   04/10/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   04/10/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   04/10/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   04/11/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   04/11/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   04/11/2017   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   04/11/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   04/12/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   04/12/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   04/13/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   04/13/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   04/14/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   04/14/2017   Partial Approval   JAMES POWERS
  Drywall Nailing   04/14/2017   Partial Approval   JAMES POWERS
  Green Building Rough   04/14/2017   Not Ready for Inspection   DONALD CRICHLOW
  Insulation   04/14/2017   Partial Approval   JAMES POWERS
  Light Gage Steel Frame   04/14/2017   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   04/14/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   04/17/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   04/17/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   04/17/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   04/17/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   04/18/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   04/18/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   04/18/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   04/18/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   04/19/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   04/19/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   04/19/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   04/19/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   04/19/2017   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   04/19/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   04/20/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   04/20/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   04/20/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   04/20/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   04/20/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   04/21/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   04/21/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   04/21/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   04/21/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   04/21/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   04/24/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   04/24/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   04/24/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   04/24/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   04/24/2017   Conditional Approval   LESLIE TRUJILLO
  Floor/Roof Diaphrgm/Shear Wall   04/24/2017   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   04/25/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   04/25/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   04/25/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   04/25/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   04/25/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   04/26/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   04/26/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   04/26/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   04/26/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   04/26/2017   Conditional Approval   LESLIE TRUJILLO
  Light Gage Steel Frame   04/26/2017   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   04/27/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   04/27/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   04/27/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   04/27/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   04/27/2017   Conditional Approval   LESLIE TRUJILLO
  Drywall Nailing   04/27/2017   Partial Approval   LESLIE TRUJILLO
  Light Gage Steel Frame   04/27/2017   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   04/28/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   04/28/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   04/28/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   04/28/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   04/28/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   05/01/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   05/01/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   05/01/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   05/01/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   05/02/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   05/02/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   05/02/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   05/02/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   05/02/2017   Partial Approval   JAMES POWERS
  Drywall Nailing   05/02/2017   Partial Approval   JAMES POWERS
  Light Gage Steel Frame   05/02/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   05/03/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   05/03/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   05/03/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   05/03/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   05/03/2017   Partial Approval   JAMES POWERS
  Green Building Rough   05/03/2017   Partial Approval   RICHARD DOCKUS
  Insulation   05/03/2017   Partial Approval   JAMES POWERS
  Light Gage Steel Frame   05/03/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   05/04/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   05/04/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   05/04/2017   Partial Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   05/04/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   05/04/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   05/04/2017   Conditional Approval   LESLIE TRUJILLO
  Floor/Roof Diaphrgm/Shear Wall   05/04/2017   Partial Approval   LESLIE TRUJILLO
  Green Building Rough   05/04/2017   Partial Approval   RICHARD DOCKUS
  Deputy Drilled-In Anchors   05/05/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   05/05/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   05/05/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   05/05/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   05/05/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   05/08/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   05/08/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   05/08/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   05/08/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   05/08/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   05/09/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   05/09/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   05/09/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   05/09/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   05/09/2017   Partial Approval   JAMES POWERS
  Drywall Nailing   05/09/2017   Partial Approval   JAMES POWERS
  Light Gage Steel Frame   05/09/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   05/10/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   05/10/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   05/10/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   05/10/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   05/10/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   05/11/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   05/11/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   05/11/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   05/11/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   05/11/2017   Partial Approval   JAMES POWERS
  Drywall Nailing   05/11/2017   Partial Approval   JAMES POWERS
  Insulation   05/11/2017   Partial Approval   JAMES POWERS
  Light Gage Steel Frame   05/11/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   05/12/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   05/12/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   05/12/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   05/12/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   05/12/2017   Partial Approval   JAMES POWERS
  Green Building Rough   05/12/2017   Not Ready for Inspection   DONALD CRICHLOW
  Insulation   05/12/2017   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   05/12/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   05/15/2017   Partial Approval   JAMES POWERS
  Light Gage Steel Frame   05/15/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   05/16/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   05/16/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Seismic Resistance   05/16/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   05/17/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   05/17/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   05/17/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   05/17/2017   Partial Approval   JAMES POWERS
  Deputy Seismic Resistance   05/17/2017   Partial Approval   JAMES POWERS
  Floor/Roof Diaphrgm/Shear Wall   05/17/2017   Not Ready for Inspection   JAMES POWERS
  Insulation   05/17/2017   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   05/17/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   05/18/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   05/18/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   05/18/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   05/18/2017   Partial Approval   JAMES POWERS
  Deputy Seismic Resistance   05/18/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   05/19/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   05/19/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   05/19/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   05/19/2017   Partial Approval   JAMES POWERS
  Deputy Seismic Resistance   05/19/2017   Partial Approval   JAMES POWERS
  Insulation   05/19/2017   Partial Approval   JAMES POWERS
  Special/Order Compliance   05/19/2017   Not Ready for Inspection   JAMES POWERS
  Deputy Drilled-In Anchors   05/22/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   05/22/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   05/22/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   05/22/2017   Partial Approval   JAMES POWERS
  Deputy Seismic Resistance   05/22/2017   Partial Approval   JAMES POWERS
  Drywall Nailing   05/22/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   05/23/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   05/23/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   05/23/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   05/23/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   05/23/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   05/24/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   05/24/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   05/24/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   05/24/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   05/24/2017   Partial Approval   JAMES POWERS
  Drywall Nailing   05/24/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   05/25/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   05/25/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   05/25/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   05/25/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   05/25/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   05/26/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   05/26/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   05/26/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   05/26/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   05/26/2017   Partial Approval   JAMES POWERS
  Insulation   05/26/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   05/30/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   05/30/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   05/30/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   05/30/2017   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   05/30/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   05/31/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   05/31/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   05/31/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   05/31/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   06/01/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   06/01/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   06/01/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   06/01/2017   Partial Approval   JAMES POWERS
  Drywall Nailing   06/01/2017   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   06/01/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   06/02/2017   Conditional Approval   ERNESTO CORRAL
  Deputy Pre-Stress Concrete   06/02/2017   Conditional Approval   ERNESTO CORRAL
  Deputy Reinf. Concrete   06/02/2017   Conditional Approval   ERNESTO CORRAL
  Deputy Reinf. Masonry   06/02/2017   Conditional Approval   ERNESTO CORRAL
  Deputy Drilled-In Anchors   06/05/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   06/05/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   06/05/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   06/05/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   06/06/2017   Conditional Approval   ERNESTO CORRAL
  Deputy Pre-Stress Concrete   06/06/2017   Conditional Approval   ERNESTO CORRAL
  Deputy Reinf. Concrete   06/06/2017   Conditional Approval   ERNESTO CORRAL
  Deputy Reinf. Masonry   06/06/2017   Conditional Approval   ERNESTO CORRAL
  Deputy Steel/Welding   06/06/2017   Conditional Approval   ERNESTO CORRAL
  Drywall Nailing   06/06/2017   Partial Inspection   ERNESTO CORRAL
  Deputy Drilled-In Anchors   06/07/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   06/07/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   06/07/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   06/07/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   06/08/2017   Conditional Approval   ERNESTO CORRAL
  Deputy Pre-Stress Concrete   06/08/2017   Conditional Approval   ERNESTO CORRAL
  Deputy Reinf. Concrete   06/08/2017   Conditional Approval   ERNESTO CORRAL
  Deputy Steel/Welding   06/08/2017   Conditional Approval   ERNESTO CORRAL
  Drywall Nailing   06/08/2017   Partial Inspection   ERNESTO CORRAL
  Footing/Foundation/Slab   06/08/2017   Partial Inspection   ERNESTO CORRAL
  Insulation   06/08/2017   Partial Inspection   ERNESTO CORRAL
  Light Gage Steel Frame   06/08/2017   Partial Inspection   ERNESTO CORRAL
  Deputy Drilled-In Anchors   06/09/2017   Conditional Approval   ERNESTO CORRAL
  Deputy Pre-Stress Concrete   06/09/2017   Conditional Approval   ERNESTO CORRAL
  Deputy Reinf. Concrete   06/09/2017   Conditional Approval   ERNESTO CORRAL
  Deputy Reinf. Masonry   06/09/2017   Conditional Approval   ERNESTO CORRAL
  Deputy Steel/Welding   06/09/2017   Conditional Approval   ERNESTO CORRAL
  Floor/Roof Diaphrgm/Shear Wall   06/09/2017   No Access for Inspection   ERNESTO CORRAL
  Deputy Drilled-In Anchors   06/12/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   06/12/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   06/12/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   06/12/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   06/12/2017   Partial Approval   JAMES POWERS
  Insulation   06/12/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   06/13/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   06/13/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   06/13/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   06/13/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   06/13/2017   Partial Approval   JAMES POWERS
  Drywall Nailing   06/13/2017   Partial Approval   JAMES POWERS
  Light Gage Steel Frame   06/13/2017   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   06/13/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   06/14/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   06/14/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   06/14/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   06/14/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   06/14/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   06/15/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   06/15/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   06/15/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   06/15/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   06/15/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   06/16/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   06/16/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   06/16/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   06/16/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   06/16/2017   Partial Approval   JAMES POWERS
  Insulation   06/16/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   06/19/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   06/19/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   06/19/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   06/19/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   06/20/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   06/20/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   06/20/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   06/20/2017   Partial Approval   JAMES POWERS
  Drywall Nailing   06/20/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   06/21/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   06/21/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   06/21/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   06/21/2017   Partial Approval   JAMES POWERS
  Drywall Nailing   06/21/2017   Partial Approval   JAMES POWERS
  Green Building Rough   06/21/2017   Partial Approval   RICHARD DOCKUS
  Deputy Drilled-In Anchors   06/22/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   06/22/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   06/22/2017   Partial Approval   JAMES POWERS
  Green Building Final   06/22/2017   Partial Inspection   RICHARD DOCKUS
  Deputy Drilled-In Anchors   06/23/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   06/23/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   06/23/2017   Partial Approval   JAMES POWERS
  Drywall Nailing   06/23/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   06/26/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   06/26/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   06/26/2017   Partial Approval   JAMES POWERS
  Drywall Nailing   06/26/2017   Partial Approval   JAMES POWERS
  Green Building Rough   06/26/2017   Not Ready for Inspection   RICHARD DOCKUS
  Deputy Drilled-In Anchors   06/27/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   06/27/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   06/27/2017   Partial Approval   JAMES POWERS
  Insulation   06/27/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   06/28/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   06/28/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   06/28/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   06/29/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   06/29/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   06/29/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   06/30/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   06/30/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   06/30/2017   Partial Approval   JAMES POWERS
  Drywall Nailing   06/30/2017   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   06/30/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   07/03/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   07/03/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   07/03/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   07/05/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   07/05/2017   Partial Approval   JAMES POWERS
  Floor/Roof Diaphrgm/Shear Wall   07/05/2017   Not Ready for Inspection   JAMES POWERS
  Insulation   07/05/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   07/06/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   07/06/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   07/06/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   07/07/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   07/07/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   07/07/2017   Partial Approval   JAMES POWERS
  Insulation   07/07/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   07/10/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   07/10/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   07/10/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   07/11/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   07/11/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   07/11/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   07/11/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   07/12/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   07/12/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   07/12/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   07/12/2017   Partial Approval   JAMES POWERS
  Green Building Rough   07/12/2017   Partial Approval   RICHARD DOCKUS
  Insulation   07/12/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   07/13/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   07/13/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   07/13/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   07/13/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   07/14/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   07/14/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   07/14/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   07/14/2017   Partial Approval   JAMES POWERS
  Drywall Nailing   07/14/2017   Partial Approval   JAMES POWERS
  Floor/Roof Diaphrgm/Shear Wall   07/14/2017   Partial Approval   JAMES POWERS
  Green Building Rough   07/14/2017   Partial Approval   RICHARD DOCKUS
  Insulation   07/14/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   07/17/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   07/17/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   07/17/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   07/17/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   07/17/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   07/18/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   07/18/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   07/18/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   07/18/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   07/19/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   07/19/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   07/19/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   07/19/2017   Partial Approval   JAMES POWERS
  Drywall Nailing   07/19/2017   Partial Approval   JAMES POWERS
  Insulation   07/19/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   07/20/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   07/20/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   07/20/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   07/20/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   07/20/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   07/21/2017   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   07/21/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   07/21/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   07/21/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   07/21/2017   Partial Approval   JAMES POWERS
  Insulation   07/21/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   07/24/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   07/24/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   07/24/2017   Conditional Approval   LESLIE TRUJILLO
  Drywall Nailing   07/24/2017   No Access for Inspection   LESLIE TRUJILLO
  Green Building Rough   07/24/2017   Partial Approval   RICHARD DOCKUS
  Deputy Drilled-In Anchors   07/25/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   07/25/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   07/25/2017   Conditional Approval   LESLIE TRUJILLO
  Green Building Final   07/25/2017   Not Ready for Inspection   RICHARD DOCKUS
  Green Building Rough   07/25/2017   Partial Approval   RICHARD DOCKUS
  Insulation   07/25/2017   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   07/26/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   07/26/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   07/26/2017   Conditional Approval   LESLIE TRUJILLO
  Insulation   07/26/2017   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   07/27/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   07/27/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   07/27/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   07/28/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   07/28/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   07/28/2017   Conditional Approval   LESLIE TRUJILLO
  Insulation   07/28/2017   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   07/31/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   07/31/2017   Conditional Approval   LESLIE TRUJILLO
  Insulation   07/31/2017   Partial Approval   LESLIE TRUJILLO
  Interior/Exterior Lathing   07/31/2017   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   08/01/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   08/01/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   08/01/2017   Conditional Approval   LESLIE TRUJILLO
  Light Gage Steel Frame   08/01/2017   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   08/02/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   08/02/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   08/02/2017   Conditional Approval   LESLIE TRUJILLO
  Insulation   08/02/2017   Partial Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   08/03/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   08/03/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   08/04/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   08/04/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   08/07/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   08/07/2017   Partial Approval   JAMES POWERS
  Drywall Nailing   08/07/2017   Partial Approval   JAMES POWERS
  Green Building Rough   08/07/2017   Not Ready for Inspection   RICHARD DOCKUS
  Insulation   08/07/2017   Partial Approval   JAMES POWERS
  Interior/Exterior Lathing   08/07/2017   Not Ready for Inspection   JAMES POWERS
  Deputy Drilled-In Anchors   08/08/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   08/08/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   08/08/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   08/08/2017   Partial Approval   JAMES POWERS
  Light Gage Steel Frame   08/08/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   08/09/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   08/09/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   08/09/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   08/09/2017   Partial Approval   JAMES POWERS
  Green Building Rough   08/09/2017   Partial Approval   RICHARD DOCKUS
  Interior/Exterior Lathing   08/09/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   08/10/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   08/10/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   08/10/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   08/10/2017   Partial Approval   JAMES POWERS
  Green Building Final   08/10/2017   Not Ready for Inspection   RICHARD DOCKUS
  Green Building Rough   08/10/2017   Not Ready for Inspection   RICHARD DOCKUS
  Deputy Drilled-In Anchors   08/11/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   08/11/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   08/11/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   08/11/2017   Partial Approval   JAMES POWERS
  Drywall Nailing   08/11/2017   Partial Approval   JAMES POWERS
  Insulation   08/11/2017   Partial Approval   JAMES POWERS
  Light Gage Steel Frame   08/11/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   08/14/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   08/14/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   08/14/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   08/14/2017   Partial Approval   JAMES POWERS
  Green Building Rough   08/14/2017   Partial Approval   RICHARD DOCKUS
  Insulation   08/14/2017   Not Ready for Inspection   JAMES POWERS
  Light Gage Steel Frame   08/14/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   08/15/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   08/15/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   08/15/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   08/15/2017   Partial Approval   JAMES POWERS
  Insulation   08/15/2017   Partial Approval   JAMES POWERS
  Light Gage Steel Frame   08/15/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   08/16/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   08/16/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   08/16/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   08/16/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   08/17/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   08/17/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   08/17/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   08/17/2017   Partial Approval   JAMES POWERS
  Drywall Nailing   08/17/2017   Partial Approval   JAMES POWERS
  Insulation   08/17/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   08/18/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   08/18/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   08/18/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   08/18/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   08/21/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   08/21/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   08/21/2017   Partial Approval   JAMES POWERS
  Drywall Nailing   08/21/2017   Partial Approval   JAMES POWERS
  Green Building Rough   08/21/2017   Not Ready for Inspection   RICHARD DOCKUS
  Light Gage Steel Frame   08/21/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   08/22/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   08/22/2017   Partial Approval   JAMES POWERS
  Deputy Shotcrete   08/22/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   08/22/2017   Partial Approval   JAMES POWERS
  Drywall Nailing   08/22/2017   Partial Approval   JAMES POWERS
  Insulation   08/22/2017   Partial Approval   JAMES POWERS
  Light Gage Steel Frame   08/22/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   08/23/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   08/23/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   08/23/2017   Partial Approval   JAMES POWERS
  Deputy Shotcrete   08/23/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   08/23/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   08/24/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   08/24/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   08/24/2017   Partial Approval   JAMES POWERS
  Deputy Shotcrete   08/24/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   08/24/2017   Partial Approval   JAMES POWERS
  Green Building Rough   08/24/2017   Partial Approval   RICHARD DOCKUS
  Insulation   08/24/2017   Partial Approval   JAMES POWERS
  Light Gage Steel Frame   08/24/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   08/25/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   08/25/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   08/25/2017   Partial Approval   JAMES POWERS
  Deputy Shotcrete   08/25/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   08/25/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   08/28/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   08/28/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   08/28/2017   Partial Approval   JAMES POWERS
  Deputy Shotcrete   08/28/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   08/28/2017   Partial Approval   JAMES POWERS
  Drywall Nailing   08/28/2017   Partial Approval   JAMES POWERS
  Insulation   08/28/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   08/29/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   08/29/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   08/29/2017   Partial Approval   JAMES POWERS
  Deputy Shotcrete   08/29/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   08/29/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   08/30/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   08/30/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   08/30/2017   Partial Approval   JAMES POWERS
  Deputy Shotcrete   08/30/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   08/30/2017   Partial Approval   JAMES POWERS
  Drywall Nailing   08/30/2017   Partial Approval   JAMES POWERS
  Insulation   08/30/2017   Partial Approval   JAMES POWERS
  Light Gage Steel Frame   08/30/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   08/31/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   08/31/2017   Partial Approval   JAMES POWERS
  Deputy Shotcrete   08/31/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   08/31/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   09/01/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   09/01/2017   Partial Approval   JAMES POWERS
  Deputy Shotcrete   09/01/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   09/01/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   09/05/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   09/05/2017   Partial Approval   JAMES POWERS
  Deputy Shotcrete   09/05/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   09/05/2017   Partial Approval   JAMES POWERS
  Green Building Rough   09/05/2017   No Access for Inspection   WILLIAM ROSE
  Deputy Drilled-In Anchors   09/06/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   09/06/2017   Partial Approval   JAMES POWERS
  Drywall Nailing   09/06/2017   Partial Approval   JAMES POWERS
  Green Building Rough   09/06/2017   Partial Approval   WILLIAM ROSE
  Insulation   09/06/2017   Partial Approval   JAMES POWERS
  Light Gage Steel Frame   09/06/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   09/07/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   09/07/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   09/08/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   09/08/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   09/08/2017   Partial Approval   JAMES POWERS
  Insulation   09/08/2017   Partial Approval   JAMES POWERS
  Light Gage Steel Frame   09/08/2017   Not Ready for Inspection   JAMES POWERS
  Deputy Drilled-In Anchors   09/11/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   09/11/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   09/11/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   09/12/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   09/12/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   09/12/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   09/12/2017   Partial Approval   JAMES POWERS
  Drywall Nailing   09/12/2017   Partial Approval   JAMES POWERS
  Structural Steel Frame   09/12/2017   Not Ready for Inspection   JAMES POWERS
  Deputy Drilled-In Anchors   09/13/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   09/13/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   09/13/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   09/13/2017   Partial Approval   JAMES POWERS
  Insulation   09/13/2017   Partial Approval   JAMES POWERS
  Light Gage Steel Frame   09/13/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   09/14/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   09/14/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   09/14/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   09/14/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   09/15/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   09/15/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   09/15/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   09/15/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   09/18/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   09/18/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   09/18/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   09/18/2017   Partial Approval   JAMES POWERS
  Drywall Nailing   09/18/2017   Partial Approval   JAMES POWERS
  Light Gage Steel Frame   09/18/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   09/19/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   09/19/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   09/19/2017   Partial Approval   JAMES POWERS
  Deputy Shotcrete   09/19/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   09/19/2017   Partial Approval   JAMES POWERS
  Green Building Rough   09/19/2017   Partial Approval   RICHARD DOCKUS
  Insulation   09/19/2017   Conditional Approval   JAMES POWERS
  Deputy Drilled-In Anchors   09/20/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   09/20/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   09/20/2017   Partial Approval   JAMES POWERS
  Deputy Shotcrete   09/20/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   09/20/2017   Partial Approval   JAMES POWERS
  Light Gage Steel Frame   09/20/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   09/21/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   09/21/2017   Partial Approval   JAMES POWERS
  Deputy Shotcrete   09/21/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   09/21/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   09/22/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   09/22/2017   Partial Approval   JAMES POWERS
  Deputy Shotcrete   09/22/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   09/22/2017   Partial Approval   JAMES POWERS
  Drywall Nailing   09/22/2017   Partial Approval   JAMES POWERS
  Insulation   09/22/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   09/25/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   09/25/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   09/25/2017   Partial Approval   JAMES POWERS
  Deputy Shotcrete   09/25/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   09/25/2017   Partial Approval   JAMES POWERS
  Drywall Nailing   09/25/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   09/26/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   09/26/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   09/26/2017   Partial Approval   JAMES POWERS
  Deputy Shotcrete   09/26/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   09/27/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   09/27/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   09/27/2017   Partial Approval   JAMES POWERS
  Deputy Shotcrete   09/27/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   09/27/2017   Partial Approval   JAMES POWERS
  Drywall Nailing   09/27/2017   Partial Approval   JAMES POWERS
  Interior/Exterior Lathing   09/27/2017   Not Ready for Inspection   JAMES POWERS
  Light Gage Steel Frame   09/27/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   09/28/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   09/28/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   09/28/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   09/29/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   09/29/2017   Partial Approval   JAMES POWERS
  Deputy Shotcrete   09/29/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   09/29/2017   Partial Approval   JAMES POWERS
  Drywall Nailing   09/29/2017   Partial Approval   JAMES POWERS
  Interior/Exterior Lathing   09/29/2017   Not Ready for Inspection   JAMES POWERS
  Deputy Drilled-In Anchors   10/02/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   10/02/2017   Partial Approval   JAMES POWERS
  Deputy Shotcrete   10/02/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   10/02/2017   Partial Approval   JAMES POWERS
  Drywall Nailing   10/02/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   10/03/2017   Partial Approval   JAMES POWERS
  Light Gage Steel Frame   10/03/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   10/04/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   10/04/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   10/04/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   10/04/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   10/05/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   10/05/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   10/05/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   10/05/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   10/06/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   10/06/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   10/06/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   10/06/2017   Partial Approval   JAMES POWERS
  Drywall Nailing   10/06/2017   Partial Approval   JAMES POWERS
  Interior/Exterior Lathing   10/06/2017   Partial Approval   JAMES POWERS
  SWPPP-Const. Storm Water   10/06/2017   Completed   JAMES POWERS
  Deputy Drilled-In Anchors   10/10/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   10/10/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   10/10/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   10/10/2017   Partial Approval   JAMES POWERS
  Drywall Nailing   10/10/2017   Partial Approval   JAMES POWERS
  Light Gage Steel Frame   10/10/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   10/11/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   10/11/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   10/11/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   10/11/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   10/12/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   10/12/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   10/12/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   10/12/2017   Partial Approval   JAMES POWERS
  Drywall Nailing   10/12/2017   Partial Approval   JAMES POWERS
  Interior/Exterior Lathing   10/12/2017   Not Ready for Inspection   JAMES POWERS
  Light Gage Steel Frame   10/12/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   10/13/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   10/13/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   10/13/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   10/13/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   10/16/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   10/16/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   10/16/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   10/16/2017   Partial Approval   JAMES POWERS
  Drywall Nailing   10/16/2017   Partial Approval   JAMES POWERS
  Green Building Rough   10/16/2017   Not Ready for Inspection   RICHARD DOCKUS
  Deputy Drilled-In Anchors   10/17/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   10/17/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   10/17/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   10/17/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   10/18/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   10/18/2017   Partial Approval   JAMES POWERS
  Drywall Nailing   10/18/2017   Partial Approval   JAMES POWERS
  Insulation   10/18/2017   Not Ready for Inspection   JAMES POWERS
  Light Gage Steel Frame   10/18/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   10/19/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   10/19/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   10/19/2017   Partial Approval   JAMES POWERS
  Drywall Nailing   10/19/2017   Partial Approval   JAMES POWERS
  Insulation   10/19/2017   Partial Approval   JAMES POWERS
  Light Gage Steel Frame   10/19/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   10/20/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   10/20/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   10/20/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   10/23/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   10/23/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   10/23/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   10/23/2017   Partial Approval   JAMES POWERS
  Drywall Nailing   10/23/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   10/24/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   10/24/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   10/24/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   10/24/2017   Partial Approval   JAMES POWERS
  Insulation   10/24/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   10/25/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   10/25/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   10/25/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   10/25/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   10/26/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   10/26/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   10/26/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   10/26/2017   Partial Approval   JAMES POWERS
  Drywall Nailing   10/26/2017   Partial Approval   JAMES POWERS
  Green Building Rough   10/26/2017   Not Ready for Inspection   DONALD CRICHLOW
  Deputy Drilled-In Anchors   10/27/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   10/27/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   10/27/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   10/27/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   10/30/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   10/30/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   10/30/2017   Partial Approval   JAMES POWERS
  Drywall Nailing   10/30/2017   Partial Approval   JAMES POWERS
  Insulation   10/30/2017   Partial Approval   JAMES POWERS
  Light Gage Steel Frame   10/30/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   10/31/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   10/31/2017   Partial Approval   JAMES POWERS
  Insulation   10/31/2017   Partial Approval   JAMES POWERS
  Light Gage Steel Frame   10/31/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   11/01/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   11/01/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   11/01/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   11/02/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   11/02/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   11/02/2017   Partial Approval   JAMES POWERS
  Drywall Nailing   11/02/2017   Partial Approval   JAMES POWERS
  Green Building Rough   11/02/2017   Not Ready for Inspection   JAMES POWERS
  Light Gage Steel Frame   11/02/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   11/03/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   11/03/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   11/03/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   11/06/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   11/06/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   11/06/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   11/06/2017   Partial Approval   JAMES POWERS
  Drywall Nailing   11/06/2017   Partial Approval   JAMES POWERS
  Green Building Rough   11/06/2017   Approved   JAMES POWERS
  Deputy Drilled-In Anchors   11/07/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   11/07/2017   Approved   JAMES POWERS
  Deputy Reinf. Masonry   11/07/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   11/07/2017   Partial Approval   JAMES POWERS
  Light Gage Steel Frame   11/07/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   11/08/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   11/08/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   11/08/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   11/09/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   11/09/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   11/09/2017   Partial Approval   JAMES POWERS
  Drywall Nailing   11/09/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   11/13/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   11/13/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   11/13/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   11/14/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   11/14/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   11/14/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   11/14/2017   Partial Approval   JAMES POWERS
  Drywall Nailing   11/14/2017   Not Ready for Inspection   JAMES POWERS
  Deputy Drilled-In Anchors   11/15/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   11/15/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   11/15/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   11/15/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   11/16/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   11/16/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   11/16/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   11/16/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   11/17/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   11/17/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   11/17/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   11/17/2017   Partial Approval   JAMES POWERS
  Light Gage Steel Frame   11/17/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   11/20/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   11/20/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   11/20/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   11/20/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   11/21/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   11/21/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   11/22/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   11/22/2017   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   11/27/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   11/27/2017   Partial Approval   JAMES POWERS
  Light Gage Steel Frame   11/27/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   11/28/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   11/28/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   11/28/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   11/29/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   11/29/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   11/29/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   11/30/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   11/30/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   11/30/2017   Partial Approval   JAMES POWERS
  Drywall Nailing   11/30/2017   Partial Approval   JAMES POWERS
  Light Gage Steel Frame   11/30/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   12/01/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   12/01/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   12/01/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   12/04/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   12/04/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   12/04/2017   Partial Approval   JAMES POWERS
  Light Gage Steel Frame   12/04/2017   Partial Inspection   JAMES POWERS
  Deputy Drilled-In Anchors   12/05/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   12/05/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   12/05/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   12/06/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   12/06/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   12/06/2017   Partial Approval   JAMES POWERS
  Drywall Nailing   12/06/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   12/07/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   12/07/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   12/07/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   12/08/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   12/08/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   12/08/2017   Partial Approval   JAMES POWERS
  Light Gage Steel Frame   12/08/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   12/11/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   12/11/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   12/11/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   12/12/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   12/12/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   12/12/2017   Partial Approval   JAMES POWERS
  Insulation   12/12/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   12/13/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   12/13/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   12/13/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   12/14/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   12/14/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   12/14/2017   Partial Approval   JAMES POWERS
  Light Gage Steel Frame   12/14/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   12/15/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   12/15/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   12/15/2017   Partial Approval   JAMES POWERS
  Light Gage Steel Frame   12/15/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   12/18/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   12/18/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   12/18/2017   Partial Approval   JAMES POWERS
  Insulation   12/18/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   12/19/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   12/19/2017   Partial Approval   JAMES POWERS
  Footing/Foundation/Slab   12/19/2017   Partial Approval   JAMES POWERS
  Insulation   12/19/2017   Partial Approval   JAMES POWERS
  METHANE-Barrier   12/19/2017   Not Ready for Inspection   JAMES POWERS
  METHANE-Subgrade   12/19/2017   Not Ready for Inspection   JAMES POWERS
  Deputy Drilled-In Anchors   12/20/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   12/20/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   12/21/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   12/21/2017   Partial Approval   JAMES POWERS
  Excavation/Setback/Form/Re-Bar   12/21/2017   Partial Approval   JAMES POWERS
  Light Gage Steel Frame   12/21/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   12/22/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   12/22/2017   Partial Approval   JAMES POWERS
  Insulation   12/22/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   12/26/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   12/26/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   12/26/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   12/27/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   12/27/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   12/27/2017   Partial Approval   JAMES POWERS
  Footing/Foundation/Slab   12/27/2017   Partial Approval   JAMES POWERS
  Insulation   12/27/2017   Not Ready for Inspection   JAMES POWERS
  METHANE-Barrier   12/27/2017   Approved   JAMES POWERS
  METHANE-Subgrade   12/27/2017   Approved   JAMES POWERS
  Deputy Drilled-In Anchors   12/28/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   12/28/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   12/28/2017   Partial Approval   JAMES POWERS
  Insulation   12/28/2017   Partial Approval   JAMES POWERS
  Light Gage Steel Frame   12/28/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   12/29/2017   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   12/29/2017   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   12/29/2017   Partial Approval   JAMES POWERS
  Insulation   12/29/2017   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   01/02/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   01/02/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   01/02/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   01/03/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   01/03/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   01/03/2018   Partial Approval   JAMES POWERS
  Footing/Foundation/Slab   01/03/2018   Partial Approval   JAMES POWERS
  Insulation   01/03/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   01/04/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   01/04/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   01/04/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   01/04/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   01/05/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   01/05/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   01/05/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   01/05/2018   Partial Approval   JAMES POWERS
  Insulation   01/05/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   01/08/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   01/08/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   01/08/2018   Partial Approval   JAMES POWERS
  Insulation   01/08/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   01/09/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   01/09/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   01/09/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   01/09/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   01/10/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   01/10/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   01/10/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   01/10/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   01/11/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   01/11/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   01/11/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   01/11/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   01/12/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   01/12/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   01/12/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   01/12/2018   Partial Approval   JAMES POWERS
  Drywall Nailing   01/12/2018   Partial Approval   JAMES POWERS
  Footing/Foundation/Slab   01/12/2018   Partial Approval   JAMES POWERS
  Light Gage Steel Frame   01/12/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   01/16/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   01/16/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   01/16/2018   Partial Approval   JAMES POWERS
  Drywall Nailing   01/16/2018   Partial Approval   JAMES POWERS
  Light Gage Steel Frame   01/16/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   01/17/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   01/17/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   01/17/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   01/17/2018   Partial Approval   JAMES POWERS
  Footing/Foundation/Slab   01/17/2018   Partial Approval   JAMES POWERS
  Light Gage Steel Frame   01/17/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   01/18/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   01/18/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   01/18/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   01/18/2018   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   01/18/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   01/19/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   01/19/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   01/19/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   01/19/2018   Partial Approval   JAMES POWERS
  Drywall Nailing   01/19/2018   Partial Approval   JAMES POWERS
  Insulation   01/19/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   01/22/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   01/22/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   01/22/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   01/22/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   01/23/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   01/23/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   01/23/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   01/23/2018   Partial Approval   JAMES POWERS
  Drywall Nailing   01/23/2018   Partial Approval   JAMES POWERS
  Insulation   01/23/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   01/24/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   01/24/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   01/24/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   01/24/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   01/25/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   01/25/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   01/25/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   01/25/2018   Partial Approval   JAMES POWERS
  Drywall Nailing   01/25/2018   Partial Approval   JAMES POWERS
  Insulation   01/25/2018   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   01/25/2018   Partial Approval   JAMES POWERS
  T-Bar Ceiling   01/25/2018   Partial Inspection   JAMES POWERS
  Deputy Drilled-In Anchors   01/26/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   01/26/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   01/26/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   01/26/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   01/29/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   01/29/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   01/29/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   01/29/2018   Partial Approval   JAMES POWERS
  Drywall Nailing   01/29/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   01/30/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   01/30/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   01/30/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   01/30/2018   Partial Approval   JAMES POWERS
  Drywall Nailing   01/30/2018   Partial Approval   JAMES POWERS
  Insulation   01/30/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   01/31/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   01/31/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   01/31/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   01/31/2018   Partial Approval   JAMES POWERS
  Insulation   01/31/2018   Not Ready for Inspection   JAMES POWERS
  Deputy Drilled-In Anchors   02/01/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   02/01/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   02/01/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   02/01/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   02/02/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   02/02/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   02/02/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   02/02/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   02/05/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   02/05/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   02/05/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   02/05/2018   Partial Approval   JAMES POWERS
  Drywall Nailing   02/05/2018   Not Ready for Inspection   JAMES POWERS
  Footing/Foundation/Slab   02/05/2018   Not Ready for Inspection   JAMES POWERS
  Insulation   02/05/2018   Not Ready for Inspection   JAMES POWERS
  Deputy Drilled-In Anchors   02/06/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   02/06/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   02/06/2018   Partial Approval   JAMES POWERS
  Drywall Nailing   02/06/2018   Partial Approval   JAMES POWERS
  Light Gage Steel Frame   02/06/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   02/07/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   02/07/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   02/07/2018   Partial Approval   JAMES POWERS
  Drywall Nailing   02/07/2018   Partial Approval   JAMES POWERS
  Footing/Foundation/Slab   02/07/2018   Partial Approval   JAMES POWERS
  Insulation   02/07/2018   Not Ready for Inspection   JAMES POWERS
  Deputy Drilled-In Anchors   02/08/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   02/08/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   02/08/2018   Partial Approval   JAMES POWERS
  Drywall Nailing   02/08/2018   Partial Approval   JAMES POWERS
  Insulation   02/08/2018   Partial Approval   JAMES POWERS
  Light Gage Steel Frame   02/08/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   02/09/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   02/09/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   02/09/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   02/12/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   02/12/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   02/12/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   02/13/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   02/13/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   02/13/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   02/14/2018   No Access for Inspection   JAMES POWERS
  Deputy Reinf. Concrete   02/14/2018   No Access for Inspection   JAMES POWERS
  Deputy Steel/Welding   02/14/2018   No Access for Inspection   JAMES POWERS
  Footing/Foundation/Slab   02/14/2018   No Access for Inspection   JAMES POWERS
  Light Gage Steel Frame   02/14/2018   No Access for Inspection   JAMES POWERS
  Deputy Drilled-In Anchors   02/15/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   02/15/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   02/15/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   02/16/2018   No Access for Inspection   JAMES POWERS
  Deputy Reinf. Concrete   02/16/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   02/16/2018   No Access for Inspection   JAMES POWERS
  Deputy Drilled-In Anchors   02/20/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   02/20/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   02/20/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   02/21/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   02/21/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   02/21/2018   Partial Approval   JAMES POWERS
  Footing/Foundation/Slab   02/21/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   02/22/2018   Conditional Approval   ERNESTO CORRAL
  Deputy Reinf. Concrete   02/22/2018   Conditional Approval   ERNESTO CORRAL
  Deputy Steel/Welding   02/22/2018   Conditional Approval   ERNESTO CORRAL
  Deputy Drilled-In Anchors   02/23/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   02/23/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   02/23/2018   Partial Approval   JAMES POWERS
  Insulation   02/23/2018   Partial Approval   JAMES POWERS
  Light Gage Steel Frame   02/23/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   02/26/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   02/26/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   02/26/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   02/27/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   02/27/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   02/27/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   02/28/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   02/28/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   03/01/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   03/01/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   03/01/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   03/02/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   03/02/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   03/02/2018   Partial Approval   JAMES POWERS
  Reinforced Concrete Frame   03/02/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   03/05/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   03/05/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   03/05/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   03/06/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   03/06/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   03/06/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   03/07/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   03/07/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   03/07/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   03/08/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   03/08/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   03/08/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   03/09/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   03/09/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   03/09/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   03/12/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   03/12/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   03/12/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   03/13/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   03/13/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   03/13/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   03/14/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   03/14/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   03/14/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   03/15/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   03/15/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   03/16/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   03/16/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   03/19/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   03/19/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   03/20/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   03/20/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   03/21/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   03/21/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   03/21/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   03/22/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   03/22/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   03/22/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   03/23/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   03/23/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   03/23/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   03/27/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   03/27/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   03/27/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   03/28/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   03/28/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   03/28/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   03/29/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   03/29/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   03/30/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   03/30/2018   Partial Approval   JAMES POWERS
  Drywall Nailing   03/30/2018   Partial Approval   JAMES POWERS
  Final   03/30/2018   Not Ready for Inspection   JAMES POWERS
  Footing/Foundation/Slab   03/30/2018   Approved   JAMES POWERS
  Green Building Final   03/30/2018   Not Ready for Inspection   JAMES POWERS
  Light Gage Steel Frame   03/30/2018   Partial Approval   JAMES POWERS
  METHANE-Final   03/30/2018   Approved   JAMES POWERS
  METHANE-Rough   03/30/2018   Approved   JAMES POWERS
  Reinforced Concrete Frame   03/30/2018   Not Ready for Inspection   JAMES POWERS
  SGSOV-Seismic Gas S/O Valve   03/30/2018   SGSOV Not Ready   JAMES POWERS
  SUSMP-Std. Urban Storm Water   03/30/2018   Approved   JAMES POWERS
  Smoke Detectors   03/30/2018   Approved   JAMES POWERS
  Verify Sprinkler Sign Off   03/30/2018   Not Ready for Inspection   JAMES POWERS
  Deputy Drilled-In Anchors   04/02/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   04/02/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   04/03/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   04/03/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   04/03/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   04/04/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   04/04/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   04/04/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   04/05/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   04/05/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   04/05/2018   Partial Approval   JAMES POWERS
  Drywall Nailing   04/05/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   04/06/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   04/06/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   04/06/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   04/09/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   04/09/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   04/09/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   04/10/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   04/10/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   04/10/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   04/11/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   04/11/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   04/11/2018   Partial Approval   JAMES POWERS
  Drywall Nailing   04/11/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   04/12/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   04/12/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   04/12/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   04/13/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   04/13/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   04/13/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   04/16/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   04/16/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   04/16/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   04/17/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   04/17/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   04/18/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   04/18/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   04/18/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   04/19/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   04/19/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   04/19/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   04/20/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   04/20/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   04/20/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   04/23/2018   Conditional Approval   NICK DANERI
  Deputy Reinf. Concrete   04/23/2018   Conditional Approval   NICK DANERI
  Deputy Steel/Welding   04/23/2018   Conditional Approval   NICK DANERI
  Deputy Drilled-In Anchors   04/24/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   04/24/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   04/24/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   04/24/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   04/25/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   04/25/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   04/25/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   04/26/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   04/26/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   04/26/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   04/26/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   04/27/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   04/27/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Reinf. Masonry   04/27/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Steel/Welding   04/27/2018   Conditional Approval   LESLIE TRUJILLO
  Deputy Drilled-In Anchors   04/30/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   04/30/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   04/30/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   04/30/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   05/01/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   05/01/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   05/01/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   05/02/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   05/02/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   05/02/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   05/03/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   05/03/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   05/04/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   05/04/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   05/07/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   05/07/2018   Partial Approval   JAMES POWERS
  Drywall Nailing   05/07/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   05/08/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   05/08/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   05/08/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   05/09/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   05/09/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   05/09/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   05/10/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   05/10/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   05/10/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   05/11/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   05/11/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   05/11/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   05/14/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   05/14/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   05/14/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   05/15/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   05/15/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   05/15/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   05/16/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   05/16/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   05/16/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   05/17/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   05/17/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   05/17/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   05/18/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   05/18/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   05/18/2018   Partial Approval   JAMES POWERS
  Drywall Nailing   05/18/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   05/21/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   05/21/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   05/21/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   05/22/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   05/22/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   05/23/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   05/23/2018   Partial Approval   JAMES POWERS
  Drywall Nailing   05/23/2018   Partial Approval   JAMES POWERS
  Light Gage Steel Frame   05/23/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   05/24/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   05/24/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   05/25/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   05/25/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   05/25/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   05/29/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   05/29/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   05/29/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   05/30/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   05/30/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   05/31/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   05/31/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   05/31/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   06/01/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   06/01/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   06/01/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   06/04/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   06/04/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   06/05/2018   Conditional Approval   NICK DANERI
  Deputy Reinf. Concrete   06/05/2018   Conditional Approval   NICK DANERI
  Deputy Reinf. Masonry   06/05/2018   Conditional Approval   NICK DANERI
  Deputy Steel/Welding   06/05/2018   Conditional Approval   NICK DANERI
  Deputy Drilled-In Anchors   06/06/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   06/06/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   06/06/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   06/06/2018   Partial Approval   JAMES POWERS
  Drywall Nailing   06/06/2018   Partial Approval   JAMES POWERS
  Final   06/06/2018   Not Ready for Inspection   JAMES POWERS
  Green Building Final   06/06/2018   Not Ready for Inspection   JAMES POWERS
  Reinforced Concrete Frame   06/06/2018   Not Ready for Inspection   JAMES POWERS
  SGSOV-Seismic Gas S/O Valve   06/06/2018   SGSOV Not Ready   JAMES POWERS
  Verify Sprinkler Sign Off   06/06/2018   Not Ready for Inspection   JAMES POWERS
  Deputy Drilled-In Anchors   06/07/2018   Conditional Approval   ERNESTO CORRAL
  Deputy Reinf. Concrete   06/07/2018   Conditional Approval   ERNESTO CORRAL
  Deputy Reinf. Masonry   06/07/2018   Conditional Approval   ERNESTO CORRAL
  Deputy Steel/Welding   06/07/2018   Conditional Approval   ERNESTO CORRAL
  Deputy Drilled-In Anchors   06/08/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   06/08/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   06/08/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   06/08/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   06/11/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   06/11/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   06/11/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   06/11/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   06/12/2018   Approved   JEFF BYTHEWAY
  Deputy Reinf. Concrete   06/12/2018   Approved   JEFF BYTHEWAY
  Deputy Reinf. Masonry   06/12/2018   Approved   JEFF BYTHEWAY
  Deputy Steel/Welding   06/12/2018   Approved   JEFF BYTHEWAY
  Deputy Drilled-In Anchors   06/13/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   06/13/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   06/13/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   06/13/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   06/14/2018   Conditional Approval   NICK DANERI
  Deputy Reinf. Concrete   06/14/2018   Conditional Approval   NICK DANERI
  Deputy Reinf. Masonry   06/14/2018   Conditional Approval   NICK DANERI
  Deputy Steel/Welding   06/14/2018   Conditional Approval   NICK DANERI
  Deputy Drilled-In Anchors   06/15/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   06/15/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   06/15/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   06/15/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   06/18/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   06/18/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   06/18/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   06/18/2018   Order to Comply Issued   JAMES POWERS
  Deputy Drilled-In Anchors   06/19/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   06/19/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   06/19/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   06/20/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   06/20/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   06/20/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   06/21/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   06/21/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   06/21/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   06/22/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   06/22/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   06/22/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   06/25/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   06/25/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   06/25/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   06/26/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   06/26/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   06/27/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   06/27/2018   Partial Approval   JAMES POWERS
  Light Gage Steel Frame   06/27/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   06/28/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   06/28/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   06/29/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   06/29/2018   Partial Approval   JAMES POWERS
  Interior/Exterior Lathing   06/29/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   07/03/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   07/03/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   07/05/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   07/06/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   07/06/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   07/09/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   07/09/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   07/10/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   07/10/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   07/10/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   07/11/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   07/11/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   07/12/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   07/12/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   07/12/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   07/13/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   07/13/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   07/13/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   07/16/2018   Order to Comply Issued   JAMES POWERS
  Deputy Drilled-In Anchors   07/16/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   07/16/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   07/16/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   07/17/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   07/17/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   07/17/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   07/18/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   07/18/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   07/18/2018   Partial Approval   JAMES POWERS
  Light Gage Steel Frame   07/18/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   07/19/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   07/19/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   07/20/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   07/20/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   07/23/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   07/23/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   07/24/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   07/24/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   07/24/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   07/25/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   07/25/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   07/25/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   07/26/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   07/26/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   07/26/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   07/27/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   07/27/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   07/27/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   07/30/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   07/30/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   07/31/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   07/31/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   07/31/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   08/01/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   08/01/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   08/01/2018   Partial Approval   JAMES POWERS
  Drywall Nailing   08/01/2018   Approved   JAMES POWERS
  Final   08/01/2018   Not Ready for Inspection   JAMES POWERS
  Green Building Final   08/01/2018   Not Ready for Inspection   JAMES POWERS
  Reinforced Concrete Frame   08/01/2018   Approved   JAMES POWERS
  SGSOV-Seismic Gas S/O Valve   08/01/2018   SGSOV Approved   JAMES POWERS
  Verify Sprinkler Sign Off   08/01/2018   Approved   JAMES POWERS
  Deputy Drilled-In Anchors   08/02/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   08/02/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   08/02/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   08/03/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   08/03/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   08/03/2018   Partial Approval   JAMES POWERS
  Pre-Inspection   08/03/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   08/06/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   08/06/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   08/06/2018   Partial Approval   JAMES POWERS
  Pre-Inspection   08/06/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   08/07/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   08/07/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   08/07/2018   Partial Approval   JAMES POWERS
  Pre-Inspection   08/07/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   08/08/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   08/08/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   08/08/2018   Partial Approval   JAMES POWERS
  Pre-Inspection   08/08/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   08/09/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   08/09/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   08/09/2018   Partial Approval   JAMES POWERS
  Pre-Inspection   08/09/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   08/10/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   08/10/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   08/10/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   08/13/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   08/13/2018   Partial Approval   JAMES POWERS
  Light Gage Steel Frame   08/13/2018   Approved   JAMES POWERS
  Pre-Inspection   08/13/2018   Partial Inspection   JAMES POWERS
  Deputy Drilled-In Anchors   08/14/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   08/14/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   08/14/2018   Partial Approval   JAMES POWERS
  Pre-Inspection   08/14/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   08/15/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   08/15/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   08/16/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   08/16/2018   Partial Approval   JAMES POWERS
  Pre-Inspection   08/16/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   08/17/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   08/17/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   08/21/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   08/21/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   08/22/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Concrete   08/22/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   08/22/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   08/23/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   08/23/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   08/24/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   08/24/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   08/27/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   08/27/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   08/28/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   08/28/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   08/29/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   08/29/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   08/30/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   08/30/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   08/31/2018   Partial Approval   JAMES POWERS
  Deputy Pre-Stress Concrete   08/31/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   08/31/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   09/04/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   09/04/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   09/05/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   09/05/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   09/06/2018   Conditional Approval   NICK DANERI
  Deputy Steel/Welding   09/06/2018   Conditional Approval   NICK DANERI
  Deputy Drilled-In Anchors   09/07/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   09/07/2018   Partial Approval   JAMES POWERS
  Pre-Inspection   09/07/2018   Not Ready for Inspection   JAMES POWERS
  Wood Frame   09/07/2018   Approved   JAMES POWERS
  Deputy Drilled-In Anchors   09/10/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   09/10/2018   Partial Approval   JAMES POWERS
  Floor/Roof Diaphrgm/Shear Wall   09/10/2018   Approved   JAMES POWERS
  Deputy Drilled-In Anchors   09/11/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   09/11/2018   Partial Approval   JAMES POWERS
  Light Gage Steel Frame   09/12/2018   Approved   JAMES POWERS
  Pre-Inspection   09/12/2018   Approved   JAMES POWERS
  Reinforced Masonry Frame   09/12/2018   Approved   JAMES POWERS
  Deputy Drilled-In Anchors   09/13/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   09/13/2018   Partial Approval   JAMES POWERS
  Light Gage Steel Frame   09/13/2018   Approved   JAMES POWERS
  Deputy Drilled-In Anchors   09/14/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   09/14/2018   Partial Approval   JAMES POWERS
  Final   09/14/2018   OK for TCO   JAMES POWERS
  Deputy Drilled-In Anchors   09/17/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   09/17/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   09/18/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   09/18/2018   Partial Approval   JAMES POWERS
  Final   09/25/2018   Not Ready for Inspection   JAMES POWERS
  Green Building Final   09/25/2018   Approved   JAMES POWERS
  Pre-Inspection   09/25/2018   Not Ready for Inspection   JAMES POWERS
  Pre-Inspection   09/26/2018   Partial Approval   JAMES POWERS
  Pre-Inspection   09/28/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   10/02/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   10/02/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   10/03/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   10/03/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   10/04/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   10/04/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   10/05/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   10/05/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   10/09/2018   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   10/09/2018   Partial Approval   JAMES POWERS
  Deputy Reinf. Masonry   10/18/2018   Partial Approval   JAMES POWERS
  Light Gage Steel Frame   10/25/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   12/28/2018   Partial Approval   JAMES POWERS
  Deputy Drilled-In Anchors   01/22/2019   Partial Approval   JAMES POWERS
  Special/Order Compliance   03/08/2019   Approved   JAMES POWERS
  Special/Order Compliance   03/14/2019   Approved   JAMES POWERS
  Special/Order Compliance   05/21/2019   Approved   JAMES POWERS
  Special/Order Compliance   08/26/2019   Approved   JAMES POWERS
  Deputy Drilled-In Anchors   10/23/2019   Partial Approval   JAMES POWERS
  Deputy Steel/Welding   10/23/2019   Partial Approval   JAMES POWERS
  Special/Order Compliance   02/14/2020   Approved   JAMES POWERS
  Final   03/04/2020   Not Ready for Inspection   JAMES POWERS
  SWPPP-Const. Storm Water   03/04/2020   Completed   JAMES POWERS
  Final   03/06/2020   OK to Issue CofO   JAMES POWERS

BACK     NEW SEARCH