Los Angeles department of building safty logo Permit and Inspection Report banner
21800 W VICTORY BLVD 91367
APPLICATION / PERMIT NUMBER: 13010-10000-02749
PLAN CHECK / JOB NUMBER: B13LA11062

Plan Check and Permit Information


GROUP: Building
TYPE: Bldg-New
SUB-TYPE: Commercial
PRIMARY USE: (16) Retail
WORK DESCRIPTION: New 1 story retail/tire shop
PERMIT ISSUED: Yes PERMIT ISSUE DATE: 08/12/2014 ISSUING OFFICE: Van Nuys
CURRENT STATUS: Issued CURRENT STATUS DATE: 08/12/2014

Permit Application Status History
Submitted 10/01/2013 APPLICANT
Assigned to Plan Check Engineer 10/03/2013 BINH PHAN
Corrections Issued 10/07/2013 BINH PHAN
Quality Review Completed 10/08/2013 BILL STUTSMAN
Building Plans Picked Up 10/08/2013 APPLICANT
Applicant returned to address corrections 02/05/2014 BINH PHAN
Plan Check Approved 08/12/2014 BINH PHAN
Issued 08/12/2014 LADBS

Permit Application Clearance Information
Address approval Cleared 01/09/2014 ANGENEE REYGADAS
Eng Process Fee Ord 176,300 Cleared 01/09/2014 ANGENEE REYGADAS
Work Adjacent to Public Way Cleared 01/23/2014 JAMES KHO
Low Impact Development Cleared 02/10/2014 AMMAR ELTAWIL
Hydrant and Access approval Cleared 02/11/2014 JOSEPH JACKSON
DAS Clearance Cleared 04/14/2014 BINH PHAN
Highway dedication Cleared 04/15/2014 LEE GUILBEAUX
Permit Cleared 04/15/2014 LEE GUILBEAUX
Roof/Waste drainage to street Cleared 04/15/2014 LEE GUILBEAUX
Miscellaneous Cleared 04/17/2014 LEE GUILBEAUX
Sewer availability Cleared 04/24/2014 LEE GUILBEAUX
Food Service Establishment Cleared 06/12/2014 KENNETH BROWNE
CPC Cleared 07/01/2014 MAY SIRINOPWONGSAGO
Frnt yard landscape/Water mgmt Cleared 07/01/2014 MAY SIRINOPWONGSAGO
Miscellaneous Cleared 07/01/2014 MAY SIRINOPWONGSAGO
Prkng lot landscape/Water mgmt Cleared 07/01/2014 MAY SIRINOPWONGSAGO
Site Plan review Cleared 07/01/2014 MAY SIRINOPWONGSAGO
Specific Plan Cleared 07/01/2014 MAY SIRINOPWONGSAGO
Tract Map conditions Cleared 07/01/2014 MAY SIRINOPWONGSAGO
Driveway location Cleared 08/07/2014 KEVIN ECKER
Green Code Cleared 08/07/2014 MARTHA DIAZ
Internal circulation Cleared 08/07/2014 KEVIN ECKER
Specific Plan Cleared 08/07/2014 KEVIN ECKER

Licensed Professional/Contractor Information
Architect Information
Zawodny, Vincent Leon; Lic. No.: C24170
144 GERONA AVENUE
SAN GABRIEL, CA  91775
Contractor Information
Owner-Builder
  
Engineer Information
Soltis, Paul Christopher; Lic. No.: GE2606
5732 LEMON AVE
CYPRESS, CA  90630
Engineer Information
Tucker, D Allen; Lic. No.: S5205
9725 THIRD AVE N.E #205
SEATTLE, WA  98115

Inspection Activity Information

Inspector Information
CAMERON CHABAN, (818) 374-1128
Office Hours: 7:00-8:00 AM MON-FRI
ROBERT DAVIS, (818) 374-1128
Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspection Request(s)
  No data available

Inspection Request History
  Special/Order Compliance   08/22/2014   Partial Inspection   ROBERT COLE
  Footing/Foundation/Slab   09/23/2014   Partial Inspection   ROBERT COLE
  Pre-Inspection   09/29/2014   Not Ready for Inspection   ROBERT COLE
  Excavation/Setback/Form/Re-Bar   10/01/2014   Partial Approval   ROBERT COLE
  Footing/Foundation/Slab   10/02/2014   Partial Approval   ROBERT COLE
  Footing/Foundation/Slab   10/07/2014   Partial Approval   ROBERT COLE
  Footing/Foundation/Slab   10/10/2014   Partial Approval   ROBERT COLE
  Deputy Reinf. Concrete   10/14/2014   Conditional Approval   ROBERT COLE
  Deputy Reinf. Concrete   10/15/2014   Conditional Approval   ROBERT COLE
  Footing/Foundation/Slab   10/15/2014   Partial Inspection   ROBERT COLE
  Deputy Reinf. Concrete   10/16/2014   Conditional Approval   ROBERT COLE
  Reinforced Concrete Frame   10/16/2014   Not Ready for Inspection   ROBERT COLE
  Deputy Reinf. Concrete   10/17/2014   Conditional Approval   ROBERT COLE
  Footing/Foundation/Slab   10/17/2014   Partial Approval   ROBERT COLE
  Footing/Foundation/Slab   10/22/2014   Partial Inspection   ROBERT COLE
  Deputy Reinf. Concrete   10/27/2014   Conditional Approval   ROBERT COLE
  Footing/Foundation/Slab   10/27/2014   Partial Approval   ROBERT COLE
  Deputy Reinf. Concrete   10/28/2014   Conditional Approval   ROBERT COLE
  Deputy Reinf. Concrete   10/29/2014   Conditional Approval   ROBERT COLE
  Deputy Reinf. Concrete   10/30/2014   Conditional Approval   ROBERT COLE
  Footing/Foundation/Slab   10/30/2014   Partial Approval   ROBERT COLE
  Deputy Reinf. Concrete   10/31/2014   Conditional Approval   ROBERT COLE
  Reinforced Concrete Frame   10/31/2014   Partial Approval   ROBERT COLE
  Deputy Reinf. Concrete   11/03/2014   Conditional Approval   ROBERT COLE
  Deputy Reinf. Concrete   11/04/2014   Conditional Approval   ROBERT COLE
  Deputy Reinf. Concrete   11/05/2014   Conditional Approval   ROBERT COLE
  Footing/Foundation/Slab   11/05/2014   Partial Approval   ROBERT COLE
  Deputy Reinf. Concrete   11/06/2014   Conditional Approval   ROBERT COLE
  Excavation/Setback/Form/Re-Bar   11/06/2014   Partial Approval   ROBERT COLE
  Deputy Reinf. Concrete   11/07/2014   Conditional Approval   ROBERT COLE
  Footing/Foundation/Slab   11/07/2014   Partial Approval   ROBERT COLE
  Deputy Reinf. Concrete   11/10/2014   Conditional Approval   ROBERT COLE
  Deputy Reinf. Concrete   11/12/2014   Conditional Approval   JAMES STEPHENS
  Footing/Foundation/Slab   11/12/2014   Partial Approval   ROBERT COLE
  Deputy Reinf. Concrete   11/13/2014   Conditional Approval   ROBERT COLE
  Pre-Inspection   11/13/2014   Partial Inspection   ROBERT COLE
  Deputy Reinf. Concrete   11/14/2014   Conditional Approval   ROBERT COLE
  Footing/Foundation/Slab   11/14/2014   Partial Approval   ROBERT COLE
  Deputy Reinf. Concrete   11/19/2014   Conditional Approval   ROBERT COLE
  Deputy Reinf. Concrete   11/20/2014   Conditional Approval   ROBERT COLE
  Deputy Reinf. Concrete   11/21/2014   Conditional Approval   ROBERT COLE
  Footing/Foundation/Slab   11/24/2014   Partial Approval   ROBERT COLE
  Footing/Foundation/Slab   12/01/2014   Partial Approval   ROBERT COLE
  Footing/Foundation/Slab   12/05/2014   Partial Inspection   ROBERT COLE
  Footing/Foundation/Slab   12/10/2014   Partial Inspection   ROBERT COLE
  Excavation/Setback/Form/Re-Bar   12/11/2014   Partial Approval   ROBERT COLE
  Deputy Reinf. Concrete   12/16/2014   Conditional Approval   ROBERT COLE
  Deputy Reinf. Concrete   12/17/2014   Conditional Approval   ROBERT COLE
  Deputy Reinf. Concrete   12/18/2014   Conditional Approval   ROBERT COLE
  Deputy Reinf. Concrete   12/19/2014   Conditional Approval   ROBERT COLE
  Footing/Foundation/Slab   12/22/2014   Partial Approval   JAMES STEPHENS
  Footing/Foundation/Slab   12/24/2014   Partial Inspection   JAMES STEPHENS
  Excavation/Setback/Form/Re-Bar   12/26/2014   Partial Approval   JAMES STEPHENS
  Footing/Foundation/Slab   12/29/2014   Partial Approval   JAMES STEPHENS
  Footing/Foundation/Slab   12/31/2014   Partial Approval   JAMES STEPHENS
  Pre-Inspection   01/02/2015   Not Ready for Inspection   JAMES STEPHENS
  Footing/Foundation/Slab   01/06/2015   Partial Approval   ROBERT COLE
  Deputy Reinf. Masonry   01/12/2015   Conditional Approval   ROBERT COLE
  Masonry Wall/Backfill   01/12/2015   Not Ready for Inspection   ROBERT COLE
  Deputy Reinf. Masonry   01/13/2015   Conditional Approval   ROBERT COLE
  Deputy Reinf. Masonry   01/14/2015   Conditional Approval   ROBERT COLE
  Deputy Reinf. Masonry   01/15/2015   Conditional Approval   ROBERT COLE
  Deputy Reinf. Masonry   01/16/2015   Conditional Approval   ROBERT COLE
  Masonry Wall/Backfill   01/20/2015   Partial Approval   ROBERT COLE
  Deputy Reinf. Concrete   01/21/2015   Conditional Approval   ROBERT COLE
  Deputy Reinf. Masonry   01/21/2015   Conditional Approval   ROBERT COLE
  Footing/Foundation/Slab   01/21/2015   Partial Approval   ROBERT COLE
  Masonry Wall/Backfill   01/21/2015   Partial Approval   ROBERT COLE
  Deputy Reinf. Concrete   01/22/2015   Conditional Approval   ROBERT COLE
  Deputy Reinf. Masonry   01/22/2015   Conditional Approval   ROBERT COLE
  Footing/Foundation/Slab   01/22/2015   Partial Approval   ROBERT COLE
  Pre-Inspection   01/22/2015   Partial Approval   ROBERT COLE
  Deputy Reinf. Concrete   01/23/2015   Conditional Approval   ROBERT COLE
  Deputy Reinf. Masonry   01/23/2015   Conditional Approval   ROBERT COLE
  Masonry Wall/Backfill   01/23/2015   Partial Inspection   ROBERT COLE
  Masonry Wall/Backfill   01/26/2015   Partial Inspection   ROBERT COLE
  Footing/Foundation/Slab   01/30/2015   Partial Approval   JAMES STEPHENS
  Deputy Reinf. Concrete   02/02/2015   Conditional Approval   ROBERT COLE
  Deputy Reinf. Concrete   02/03/2015   Conditional Approval   ROBERT COLE
  Masonry Wall/Backfill   02/03/2015   Partial Approval   ROBERT COLE
  Deputy Reinf. Concrete   02/04/2015   Conditional Approval   ROBERT COLE
  Footing/Foundation/Slab   02/04/2015   Partial Approval   ROBERT COLE
  Deputy Reinf. Concrete   02/05/2015   Conditional Approval   ROBERT COLE
  Masonry Wall/Backfill   02/05/2015   Partial Approval   ROBERT COLE
  Deputy Reinf. Concrete   02/06/2015   Conditional Approval   ROBERT COLE
  Structural Steel Frame   02/06/2015   Not Ready for Inspection   ROBERT COLE
  Structural Steel Frame   02/09/2015   Corrections Issued   ROBERT COLE
  Deputy Reinf. Concrete   02/10/2015   Conditional Approval   ROBERT COLE
  Deputy Reinf. Concrete   02/11/2015   Conditional Approval   ROBERT COLE
  Deputy Reinf. Concrete   02/12/2015   Conditional Approval   ROBERT COLE
  Footing/Foundation/Slab   02/12/2015   Partial Approval   ROBERT COLE
  Deputy Reinf. Concrete   02/13/2015   Conditional Approval   ROBERT COLE
  Masonry Wall/Backfill   02/18/2015   Partial Approval   ROBERT COLE
  Footing/Foundation/Slab   02/19/2015   Partial Approval   ROBERT COLE
  Masonry Wall/Backfill   02/20/2015   Partial Approval   ROBERT COLE
  Masonry Wall/Backfill   02/24/2015   Partial Approval   ROBERT COLE
  Deputy Reinf. Masonry   02/25/2015   Conditional Approval   ROBERT COLE
  Masonry Wall/Backfill   02/25/2015   Partial Approval   ROBERT COLE
  Deputy Reinf. Masonry   02/26/2015   Conditional Approval   ROBERT COLE
  Footing/Foundation/Slab   02/26/2015   Partial Approval   ROBERT COLE
  Deputy Reinf. Masonry   02/27/2015   Conditional Approval   ROBERT COLE
  Masonry Wall/Backfill   02/27/2015   Not Ready for Inspection   ROBERT COLE
  Masonry Wall/Backfill   03/03/2015   Not Ready for Inspection   ROBERT COLE
  Masonry Wall/Backfill   03/04/2015   Not Ready for Inspection   ROBERT COLE
  Masonry Wall/Backfill   03/05/2015   Partial Approval   ROBERT COLE
  Masonry Wall/Backfill   03/06/2015   Partial Approval   JAMES STEPHENS
  Masonry Wall/Backfill   03/09/2015   Partial Approval   ROBERT COLE
  Deputy Reinf. Concrete   03/10/2015   Conditional Approval   ROBERT COLE
  Masonry Wall/Backfill   03/10/2015   Partial Approval   ROBERT COLE
  Deputy Reinf. Concrete   03/11/2015   Conditional Approval   ROBERT COLE
  Deputy Reinf. Concrete   03/12/2015   Conditional Approval   ROBERT COLE
  Masonry Wall/Backfill   03/12/2015   Not Ready for Inspection   ROBERT COLE
  Deputy Reinf. Concrete   03/13/2015   Conditional Approval   ROBERT COLE
  Masonry Wall/Backfill   03/13/2015   Not Ready for Inspection   ROBERT COLE
  Deputy Reinf. Concrete   03/16/2015   Conditional Approval   ROBERT COLE
  Deputy Reinf. Masonry   03/16/2015   Conditional Approval   ROBERT COLE
  Masonry Wall/Backfill   03/16/2015   Not Ready for Inspection   ROBERT COLE
  Deputy Reinf. Concrete   03/17/2015   Conditional Approval   ROBERT COLE
  Deputy Reinf. Masonry   03/17/2015   Conditional Approval   ROBERT COLE
  Masonry Wall/Backfill   03/17/2015   Partial Approval   ROBERT COLE
  Deputy Reinf. Concrete   03/18/2015   Conditional Approval   ROBERT COLE
  Deputy Reinf. Masonry   03/18/2015   Conditional Approval   ROBERT COLE
  Deputy Reinf. Concrete   03/19/2015   Conditional Approval   ROBERT COLE
  Deputy Reinf. Masonry   03/19/2015   Conditional Approval   ROBERT COLE
  Footing/Foundation/Slab   03/19/2015   Partial Approval   ROBERT COLE
  Deputy Reinf. Concrete   03/20/2015   Conditional Approval   ROBERT COLE
  Deputy Reinf. Masonry   03/20/2015   Conditional Approval   ROBERT COLE
  Deputy Reinf. Concrete   03/24/2015   Conditional Approval   ROBERT COLE
  Deputy Reinf. Masonry   03/24/2015   Conditional Approval   ROBERT COLE
  Masonry Wall/Backfill   03/24/2015   Not Ready for Inspection   ROBERT COLE
  Deputy Reinf. Concrete   03/25/2015   Conditional Approval   ROBERT COLE
  Deputy Reinf. Masonry   03/25/2015   Conditional Approval   ROBERT COLE
  Masonry Wall/Backfill   03/25/2015   Corrections Issued   ROBERT COLE
  Deputy Reinf. Concrete   03/26/2015   Conditional Approval   ROBERT COLE
  Deputy Reinf. Masonry   03/26/2015   Conditional Approval   ROBERT COLE
  Masonry Wall/Backfill   03/26/2015   Partial Approval   ROBERT COLE
  Deputy Reinf. Concrete   03/27/2015   Conditional Approval   ROBERT COLE
  Deputy Reinf. Masonry   03/27/2015   Conditional Approval   ROBERT COLE
  Masonry Wall/Backfill   03/27/2015   Partial Inspection   ROBERT COLE
  Masonry Wall/Backfill   03/31/2015   Partial Approval   ROBERT COLE
  Deputy Reinf. Concrete   04/01/2015   Conditional Approval   STEPHEN REED
  Deputy Reinf. Masonry   04/01/2015   Conditional Approval   STEPHEN REED
  Deputy Reinf. Concrete   04/02/2015   Conditional Approval   ROBERT COLE
  Deputy Reinf. Masonry   04/02/2015   Conditional Approval   ROBERT COLE
  Masonry Wall/Backfill   04/02/2015   Partial Approval   ROBERT COLE
  Deputy Reinf. Concrete   04/03/2015   Conditional Approval   ROBERT COLE
  Deputy Reinf. Masonry   04/03/2015   Conditional Approval   ROBERT COLE
  Deputy Reinf. Concrete   04/06/2015   Conditional Approval   ROBERT COLE
  Deputy Reinf. Masonry   04/06/2015   Conditional Approval   ROBERT COLE
  Deputy Reinf. Concrete   04/07/2015   Conditional Approval   ROBERT COLE
  Deputy Reinf. Masonry   04/07/2015   Conditional Approval   ROBERT COLE
  Deputy Reinf. Concrete   04/08/2015   Conditional Approval   ROBERT COLE
  Deputy Reinf. Masonry   04/08/2015   Conditional Approval   ROBERT COLE
  Deputy Reinf. Concrete   04/09/2015   Conditional Approval   ROBERT COLE
  Deputy Reinf. Masonry   04/09/2015   Conditional Approval   ROBERT COLE
  Deputy Reinf. Concrete   04/10/2015   Conditional Approval   ROBERT COLE
  Deputy Reinf. Masonry   04/10/2015   Conditional Approval   ROBERT COLE
  Footing/Foundation/Slab   04/14/2015   Partial Approval   ROBERT COLE
  Structural Steel Frame   04/14/2015   Corrections Issued   ROBERT COLE
  Deputy Steel/Welding   04/15/2015   Conditional Approval   ROBERT COLE
  Deputy Steel/Welding   04/16/2015   Conditional Approval   ROBERT COLE
  Green Building Rough   04/16/2015   Not Ready for Inspection   BRYAN MEYER
  Reinforced Masonry Frame   04/16/2015   Partial Approval   ROBERT COLE
  Verify Sprinkler Sign Off   04/16/2015   Not Ready for Inspection   ROBERT COLE
  Deputy Steel/Welding   04/17/2015   Conditional Approval   ROBERT COLE
  Deputy Drilled-In Anchors   04/20/2015   Conditional Approval   ROBERT COLE
  Deputy Reinf. Masonry   04/20/2015   Conditional Approval   ROBERT COLE
  Deputy Steel/Welding   04/20/2015   Conditional Approval   ROBERT COLE
  Deputy Drilled-In Anchors   04/21/2015   Conditional Approval   ROBERT COLE
  Deputy Reinf. Masonry   04/21/2015   Conditional Approval   ROBERT COLE
  Deputy Steel/Welding   04/21/2015   Conditional Approval   ROBERT COLE
  Masonry Wall/Backfill   04/21/2015   Partial Approval   ROBERT COLE
  Deputy Drilled-In Anchors   04/22/2015   Conditional Approval   ROBERT COLE
  Deputy Reinf. Masonry   04/22/2015   Conditional Approval   ROBERT COLE
  Deputy Steel/Welding   04/22/2015   Conditional Approval   ROBERT COLE
  Footing/Foundation/Slab   04/22/2015   Partial Approval   ROBERT COLE
  Deputy Drilled-In Anchors   04/23/2015   Conditional Approval   ROBERT COLE
  Deputy Reinf. Masonry   04/23/2015   Conditional Approval   ROBERT COLE
  Deputy Steel/Welding   04/23/2015   Conditional Approval   ROBERT COLE
  Masonry Wall/Backfill   04/23/2015   Partial Approval   ROBERT COLE
  Deputy Drilled-In Anchors   04/24/2015   Conditional Approval   ROBERT COLE
  Deputy Reinf. Masonry   04/24/2015   Conditional Approval   ROBERT COLE
  Deputy Steel/Welding   04/24/2015   Conditional Approval   ROBERT COLE
  Masonry Wall/Backfill   04/24/2015   Partial Approval   ROBERT COLE
  Deputy Drilled-In Anchors   04/27/2015   Conditional Approval   ROBERT COLE
  Deputy Reinf. Concrete   04/27/2015   Conditional Approval   ROBERT COLE
  Deputy Reinf. Masonry   04/27/2015   Conditional Approval   ROBERT COLE
  Deputy Steel/Welding   04/27/2015   Conditional Approval   ROBERT COLE
  Deputy Drilled-In Anchors   04/28/2015   Conditional Approval   ROBERT COLE
  Deputy Reinf. Concrete   04/28/2015   Conditional Approval   ROBERT COLE
  Deputy Reinf. Masonry   04/28/2015   Conditional Approval   ROBERT COLE
  Deputy Steel/Welding   04/28/2015   Conditional Approval   ROBERT COLE
  Deputy Drilled-In Anchors   04/29/2015   Conditional Approval   ROBERT COLE
  Deputy Reinf. Concrete   04/29/2015   Conditional Approval   ROBERT COLE
  Deputy Reinf. Masonry   04/29/2015   Conditional Approval   ROBERT COLE
  Deputy Steel/Welding   04/29/2015   Conditional Approval   ROBERT COLE
  Masonry Wall/Backfill   04/29/2015   Partial Approval   ROBERT COLE
  Deputy Drilled-In Anchors   04/30/2015   Conditional Approval   ROBERT COLE
  Deputy Reinf. Concrete   04/30/2015   Conditional Approval   ROBERT COLE
  Deputy Reinf. Masonry   04/30/2015   Conditional Approval   ROBERT COLE
  Deputy Steel/Welding   04/30/2015   Conditional Approval   ROBERT COLE
  Masonry Wall/Backfill   04/30/2015   Partial Inspection   ROBERT COLE
  Deputy Drilled-In Anchors   05/01/2015   Conditional Approval   ROBERT COLE
  Deputy Reinf. Concrete   05/01/2015   Conditional Approval   ROBERT COLE
  Deputy Reinf. Masonry   05/01/2015   Conditional Approval   ROBERT COLE
  Deputy Steel/Welding   05/01/2015   Conditional Approval   ROBERT COLE
  Deputy Drilled-In Anchors   05/04/2015   Conditional Approval   JAMES STEPHENS
  Deputy Reinf. Concrete   05/04/2015   Conditional Approval   JAMES STEPHENS
  Deputy Reinf. Masonry   05/04/2015   Conditional Approval   JAMES STEPHENS
  Deputy Steel/Welding   05/04/2015   Conditional Approval   JAMES STEPHENS
  Masonry Wall/Backfill   05/04/2015   Partial Approval   JAMES STEPHENS
  Deputy Drilled-In Anchors   05/05/2015   Conditional Approval   ROBERT COLE
  Deputy Reinf. Concrete   05/05/2015   Conditional Approval   ROBERT COLE
  Deputy Reinf. Masonry   05/05/2015   Conditional Approval   ROBERT COLE
  Deputy Steel/Welding   05/05/2015   Conditional Approval   ROBERT COLE
  Masonry Wall/Backfill   05/05/2015   Conditional Approval   ROBERT COLE
  Deputy Drilled-In Anchors   05/06/2015   Conditional Approval   ROBERT COLE
  Deputy Reinf. Concrete   05/06/2015   Conditional Approval   ROBERT COLE
  Deputy Reinf. Masonry   05/06/2015   Conditional Approval   ROBERT COLE
  Deputy Steel/Welding   05/06/2015   Conditional Approval   ROBERT COLE
  Footing/Foundation/Slab   05/06/2015   Not Ready for Inspection   ROBERT COLE
  Masonry Wall/Backfill   05/06/2015   Not Ready for Inspection   ROBERT COLE
  Deputy Drilled-In Anchors   05/07/2015   Conditional Approval   ROBERT COLE
  Deputy Reinf. Concrete   05/07/2015   Conditional Approval   ROBERT COLE
  Deputy Reinf. Masonry   05/07/2015   Conditional Approval   ROBERT COLE
  Deputy Steel/Welding   05/07/2015   Conditional Approval   ROBERT COLE
  Masonry Wall/Backfill   05/07/2015   Partial Approval   ROBERT COLE
  Deputy Drilled-In Anchors   05/08/2015   Conditional Approval   ROBERT COLE
  Deputy Reinf. Concrete   05/08/2015   Conditional Approval   ROBERT COLE
  Deputy Reinf. Masonry   05/08/2015   Conditional Approval   ROBERT COLE
  Deputy Steel/Welding   05/08/2015   Conditional Approval   ROBERT COLE
  Deputy Drilled-In Anchors   05/11/2015   Conditional Approval   ROBERT COLE
  Deputy Steel/Welding   05/11/2015   Conditional Approval   ROBERT COLE
  Light Gage Steel Frame   05/11/2015   Partial Inspection   ROBERT COLE
  Deputy Drilled-In Anchors   05/12/2015   Conditional Approval   ROBERT COLE
  Deputy Reinf. Concrete   05/12/2015   Conditional Approval   ROBERT COLE
  Deputy Reinf. Masonry   05/12/2015   Conditional Approval   ROBERT COLE
  Deputy Steel/Welding   05/12/2015   Conditional Approval   ROBERT COLE
  Footing/Foundation/Slab   05/12/2015   Partial Approval   ROBERT COLE
  Masonry Wall/Backfill   05/12/2015   Partial Approval   ROBERT COLE
  Deputy Drilled-In Anchors   05/13/2015   Conditional Approval   ROBERT COLE
  Deputy Reinf. Concrete   05/13/2015   Conditional Approval   ROBERT COLE
  Deputy Reinf. Masonry   05/13/2015   Conditional Approval   ROBERT COLE
  Deputy Steel/Welding   05/13/2015   Conditional Approval   ROBERT COLE
  Masonry Wall/Backfill   05/13/2015   Partial Approval   ROBERT COLE
  Deputy Drilled-In Anchors   05/14/2015   Conditional Approval   ROBERT COLE
  Deputy Reinf. Concrete   05/14/2015   Conditional Approval   ROBERT COLE
  Deputy Reinf. Masonry   05/14/2015   Conditional Approval   ROBERT COLE
  Deputy Steel/Welding   05/14/2015   Conditional Approval   ROBERT COLE
  Deputy Drilled-In Anchors   05/15/2015   Conditional Approval   ROBERT COLE
  Deputy Reinf. Concrete   05/15/2015   Conditional Approval   ROBERT COLE
  Deputy Reinf. Masonry   05/15/2015   Conditional Approval   ROBERT COLE
  Deputy Steel/Welding   05/15/2015   Conditional Approval   ROBERT COLE
  Footing/Foundation/Slab   05/15/2015   Partial Inspection   ROBERT COLE
  Deputy Drilled-In Anchors   05/18/2015   Conditional Approval   JAMES STEPHENS
  Deputy Reinf. Concrete   05/18/2015   Conditional Approval   JAMES STEPHENS
  Deputy Steel/Welding   05/18/2015   Conditional Approval   JAMES STEPHENS
  Footing/Foundation/Slab   05/18/2015   Partial Approval   JAMES STEPHENS
  Light Gage Steel Frame   05/18/2015   Partial Approval   JAMES STEPHENS
  Deputy Drilled-In Anchors   05/19/2015   Conditional Approval   ROBERT COLE
  Deputy Reinf. Concrete   05/19/2015   Conditional Approval   ROBERT COLE
  Deputy Steel/Welding   05/19/2015   Conditional Approval   ROBERT COLE
  Deputy Drilled-In Anchors   05/20/2015   Conditional Approval   ROBERT COLE
  Deputy Reinf. Concrete   05/20/2015   Conditional Approval   ROBERT COLE
  Deputy Steel/Welding   05/20/2015   Conditional Approval   ROBERT COLE
  Footing/Foundation/Slab   05/20/2015   Partial Approval   ROBERT COLE
  Deputy Drilled-In Anchors   05/21/2015   Conditional Approval   ROBERT COLE
  Deputy Reinf. Concrete   05/21/2015   Conditional Approval   ROBERT COLE
  Deputy Steel/Welding   05/21/2015   Conditional Approval   ROBERT COLE
  Deputy Drilled-In Anchors   05/22/2015   Conditional Approval   ROBERT COLE
  Deputy Reinf. Concrete   05/22/2015   Conditional Approval   ROBERT COLE
  Deputy Steel/Welding   05/22/2015   Conditional Approval   ROBERT COLE
  Footing/Foundation/Slab   05/22/2015   Partial Approval   ROBERT COLE
  Deputy Drilled-In Anchors   05/26/2015   Conditional Approval   ROBERT COLE
  Deputy Steel/Welding   05/26/2015   Conditional Approval   ROBERT COLE
  Deputy Drilled-In Anchors   05/27/2015   Conditional Approval   ROBERT COLE
  Deputy Steel/Welding   05/27/2015   Conditional Approval   ROBERT COLE
  Footing/Foundation/Slab   05/27/2015   Partial Approval   ROBERT COLE
  Deputy Drilled-In Anchors   05/28/2015   Conditional Approval   ROBERT COLE
  Deputy Reinf. Concrete   05/28/2015   Conditional Approval   ROBERT COLE
  Deputy Steel/Welding   05/28/2015   Conditional Approval   ROBERT COLE
  Deputy Drilled-In Anchors   05/29/2015   Conditional Approval   ROBERT COLE
  Deputy Reinf. Concrete   05/29/2015   Conditional Approval   ROBERT COLE
  Deputy Steel/Welding   05/29/2015   Conditional Approval   ROBERT COLE
  Green Building Rough   05/29/2015   Partial Inspection   BRYAN MEYER
  Light Gage Steel Frame   05/29/2015   Partial Inspection   ROBERT COLE
  Masonry Wall/Backfill   05/29/2015   Not Ready for Inspection   ROBERT COLE
  Deputy Drilled-In Anchors   06/01/2015   Conditional Approval   ROBERT COLE
  Deputy Steel/Welding   06/01/2015   Conditional Approval   ROBERT COLE
  Light Gage Steel Frame   06/01/2015   Partial Approval   ROBERT COLE
  Masonry Wall/Backfill   06/01/2015   Partial Approval   ROBERT COLE
  Wall Anchors   06/01/2015   Conditional Approval   ROBERT COLE
  Deputy Drilled-In Anchors   06/02/2015   Conditional Approval   ROBERT COLE
  Deputy Steel/Welding   06/02/2015   Conditional Approval   ROBERT COLE
  Masonry Wall/Backfill   06/02/2015   Partial Approval   ROBERT COLE
  Deputy Drilled-In Anchors   06/03/2015   Conditional Approval   ROBERT COLE
  Deputy Steel/Welding   06/03/2015   Conditional Approval   ROBERT COLE
  Light Gage Steel Frame   06/03/2015   Partial Inspection   ROBERT COLE
  Masonry Wall/Backfill   06/03/2015   Partial Approval   ROBERT COLE
  Deputy Drilled-In Anchors   06/04/2015   Conditional Approval   ROBERT COLE
  Deputy Steel/Welding   06/04/2015   Conditional Approval   ROBERT COLE
  Deputy Drilled-In Anchors   06/05/2015   Conditional Approval   ROBERT COLE
  Deputy Steel/Welding   06/05/2015   Conditional Approval   ROBERT COLE
  Deputy Steel/Welding   06/08/2015   Conditional Approval   ROBERT COLE
  Footing/Foundation/Slab   06/08/2015   Partial Approval   ROBERT COLE
  Deputy Steel/Welding   06/09/2015   Conditional Approval   ROBERT COLE
  Deputy Steel/Welding   06/10/2015   Conditional Approval   ROBERT COLE
  Floor/Roof Diaphrgm/Shear Wall   06/10/2015   Partial Inspection   ROBERT COLE
  Pre-Inspection   06/10/2015   Partial Inspection   BRYAN MEYER
  Deputy Steel/Welding   06/11/2015   Conditional Approval   ROBERT COLE
  Deputy Steel/Welding   06/12/2015   Conditional Approval   ROBERT COLE
  Deputy Drilled-In Anchors   06/15/2015   Conditional Approval   ROBERT COLE
  Deputy Steel/Welding   06/15/2015   Conditional Approval   ROBERT COLE
  Deputy Drilled-In Anchors   06/16/2015   Conditional Approval   ROBERT COLE
  Deputy Steel/Welding   06/16/2015   Conditional Approval   ROBERT COLE
  Deputy Drilled-In Anchors   06/17/2015   Conditional Approval   JAMES STEPHENS
  Deputy Steel/Welding   06/17/2015   Conditional Approval   JAMES STEPHENS
  Deputy Drilled-In Anchors   06/18/2015   Conditional Approval   ROBERT COLE
  Deputy Steel/Welding   06/18/2015   Conditional Approval   ROBERT COLE
  Deputy Drilled-In Anchors   06/19/2015   Conditional Approval   ROBERT COLE
  Deputy Steel/Welding   06/19/2015   Conditional Approval   ROBERT COLE
  Structural Steel Frame   06/19/2015   Corrections Issued   ROBERT COLE
  Deputy Drilled-In Anchors   06/22/2015   Conditional Approval   ROBERT COLE
  Deputy Steel/Welding   06/22/2015   Conditional Approval   ROBERT COLE
  Masonry Wall/Backfill   06/22/2015   Partial Approval   ROBERT COLE
  Deputy Drilled-In Anchors   06/23/2015   Conditional Approval   ROBERT COLE
  Deputy Steel/Welding   06/23/2015   Conditional Approval   ROBERT COLE
  Deputy Drilled-In Anchors   06/24/2015   Conditional Approval   ROBERT COLE
  Deputy Steel/Welding   06/24/2015   Conditional Approval   ROBERT COLE
  Masonry Wall/Backfill   06/24/2015   Partial Approval   ROBERT COLE
  Deputy Drilled-In Anchors   06/25/2015   Conditional Approval   ROBERT COLE
  Deputy Steel/Welding   06/25/2015   Conditional Approval   ROBERT COLE
  Deputy Drilled-In Anchors   06/26/2015   Conditional Approval   ROBERT COLE
  Deputy Steel/Welding   06/26/2015   Conditional Approval   ROBERT COLE
  Masonry Wall/Backfill   06/26/2015   Partial Approval   ROBERT COLE
  Deputy Drilled-In Anchors   06/29/2015   Conditional Approval   ROBERT COLE
  Deputy Steel/Welding   06/29/2015   Conditional Approval   ROBERT COLE
  Deputy Drilled-In Anchors   06/30/2015   Conditional Approval   ROBERT COLE
  Deputy Steel/Welding   06/30/2015   Conditional Approval   ROBERT COLE
  Deputy Drilled-In Anchors   07/01/2015   Conditional Approval   ROBERT COLE
  Deputy Steel/Welding   07/01/2015   Conditional Approval   ROBERT COLE
  Deputy Drilled-In Anchors   07/02/2015   Conditional Approval   ROBERT COLE
  Deputy Steel/Welding   07/02/2015   Conditional Approval   ROBERT COLE
  Deputy Drilled-In Anchors   07/06/2015   Conditional Approval   ROBERT COLE
  Deputy Steel/Welding   07/06/2015   Conditional Approval   ROBERT COLE
  Reinforced Concrete Frame   07/06/2015   Not Ready for Inspection   ROBERT COLE
  Deputy Drilled-In Anchors   07/07/2015   Conditional Approval   ROBERT COLE
  Deputy Steel/Welding   07/07/2015   Conditional Approval   ROBERT COLE
  Deputy Drilled-In Anchors   07/08/2015   Conditional Approval   ROBERT COLE
  Deputy Steel/Welding   07/08/2015   Conditional Approval   ROBERT COLE
  Floor/Roof Diaphrgm/Shear Wall   07/08/2015   Corrections Issued   ROBERT COLE
  Green Building Rough   07/08/2015   Partial Approval   BRYAN MEYER
  Light Gage Steel Frame   07/08/2015   Corrections Issued   ROBERT COLE
  Deputy Drilled-In Anchors   07/09/2015   Conditional Approval   ROBERT COLE
  Deputy Steel/Welding   07/09/2015   Conditional Approval   ROBERT COLE
  Deputy Drilled-In Anchors   07/10/2015   Conditional Approval   ROBERT COLE
  Deputy Steel/Welding   07/10/2015   Conditional Approval   ROBERT COLE
  Footing/Foundation/Slab   07/10/2015   Partial Inspection   ROBERT COLE
  Green Building Final   07/10/2015   Partial Inspection   BRYAN MEYER
  Light Gage Steel Frame   07/10/2015   Partial Approval   ROBERT COLE
  Deputy Drilled-In Anchors   07/13/2015   Conditional Approval   ROBERT COLE
  Deputy Steel/Welding   07/13/2015   Conditional Approval   ROBERT COLE
  Deputy Drilled-In Anchors   07/14/2015   Conditional Approval   ROBERT COLE
  Deputy Steel/Welding   07/14/2015   Conditional Approval   ROBERT COLE
  Deputy Drilled-In Anchors   07/15/2015   Conditional Approval   ROBERT COLE
  Deputy Steel/Welding   07/15/2015   Conditional Approval   ROBERT COLE
  Drywall Nailing   07/15/2015   Partial Approval   ROBERT COLE
  Footing/Foundation/Slab   07/15/2015   Partial Approval   ROBERT COLE
  Deputy Drilled-In Anchors   07/16/2015   Conditional Approval   ROBERT COLE
  Deputy Steel/Welding   07/16/2015   Conditional Approval   ROBERT COLE
  Drywall Nailing   07/16/2015   Partial Approval   ROBERT COLE
  Insulation   07/16/2015   Partial Approval   ROBERT COLE
  Wood Frame   07/16/2015   Partial Approval   ROBERT COLE
  Deputy Drilled-In Anchors   07/20/2015   Conditional Approval   ROBERT COLE
  Deputy Steel/Welding   07/20/2015   Conditional Approval   ROBERT COLE
  Footing/Foundation/Slab   07/20/2015   Not Ready for Inspection   ROBERT COLE
  Light Gage Steel Frame   07/20/2015   Partial Inspection   ROBERT COLE
  Deputy Drilled-In Anchors   07/21/2015   Conditional Approval   ROBERT COLE
  Deputy Steel/Welding   07/21/2015   Conditional Approval   ROBERT COLE
  Masonry Wall/Backfill   07/21/2015   Corrections Issued   ROBERT COLE
  Deputy Drilled-In Anchors   07/22/2015   Conditional Approval   ROBERT COLE
  Deputy Steel/Welding   07/22/2015   Conditional Approval   ROBERT COLE
  Light Gage Steel Frame   07/22/2015   Partial Approval   ROBERT COLE
  Deputy Drilled-In Anchors   07/23/2015   Conditional Approval   ROBERT COLE
  Deputy Steel/Welding   07/23/2015   Conditional Approval   ROBERT COLE
  Masonry Wall/Backfill   07/23/2015   Partial Approval   ROBERT COLE
  Deputy Drilled-In Anchors   07/24/2015   Conditional Approval   ROBERT COLE
  Deputy Steel/Welding   07/24/2015   Conditional Approval   ROBERT COLE
  Drywall Nailing   07/27/2015   Partial Inspection   ROBERT COLE
  Green Building Rough   07/27/2015   Partial Inspection   BRYAN MEYER
  Light Gage Steel Frame   07/27/2015   Partial Inspection   ROBERT COLE
  Deputy Drilled-In Anchors   07/28/2015   Conditional Approval   ROBERT COLE
  Deputy Steel/Welding   07/28/2015   Conditional Approval   ROBERT COLE
  Deputy Drilled-In Anchors   07/29/2015   Conditional Approval   ROBERT COLE
  Deputy Steel/Welding   07/29/2015   Conditional Approval   ROBERT COLE
  Drywall Nailing   07/29/2015   Partial Inspection   ROBERT COLE
  Special/Order Compliance   07/29/2015   Partial Inspection   ROBERT COLE
  Deputy Drilled-In Anchors   07/30/2015   Conditional Approval   ROBERT COLE
  Deputy Steel/Welding   07/30/2015   Conditional Approval   ROBERT COLE
  Deputy Drilled-In Anchors   07/31/2015   Conditional Approval   ROBERT COLE
  Deputy Steel/Welding   07/31/2015   Conditional Approval   ROBERT COLE
  Pre-Inspection   07/31/2015   Partial Approval   ROBERT COLE
  Deputy Drilled-In Anchors   08/03/2015   Conditional Approval   ROBERT COLE
  Deputy Steel/Welding   08/03/2015   Conditional Approval   ROBERT COLE
  Deputy Drilled-In Anchors   08/04/2015   Conditional Approval   ROBERT COLE
  Deputy Steel/Welding   08/04/2015   Conditional Approval   ROBERT COLE
  Deputy Drilled-In Anchors   08/05/2015   Conditional Approval   ROBERT COLE
  Deputy Steel/Welding   08/05/2015   Conditional Approval   ROBERT COLE
  Deputy Drilled-In Anchors   08/06/2015   Conditional Approval   ROBERT COLE
  Deputy Steel/Welding   08/06/2015   Conditional Approval   ROBERT COLE
  Structural Steel Frame   08/06/2015   Partial Inspection   ROBERT COLE
  Deputy Drilled-In Anchors   08/07/2015   Conditional Approval   ROBERT COLE
  Deputy Steel/Welding   08/07/2015   Conditional Approval   ROBERT COLE
  Light Gage Steel Frame   08/07/2015   Partial Approval   ROBERT COLE
  Green Building Rough   08/10/2015   Partial Inspection   BRYAN MEYER
  Light Gage Steel Frame   08/10/2015   Partial Inspection   ROBERT COLE
  Reinforced Masonry Frame   08/10/2015   Partial Inspection   CAMERON CHABAN
  Verify Sprinkler Sign Off   08/10/2015   Partial Inspection   CAMERON CHABAN
  Drywall Nailing   08/11/2015   Partial Approval   ROBERT COLE
  Insulation   08/11/2015   Partial Inspection   ROBERT COLE
  Light Gage Steel Frame   08/11/2015   Partial Inspection   ROBERT COLE
  T-Bar Ceiling   08/11/2015   Not Ready for Inspection   ROBERT COLE
  Insulation   08/12/2015   Partial Approval   CAMERON CHABAN
  Light Gage Steel Frame   08/12/2015   Partial Approval   CAMERON CHABAN
  Final   08/17/2015   Partial Inspection   ROBERT COLE
  Footing/Foundation/Slab   08/17/2015   Partial Inspection   ROBERT COLE
  Green Building Final   08/17/2015   Partial Inspection   BRYAN MEYER
  Green Building Rough   08/17/2015   Approved   BRYAN MEYER
  Reinforced Masonry Frame   08/17/2015   Partial Inspection   ROBERT COLE
  SGSOV-Seismic Gas S/O Valve   08/17/2015   SGSOV Not Ready   ROBERT COLE
  Smoke Detectors   08/17/2015   Not Ready for Inspection   ROBERT COLE
  Verify Sprinkler Sign Off   08/17/2015   Not Ready for Inspection   ROBERT COLE
  Light Gage Steel Frame   08/19/2015   Partial Inspection   ROBERT COLE
  T-Bar Ceiling   08/19/2015   Partial Inspection   ROBERT COLE
  T-Bar Ceiling   08/20/2015   Partial Inspection   ROBERT COLE
  Light Gage Steel Frame   08/21/2015   Not Ready for Inspection   ROBERT COLE
  Light Gage Steel Frame   08/24/2015   Partial Inspection   ROBERT COLE
  Light Gage Steel Frame   08/26/2015   Not Ready for Inspection   ROBERT COLE
  Green Building Final   08/31/2015   Partial Approval   BRYAN MEYER
  Light Gage Steel Frame   08/31/2015   Partial Inspection   ROBERT COLE
  Light Gage Steel Frame   09/02/2015   Partial Inspection   ROBERT COLE
  Light Gage Steel Frame   09/03/2015   Partial Inspection   ROBERT COLE
  Light Gage Steel Frame   09/04/2015   Partial Inspection   ROBERT COLE
  Final   09/09/2015   Partial Inspection   ROBERT COLE
  Final   10/07/2015   Partial Inspection   ROBERT COLE
  T-Bar Ceiling   10/16/2015   Approved   ROBERT COLE
  Special/Order Compliance   11/23/2015   Corrections Issued   ROBERT COLE
  Special/Order Compliance   02/16/2016   Not Ready for Inspection   ROBERT COLE
  Special/Order Compliance   02/22/2016   Partial Inspection   ROBERT COLE
  Final   02/24/2016   Not Ready for Inspection   ROBERT COLE
  Footing/Foundation/Slab   02/24/2016   Approved   ROBERT COLE
  Reinforced Masonry Frame   02/24/2016   Partial Approval   ROBERT COLE
  SGSOV-Seismic Gas S/O Valve   02/24/2016   SGSOV Approved   ROBERT COLE
  Smoke Detectors   02/24/2016   Not Ready for Inspection   ROBERT COLE
  Verify Sprinkler Sign Off   02/24/2016   Not Ready for Inspection   ROBERT COLE
  Green Building Final   07/06/2016   Approved   ROLLIN GETTLE III
  Final   07/07/2016   Not Ready for Inspection   ROBERT COLE
  Reinforced Masonry Frame   07/07/2016   Partial Approval   ROBERT COLE
  Smoke Detectors   07/07/2016   Approved   ROBERT COLE
  Verify Sprinkler Sign Off   07/07/2016   Not Ready for Inspection   ROBERT COLE
  Special/Order Compliance   08/08/2016   Partial Inspection   ROBERT COLE
  Final   01/12/2017   OK for TCO   ROBERT COLE
  Reinforced Masonry Frame   01/12/2017   Approved   ROBERT COLE
  Verify Sprinkler Sign Off   01/12/2017   Approved   ROBERT COLE
  Final   01/30/2017   Partial Inspection   JEFFREY DURAN
  Special/Order Compliance   01/30/2017   Partial Inspection   ROBERT COLE
  Special/Order Compliance   02/13/2017   Not Ready for Inspection   ROBERT COLE
  Final   05/24/2017   Not Ready for Inspection   ROBERT COLE
  Special/Order Compliance   01/30/2018   Not Ready for Inspection   ROBERT COLE
  Special/Order Compliance   08/01/2018   Not Ready for Inspection   ROBERT COLE
  Special/Order Compliance   08/07/2018   Partial Inspection   JAMES STEPHENS
  Special/Order Compliance   01/28/2019   Not Ready for Inspection   ROBERT COLE